ML17348A027

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1993 for St Lucie,Units 1 & 2.W/930210 Ltr
ML17348A027
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/31/1993
From: Breen J, Sagar D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-93-29, NUDOCS 9302180204
Download: ML17348A027 (13)


Text

, ACCEI.ERAT DOCUMENT DISTR UTION SYSTEM REGULATO. INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9302180204 DOC.DATE:

FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

+~~ NOTARIZED: NO

& Light Co.

DOCKET 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BREENiJ.J. Florida Power & Light Co.

SAGAR,D.A. ~ Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Month crating repts for Jan 1993 for St Lucie,units 1 &

2.W/ 30210 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL I SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 NORRISEJ 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 1

1 1

1 1

1 GFL01 NRR Q/LPEB10 1 1

1 1

EXTERNAL EG&G - BRYCE E J ~ H. 1 . 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

a ~

'C I (j

P.O. Box 128, Ft. Pierce, FL 34954-0128 February 10, 1993 L-93-29 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Nashington, DC 20555 Re:= St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the January, 1993, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, b 4 ~4Am 8~ @+~ager Vic resident St. Lucie Plant DAS.JJB kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL 4854-93 i 9302180204 930131 PDR ADOCK 05000335 R PDR an FPL Group company

4 l I y

AVERAGE DAZLY UNIT POWER LEVEL DOCKET NO ~ 50-335 i

DATE COMPLETED BY J.J. Breen MONTH JANUARY 1993 DAY AVERAGE DAZLY POWER LEVEL (MWe-Net) 1/ 1/93 850 1/ 2/93 844 1/ 3/93 836 1/ 4/93 842 1/ 5/93 837 1/ 6/93 836 1/ 7/93 833 1/ 8/93 835 1/ 9/93 834 1/10/93 831 1,/11/93 673 1/12/93 545 1/13/93 645 1/14/93 829 1/15/93 846 1/16/93 849 1/17/93 850 1/18/93 854 1/19/93 851 1/20/93 853 1/21/93 854 1/22/93 851 1/23/93 845 1/24/93 841, 1/25/93 839 1/26/93 841 1/27/93 849 1/28/93 855 1/29/93 855 1/30/93 856 1/31/93 855

OPERATING DATA REPORT DOCKET NO 50 - 335 DATE COMPLETED BY J. J. BREEN TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: JANUARY 1993
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 744 141264.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 109414.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR ON-LINE 744.0 744.0 108419.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1964148 1964148 280299858
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 645820 645820 92505720
18. NET ELECTRICAL ENERGY GENERATED (MWH) 612354 612354 87438224
19. UNIT SERVICE FACTOR 100.0 100.0 76.7
20. UNIT AVAILABILITYFACTOR 100.0 100.0 76.8
21. CAPACITY FACTOR (USING MDC NET) 98.1 98.1 76.3
22. CAPACITY FACTOR (USING DER NET) 99.2 99.2 75.5
23. UNIT FORCED OUTAGE RATE 0.0 0.0 4.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 3/25/93; FOR REFUELING
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-335 UNIT NAME T IE T1 DATE COMPLETED BY BREEN TELEPHONE 4 4 -424 REPORT MONTH A ARY 1 No. Date Type'uration Reasons Method of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Down Prevent Recurrence Reactor 930111 0.0 B N/A HF XXXXXX Unit 1 was downpowered for waterbox cleaning.

F Forced Reason Method Exhibit G - Instructions for S Scheduled h - Equipment failure (explain) l - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG<16l)

D - R<<gulatory restriction 4 - Continued E - Operator Training dt License Examination S - Load Reduction F - Administrative 9 - Other (Explain) Extubit t - Same Source G - Operational Error (Expalin)

H - Other (Explain)

Nlsar iPL

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ 50-335 DATE COMPLETED BY J.J. Breen REPORT MONTH JANUARY 1993 From January 11, 1993, until January 14, 1993, Unit 1 was downpowered for waterbox cleaning. On January 14, 1993, Unit 1 was returned to 100% power; the average daily power of Unit 1 was 100%

for the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POSER LEVEL DOCKET NO ~ 50 389 DATE COMPLETED BY J.J. Breen TELEPHONE 407 468-4248 MONTH JANUARY 1993 DAY AVERAGE DAILY POSER LEVEL (Mwe-Net) 1/ 1/93 855 1/ 2/93 853 1/ 3/93 850 1/ 4/93 853 1/ 5/93 852 1/ 6/93 851 1/ 7/93 851 1/ 8/93 852 1/ 9/93 852 1/10/93 851 1/11/93 851 1/12/93 850 1/13/93 -3 1/14/93 -18 1/15/93 -8 1/16/93 -8 1/17/93 -8 1/18/93 -8 1/19/93 -8 1/20/93 -7 1/21/93 -6 1/22/93 -6 1/23/93 -6 1/24/93 -8 1/25/93 -8 1/26/93 -8 1/27/93 -8 1/28/93 -9 1/29/93 -11 1/30/93 -23 1/31/93 -23

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE COMPLETED BY J. J. BREEN TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: JANUARY 1993
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 744 83161.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 290.5 290.5 70694.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 289.9 289.9 69495.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED .(MWH) 779528 779528 182144530
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 259030 259030 60738680
18. NET ELECTRICAL ENERGY GENERATED (MWH) 240380 240380 57432122
19. UNIT SERVICE FACTOR 39.0 39.0 83.6
20. UNIT AVAILABILITYFACTOR 39.0 39.0 83.6
21. CAPACITY FACTOR (USING MDC NET) 38.5 38.5 83.5
22. CAPACITY FACTOR (USING DER NET) 38.9 38.9 83.8

~

23. UNIT FORCED OUTAGE RATE 61.0 61.0 6.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 IF SHUT DOWN AT END OF REPORT PERIOD g EST IMATED DATE OF STARTUP /

3 1 5/93

UNIT SHV]K)OWNS AND POWER REDUCTIONS DOCKET NO. 50-389 UNIT NAME T IE DATE COMPLETED BY BREEN TELEPHONE 4 4 -424 REPORT MONTH JA ARY I No.

Date Type Duration (Hours)

Reason~ Method of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down Prevent Recurrence 930112 0.0 N/A CB PUMPXX Unit 2 was downpowered due'to high vibration of the 2A 1 Reactor Coolant Pump.

930113 454.1 A N/A CB PUMPXX Unit 2 was taken offline due to high vibration of the 2A1 Reactor Coolant Pump.

F Forced Reason Method Exhibit G - Insttuctioas for S Scheduled h - Equipmcat failure (explain) I - Manual Preparation of Data Entry B - Maintcnancc or Test 2 - Manual Scram Sheets Liccascc Event Rcport C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training dt, License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhbit I - Same Source G - Operational Error (Expalin)

H - Other (Explain)

SUMMARY

OP OPERATING EXPERIENCE DOCKET NOe 50-389 DATE COMPLETED BY J.J. Breen TELEPHONE 407 468-4248 REPORT MONTH JANUARY 1993 Unit 2 was at 100% power from January 1, 1993, until January 12, 1993. On January 12, 1993, Unit 2 was downpowered and then taken offline due to high vibration of the 2A1 Reactor Coolant Pump. The Unit remained offline for the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

e ~ t~