ML17347B650
| ML17347B650 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/28/1990 |
| From: | Harris K FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-90-94, NUDOCS 9004050454 | |
| Download: ML17347B650 (5) | |
Text
. ACCELERATED DISTjuBUTION DEMONSTlRATION SY,')Egal
~,
~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9004050454 DOC.DATE: 90/03/28 NOTARIZED:
NO
,'DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C '05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HARRIS,K.N.
Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) f
SUBJECT:
Forwards Feb 1990 progress summary of select sys assessment.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2
~ NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 5
5 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E O.C 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
0 1
1 1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASIEI CONTACT THE.DOCUMENT CONTROL DESK,
'OOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISHUBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21.
ENCL 19 i
J I
I
~
1 c q A';
t
P.O. Box 029100, Miami, FL, 33102-9100 NR 28 SSQ L-90-94 U.
S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the February 1990 progress summary of the Select System Assessment.
Should there be any questions regarding this information, please contact us.
Very truly yours, K. N.
arris Site Vice President Turkey Point Plant Nuclear KNH/RWG/sem Attachment cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant PDR
~O+>4 9003>8 OCR O~0002gO r~
i PDC
~(,,I.
an FPL Group companY
I jjgE) 8 5
SELECT SYSTEM REVIEW FEBRUARY 1990 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265)
Completed January 19, 1990 MISCELLANEOUS ITEMS Unit 3
RHR Valve Replacement (IS Mod 519)
Scheduled completion during the February 1990 (currently in progress),
Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565)
Scheduled completion during the next Unit 4 Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)
Scheduled completion to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in November 1990.
ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P
& ID's (IS Mod 1042)
Scheduled for completion during the February 1990 (currently in progress),
Unit 3
Refueling Outage.
P
& ID Update Schedule to be determined following walkdowns, but no later than August 31, 1990.