Monthly Operating Repts for Oct 1989 for Turkey Point,Units 3 & 4
ML17347B426
Person / Time
Site: Turkey Point  
Issue date: 10/31/1989
From: Bonett D
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17347B425 List:
References
NUDOCS 8911280052
Download: ML17347B426 (13)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-250 UNIT Turke Point 3

DATE November 15 1989 COMPLETED BY D M. Bonett TELEPHONE 407

'694-4432 MONTH October 1989 DAY AVERAGE DAILY POWER (MWe-Net) 10/ 1/89 10/ 2/89 1<)/ 3/89 10/ 4/89 10/ 5/89 10'/ 6/89 10/

7/89'0/8/89 18/ '9/89 le/ie/89 1 0/1 1/8' 10/12/89 10/13/89 10/14/89 10/15/89 10/16/89 10/17/89 10/18/89 10/19/89 10/20/89 1'e/21/89 10/22/89 18/23/89 10/24/89 10/25/89 10/26/89 10/27/89 10/28/89 10/29/89, 10/38/89 10/31/89 675 670 670 669

'671 676 672 671 671 669 603 363 383 387 383 384 370 l93 4e4 676 780 701 698 693 688 685 683 684 F86 687 684 S9112S0052 891115 i

PDR ADOCK 05000250 R

PDC

0

'I

~ I I ~

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH October 1989 DOCKET NO.

UNITNAME Turke P

'ATE November 15 1989 COMPLETED BY D.

H. Bonett TELEPHONE Date Type'uration (Hours)

Reason~

Method of Shutting Down Reactor Licensee Event Report¹ System Code4 Component Codes Cause &Corrective Actionto PreventRecurrence 891012 0.0 HH PUHPXX Unit 3 reduced power to repair the 3B Steam Generator Feedwater Pump Thrust Bearing.and to repair the 3B Condenser Materbox Tube Rupture.

Following the repairs, full power operation was resumed.

F Forced S Scheduled Reason A - Equipment Failure (Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)

ExhibitG-instructions forPreparation ofData Entry Scheets Licensee Event Report(LER) File (NUREG4161)

Exhibit1-Same Source

GPERAT:KNG STATUS OF'ERA1'XHG DATA REF'ORT DOCI<ET NG 50 250 DATF ii/15/89 cGMPI ErED BY D, N, BGHl=rr TL.LEr I

~IOHE 407/694/4432 1,

uNX1. HnMF; TURKEY FaxN'r uHxT 3 2+

Rl='PGRTXHG PER:KOD+

OCTOBER 1989 3+

L:KCENSED 1'HERNAI F'OWER (MWT)+

2200 4+

NANI:.PLATE RATXHG (GROSS MWE)+

760 5+

DL-.SXGN ELECTRXCAL RAT:KNG

<NF'T, MWE)t 693 6,

MAXXMIJM DEPEHDAF.:LF CAF'ACXTY

< GROSS NWI:- ):

.699 7+

MAXXMUM DFPENDABLE CAPACITY <HET NWE) +

666 8,

XF CHANGES OCCUR TH ChPACXTY RATXNGS (X'rENS NIJMI ER 3 THROUGH 7)

.XNCE LA 1

REFnr'T~

CXVE REASONS:

POWL.R LEVFL TO WHXCI.I RESTRXCTED~

XF. *HY (HET NWE) 10 i REASOHS FOR RESTIiXCT':I:OHS v XF AHY ~

MONTHLY

-YTD-CUNUL.ATXVE ii.

I-IOURS XH RF'PORT F'E)iXOD I 12'UMBER OF I.IOURS REhCTOR WAS CRXTXCAL 13, REACTOR I'ESEI 'VL SHIJTDOWH HOURS 1 4, I-IOufis CEHERA1'OR ON-L:KNE 15 o

UN:KT RESERVE SHU'I'DGWH HOURS 16 'ROSS THERNAI ENERGY GFNERATED (NWH) 17, GROSS ELFCTR:KChL ENERGY GENERATED

<MWH) 18 i HET.=,ELI-::CTf<XCAL ENERGY GENERATED (MWH) 19, uHxT sERvxcE FAcroR 20o UNXT A'VAXLABXLXTYFACTOR 2ii CAI-'ACX'I'Y FACTOR (LISXNG MDC NET) 22.

cAFAcxrY FhcTOR

<usXHG DER HET) 23.

UN:KT FORCED OUTAGE RATF 2 I s SHUT'DOWNS SCI IEDUL.ED GVI.R HEX'I' NOHTHS 2/:l'5/90 ~

REI-'UELTNI" 745 745+0 8+8 745i0 0+8 1461571 466925 443444 108+8 108+8 89+4 85+9 8+8 7296 4342+5 8+8 4248+6 8+8 8727869 2787850 2623338 58+1 58+1 54+8 51i9 28+8 148209ib 97726.2 844+4 96398i8 121+8 199921618 64058376 60553882 65+8 65t 1 62+6 59+0

,,13+ 1 25,:KF SI-.IUT DOWN:AT END OF REPORT I-'El 'XOD ESTXNATED DATE OF STARTUI=':

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3

DME November 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH October 1989 Unit 3 reduced power to repair the 3B Steam Generator Feedwater Pump Thrust Bearing and to repair the 3B Condenser Waterbox Tube Rupture.

Following the repair, full power operation was resumed.

AVERAGE DA1LY. UNIT POWER LEVEL DOCKET NO. '50-251 UNIT Turke Point 4

DATE November 15 1989 COMPLETED BY D M. Bonett TELEPHONE

. 407 694-4432 i

MONTH October 1989 DAY AVERAGE',DAILY POWER LEVEL (MWe-Net) l'0/ 1/89 10/ 2/89 l.8/ 3/89 10/ 0/89 18/ 5/89 10/ 6/89 10/ 7/89 10/'/89 10/ 9/89 10/18/89 10/11/89 10/12/89 10/13/89 10/10/89 10/15/89

'10/16/89 10/17/89 10'/18/89 10/19/89 10/20/89 18/2l/89

'10/22/89 1'8/23/89 10/24/89

l,8/25/89 ip/26/89 1'8/27/89 1'0/28/8'9 18/29/89 10/38/89 1'8/3:l'/89

-13

-193

-22

-18

-19 20

-l3

.12

-11

-11

-15 20 23

.283 568 663 670 577

-18 49,'96 479 6O8 688 685 537

-23

-17

'359 673

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH

October, 1989 DOCKET NO.

UNlT NA'ME Turkey Point g4.

DATE November 15, 1989 COMPLETED BY TELEPHONE 407 694-4432 No.

Date Type'uration (Hours)

Reason2 Method of Shutting Down Reactor Ucensee Event Report¹ System Code4 Component Codes Cause 8 Corrective Actionto PreventRecurrence 23 24 890915 F

891019 F

328.9

39. 6 HA IA VALVEX INSTRU Unit 4 was manually tripped following a turbine stop valve closure.

The unit outage was extended for repairs of additional components.

Full power operation was delayed for secondary chemistry control and flux mapping.

Unit 4 was taken off line for the Excore Detector N-42.repl.acement.

Full power operation was delayed for secondary chemistry control and detector calibration.

25 891027

50. 3 HA VALVEX Unit 4 was shutdown to repair a

turbine control valve oil leak.

Full power operation was delayed for secondary chemistry control and turbine valve testing.

F Forced S Scheduled 2

Reason A - Equipment Failure (Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)

ExhibitG-Instructions forPreparation ofData EntryScheets Ucensee Event Report(LER) Rie (NUREG4161)

Exhibit1-Same Source

lb

OPE:fiATXNG STATUS OF'ERA'I'XMG DATA REF'ORT DOC f(I='T NO 50 25l DATE 11/15/89 COMPLETED E:Y D ~

H+

E:ONI."..TT Tl-'LFPI-IOME 407/694/4432 1,

UNXT NhHF.::

TUf'I'EY F'OXNT UN:KT 2,

RI=POR I XNG f I=R:I:OD; OC TOE:ER 1989 3+

L:I:CE:NSED THL-:RHAI F'OWER

( HIMT ) +

2208 4a NAHE:F'L.ATE RAT:KNG

<GROSS MRE)+

760 5

()I=.:S:KGM E".LECTRXCAL RAT:KNG (NET MME)'.....

693 6

MAX:KHUM DI=PENDAI=.:LE CAF'ACX'I'Y (GROSS HRI=):

699 7,

MhXXMUH DE:PE:NDAPLI= CAF'ACXTY (MET HHI=):

666 8+

XF CHANGES 'OCCUli XN CAPACX'TY RATXMGS

< X1'EHS NIJHE:ER 3 THROUGI-I 7 )

SXNCE LAST I'EFORT~

CXVE Rl:-.ASOMS:

POLI-::R LLVI=.:L TO kH:I:Cl-I RES TRXCTI=.:D XF AMY

( MET HHE )

18'EASONS FOR REBTRXCTXONSr XF AMYL'ONTHLY YTD-CUHUI..A'I'XVE 11.

I-IOURS:KN RI=PORT F'ERXOD:

12, NUHBI:R OF I-IOURS REhCTOR HAS CRXT:KChL 13 i REAC1'OR liEBEliVI:. 'BH(JTDOHN HOURS l4.

I-IOURS GENERATOR ON-LXNE 15 o

UN:K T Rl:.SERVE SI-IUTDOHM I-IOURS 16, CROSS THERHAI..

I=.:NE:f'CY, GENE:RhTED (HHI-I) 17, CROSS ELEC'I'R1:CAL ENERGY GEMEI'ATED <HWH) 18, MET L.LI='CI:R:KChL'NERGY GENER*'I'ED

<MRH) l9

~

IJN:KT SERVXCE FACTOR 28.

UN:KT AVAXLAB:KLXTYFACTOR 21 'AI='A(.XTY FACTOR (USXMG HD Nl='T) 22, CAF'ACX'I'Y FACTOR

<UBXMG DEfk NE:T)'3 i

(JN:KT FORCED OU1'AGE RATE 24.

SHUTDOWNS SCI-IEDULED OVF.:R NL:XT 6 HOMTI-IS 745 488i8 8+0 326.2 0+0 585941 18355&

165579 43+8 43+8 33+4 32+1

.56+2 7296 2780+1 0+0 2317.2 0.8 4428885 1372759 12" 9786 31 i 8 31+8 25i9 24 i 9

. 31i8 141941+0 93016 i 7 166i6 89511 i 3

. 32.1 l88503385 60121561 56842965 63+1 63ii 61+3 57 i 8

. 12+1 25'I:F SHUT DOWN,AT END OF'EPORT F'ERXOD~

ESTXHATED DATE OF STARTUF".

SUMMARY

OF OPERATING EXPERIENCE

'DOCKET NO'. 50-251 UNIT Turke Point 4

DATE November 15 1989 COMPLETED BY D.

M Bonett TELEPHONE 407 694-4432'EPORT MONTH October 1989 Unit 4 was.manually tripped following a turbine stop valve closure.

The unit outage was extended for repairs of addi.tional components.

Full power operation was delayed for secondary chemistry control and flux mapping.

The unit was taken off line for the Excore Detector N-42 replacement.

.Full power operation was delayed for secondary chemistry control and detector calibration.

Unit 4 was.shutdown to repair a turbine control valve,oil leak.

Full power operation was del'ayed for secondary chemistry control and turbine valve testing.