ML17348A172

From kanterella
Jump to navigation Jump to search
Forwards Corrected Semiannual Repts for Jul 1987 - Dec 1988 for Turkey Point Units 3 & 4,correcting Errors in Activity Calculations for Radwaste Shipments Made in 1987 & 1988
ML17348A172
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/09/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17348A173 List:
References
L-90-78, NUDOCS 9004200124
Download: ML17348A172 (4)


Text

ACCELERATED DISTRIBUTION DEMONSTPA.TION SYSHM

\\>>

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004200124 DOC.DATE: 90/04/09 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION HARRIS,K.N.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document, Control Branch (Document Control Desk)

SUBJECT:

Forwards corrected semiannual repts for Jul 1987 Dec 1988 for Turkey Point Units 3

& 4.

DISTRIBUTION CODE:

IE25D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Environmental Monitoring Rept (per Tech Specs)

NOTES DOCKET 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: AEOD/DSP/TPAB NRR ROTHMAN,R NUDOCS-ABSTRACT RGN2 DRSS/RPB EXTERNAL EG &G SIMPSON g F NRC PDR COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 2

2 1

1 RECIPIENT ID CODE/NAME PD2-2 PD IRM TECH ADV NRR/DR B11 E

1 RG 02 LPDR COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEt CONTACTTHE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL 18

Ii J

0 P.O. Box14000, Juno Beach, FL 33408-0420 APR 9

19rSU L-90-78 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Corrections to Solid Waste Sections of Semi-Annual Re orts from Jul 1987 to December 1988 As a result of a Quality Assurance

audit, FPL identified certain errors in the activity calculations for several radioactive waste shipments made in 1987 and
1988, and reported in the Solid Waste Sections of the Semi-Annual Reports for July 1987 through December
1987,

,January 1988 through June

1988, and July 1988 through December 1988.

These errors have been corrected.

The attached revised pages replace the pages previously submitted in L-88-101, dated February 29,

1988, L-88-367, dated August 29,
1988, and L-89-75, dated March 2, 1989, respectively.

Should there be any questions regarding this information, please contact us.

Very truly yours, K.

N a

Y4 Vice resident Turkey Point Plant Nuclear KNH/DMB Attachment, cc:

Stewart D. Ebneter, Regional Admini trator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9004200124 900409 PDR ADOCK 05000250 R

PDC an FPL Group company

0 l

~

L

'G(j s<