Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17352A993 + (13:50:49, 7 January 2025)
- ML17352A992 + (13:50:50, 7 January 2025)
- ML17352A991 + (13:50:52, 7 January 2025)
- ML17352A986 + (13:50:53, 7 January 2025)
- ML17352A975 + (13:50:54, 7 January 2025)
- L-94-328, Advises That Recommended Current Order Timing Mod,Per GL 93-04,will Be Implemented During Next Refueling Outage for Unit 3 Scheduled to Start in Sept 1995 & Unit 4 Scheduled to Start in Mar 1996 + (13:50:55, 7 January 2025)
- L-94-301, Forwards Response to 10CFR50.46, Acceptance Criteria for ECCS in Light Water Power Reactors, Satisfying Annual Reporting Requirements for Util Turkey Point Units 3 & 4 + (13:50:57, 7 January 2025)
- TAC:85616 + (13:50:58, 7 January 2025)
- ML17352A963 + (13:51:00, 7 January 2025)
- L-94-327, Submits Financial Info,Per 10CFR140.21.Licensee 1993 Form 10-K,most Recent Annual Financial Rept,Attached as Exhibit 1 + (13:51:02, 7 January 2025)
- L-94-306, Responds to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers Issued by NRC on 931220,to Help Insure Timely Resolution of Fire Barrier at Facility Units 2 & 3 + (13:51:04, 7 January 2025)
- ML17352A960 + (13:51:10, 7 January 2025)
- ML17352A958 + (13:51:12, 7 January 2025)
- L-94-319, Forwards Util Scope & Objectives for 1995 Facility Annual EP Exercise + (13:51:13, 7 January 2025)
- L-94-293, Provides Update on Items Completed at Plant During 941003-1114 Cycle 15 Refueling Outage.Summarizes Regulatory Activities & Items of Regulatory Interest,For Which Action Taken During Refueling Outage + (13:51:15, 7 January 2025)
- L-94-317, Forwards Rev 28 to Radiological Emergency Plan. Attachment 1 Provides Summary of Plant Radiological Emergency Plan Rev 28 Changes + (13:51:16, 7 January 2025)
- 05000251/LER-1994-006-02, :on 941130,Unit 4 Tripped Automatically.Caused by Failure of Flexible Link Connection Between Main Generator B Phase Bus & Associated Isolated Phase Bus Bar. All Bolts on Flexible Link Checked + (13:51:19, 7 January 2025)
- L-94-313, Monthly Operating Repts for Nov 1994 for Turkey Point Units 3 & 4 + (13:51:21, 7 January 2025)
- ML17352A950 + (13:51:21, 7 January 2025)
- ML17352A947 + (13:51:24, 7 January 2025)
- ML17352A946 + (13:51:25, 7 January 2025)
- ML17352A940 + (13:51:26, 7 January 2025)
- ML17352A939 + (13:51:28, 7 January 2025)
- ML17352A938 + (13:51:29, 7 January 2025)
- ML17352A935 + (13:51:30, 7 January 2025)
- L-94-292, Forwards Plant Procedures & Training Material Provided for Preparation of Licensing Exams for Reactor Operator Group Xv & SRO Upgrade 94,scheduled for Week of 950227 + (13:51:31, 7 January 2025)
- L-94-279, Submits Commitments Re Containment Structural Reanalysis Meeting.Util Appreciated Opportunity to Meet W/Nrc Staff + (13:51:33, 7 January 2025)
- ML17352A930 + (13:51:35, 7 January 2025)
- IR 05000250/1994021 + (13:51:40, 7 January 2025)
- ML17352A920 + (13:51:41, 7 January 2025)
- IR 05000250/1994020 + (13:51:58, 7 January 2025)
- ML17352A911 + (13:52:00, 7 January 2025)
- TAC:M89934 + (13:52:01, 7 January 2025)
- ML17352A907 + (13:52:02, 7 January 2025)
- L-94-290, Forwards Rept of Unsatisfactory Performance Testing Incident.Rept Details Investigative Analysis of Unsatisfactory Blind Specimen Result,Including Cause & C/A Taken by Smithkline Beecham Clinical Lab + (13:52:03, 7 January 2025)
- L-94-289, Monthly Operating Repts for Oct 1994 for Turkey Points Units 3 & 4 + (13:52:05, 7 January 2025)
- ML17352A895 + (13:52:07, 7 January 2025)
- IR 05000250/1994019 + (13:52:11, 7 January 2025)
- ML17352A890 + (13:52:13, 7 January 2025)
- ML17352A889 + (13:52:15, 7 January 2025)
- ML17352A888 + (13:52:19, 7 January 2025)
- 05000250/LER-1994-005-03, :on 941103,design Defect in Safeguards Bus Sequencer Test Logic Places Both Units Outside Design Basis. Caused by 3A Sequencer Failed to Respond as Expected to Opposite Unit SI Signal + (13:52:21, 7 January 2025)
- 05000250/LER-1994-004-03, :on 941103,Unit 3 Outside Design Basis Due to Two of Three Required Safety Injection Pumps Inoperable. Control Switches for 3A & 3B Safety Injection Pumps Immediately Returned to Automatic + (13:52:23, 7 January 2025)
- L-94-264, Forwards Turkey Point Nuclear Plant,Simulator Certification Update 1, Per 10CFR55.45 + (13:52:24, 7 January 2025)
- ML17352A884 + (13:52:24, 7 January 2025)
- ML17352A881 + (13:52:27, 7 January 2025)
- ML17352A880 + (13:52:28, 7 January 2025)
- IR 05000250/1994099 + (13:52:30, 7 January 2025)
- ML17352A877 + (13:52:31, 7 January 2025)
- ML17352A875 + (13:52:32, 7 January 2025)
- IR 05000250/1994018 + (13:52:50, 7 January 2025)