Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1990-005, :on 900316,health Physics Shift Supervisor Found to Be Contaminated While Exiting Containment Bldg. Cause Not Yet Identified.Frequency of Hot Particle Surveys for Check Valve Tent Increased + (15:14:41, 7 January 2025)
- ML17348A185 + (15:14:43, 7 January 2025)
- ML17348A183 + (15:14:43, 7 January 2025)
- L-90-126, Forwards, 1989 Annual Radiological Environ Operating Rept & State of Fl Radiological Surveillance of Florida Power & Light Co Turkey Point Site + (15:14:44, 7 January 2025)
- L-90-136, Responds to NRC Re Violations Noted in Insp Repts 50-250/89-53 & 50-251/89-53.Corrective Actions:Existing Administrative Procedures Revised & New Procedures Developed to Provide Detailed Mgt Controls + (15:14:46, 7 January 2025)
- L-90-135, Monthly Operating Repts for Mar 1990 for Turkey Point Units 3 & 4 + (15:14:48, 7 January 2025)
- L-90-134, Responds to Violations Noted in Insp Repts 50-250/90-04 & 50-251/90-04.Corrective Actions:Individuals Counseled Re Adherence to Clearance tag-out &/Or Tag Removal Procedures & Event Discussed W/Personnel During Shift Crew Meetings + (15:14:50, 7 January 2025)
- ML17348A176 + (15:14:51, 7 January 2025)
- ML17348A174 + (15:14:52, 7 January 2025)
- ML17348A175 + (15:14:52, 7 January 2025)
- ML17348A172 + (15:14:53, 7 January 2025)
- IR 05000250/1989054 + (15:14:54, 7 January 2025)
- ML17348A169 + (15:14:55, 7 January 2025)
- L-90-122, Forwards List of Steam Generator Tubes Either Plugged or Replugged & Inspected from 900228-0323 + (15:14:56, 7 January 2025)
- 05000250/LER-1990-004, :on 900306,surveillance Test of Emergency Diesel Generator Not Completed.Caused by Misinterpretation by Sys Engineer of Safety Evaluation for 4,160 Volt Bus Outage.Personnel Reinstructed + (15:14:58, 7 January 2025)
- PNO-II-90-017A, contractor Health Physics Technician Strike Activity Attempted at Facilities.Some Craft Workers at Hatch Joined Technicians in Sympathy Strike.Turkey Point & St Lucie Terminated Contract W/Striking Technicians + (15:15:01, 7 January 2025)
- ML17348A164 + (15:15:03, 7 January 2025)
- ML17348A162 + (15:15:03, 7 January 2025)
- 05000251/LER-1990-002-02, :on 900228,post-accident Containment Vent Found Inoperable for 13 Days,Contrary to Tech Spec Limit. Caused by Personnel Error.Cautions Added to Local Leak Rate Test Procedure + (15:15:05, 7 January 2025)
- 2CAN121702, License Amendment Request Post-Accident Instrumentation Technical Specification Revision + (15:15:06, 7 January 2025)
- Press Release-IV-17-021, NRC Proposes $22,400 Fine Against Qal-Tek Associates + (15:15:07, 7 January 2025)
- IR 05000327/2017490 + (15:15:08, 7 January 2025)
- L-2017-215, Independent Spent Fuel Storage Installation (ISFSI) - Cask Registration Notification + (15:15:09, 7 January 2025)
- ONS-2017-087, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from . + (15:15:10, 7 January 2025)
- ML17348A073 + (15:15:13, 7 January 2025)
- CP-201700977, Core Operating Limits Report, Rev. 1 + (15:15:14, 7 January 2025)
- PLA-7658, Seventh Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Operation Under Severe Accident + (15:15:15, 7 January 2025)
- L-17-353, No Active Safety Function Anchor Darling Double Disc Gate Valves + (15:15:18, 7 January 2025)
- ML17348A029 + (15:15:19, 7 January 2025)
- ML17348A027 + (15:15:20, 7 January 2025)
- IR 05000335/1990029 + (15:15:22, 7 January 2025)
- ML17348A024 + (15:15:24, 7 January 2025)
- ML17348A020 + (15:15:25, 7 January 2025)
- ML17348A019 + (15:15:26, 7 January 2025)
- RAIO-1217-57654, LLC Response to NRC Request for Additional Information No. 262 (Erai No. 8847) on the NuScale Design Certification Application + (15:15:27, 7 January 2025)
- ML17347B697 + (15:15:30, 7 January 2025)
- ML17347B687 + (15:15:34, 7 January 2025)
- ML17347B688 + (15:15:34, 7 January 2025)
- ML17347B685 + (15:15:35, 7 January 2025)
- ML17347B683 + (15:15:36, 7 January 2025)
- ML17347B682 + (15:15:39, 7 January 2025)
- ML17347B680 + (15:15:41, 7 January 2025)
- ML17347B674 + (15:15:42, 7 January 2025)
- ML17347B672 + (15:15:43, 7 January 2025)
- DCL-17-106, Nuclear Material Transaction Report for New Fuel + (15:15:44, 7 January 2025)
- ML17347B670 + (15:15:44, 7 January 2025)
- ML17347B652 + (15:15:46, 7 January 2025)
- ML17347B650 + (15:15:47, 7 January 2025)
- L-90-105, Responds to Violations Noted in Insp Repts 50-250/89-203 & 50-251/89-203.Corrective Action:Operations Procedure 3-OP-030 Revised to Include Valve 3-10-749 + (15:15:48, 7 January 2025)
- L-90-114, Forwards Integrated Schedule Regulatory Rept for Jan 1990. Changes Discussed W/Nrc Project Manager in Accordance W/ Integrated Schedule Plan + (15:15:51, 7 January 2025)
- PNO-II-90-017, on 900326,picket Line Established on Access Road to Plant by HP Contractor Workers.No Further Impact Anticipated to Util Operators or Employees + (15:15:55, 7 January 2025)