Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-95-248, Application for Amend to License DPR-31 & DPR-41,modifying Plant TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/ Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations + (13:41:09, 7 January 2025)
- ML17353A397 + (13:41:09, 7 January 2025)
- L-95-268, Forwards ISI of Four SGs Conducted on 941014-17.Informs of No SG Tubes Plugged as Result of Insp + (13:41:11, 7 January 2025)
- ML17353A394 + (13:41:11, 7 January 2025)
- IR 05000250/1995015 + (13:41:24, 7 January 2025)
- L-95-267, Forwards Table Provided Identifying Tubes Plugged in SG B, Per TS 4.4.5.5.a & Insp Conducted from 950914-19 + (13:41:26, 7 January 2025)
- ML17353A389 + (13:41:26, 7 January 2025)
- ML17353A386 + (13:41:28, 7 January 2025)
- ML17353A384 + (13:41:32, 7 January 2025)
- L-95-250, Application for Amends to Licenses DPR-31 & DPR-41, Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint + (13:41:33, 7 January 2025)
- ML17353A383 + (13:41:33, 7 January 2025)
- ML17353A379 + (13:41:36, 7 January 2025)
- ML17353A372 + (13:41:37, 7 January 2025)
- ML17353A373 + (13:41:37, 7 January 2025)
- ML17353A370 + (13:41:38, 7 January 2025)
- ML17353A369 + (13:41:39, 7 January 2025)
- ML17353A368 + (13:41:40, 7 January 2025)
- ML17353A367 + (13:41:41, 7 January 2025)
- ML17353A366 + (13:41:42, 7 January 2025)
- ML17353A364 + (13:41:44, 7 January 2025)
- ML17353A363 + (13:41:45, 7 January 2025)
- 05000250/LER-1995-005-01, :on 950818,containment Pressure Testing Procedure Resulted in Inhibiting Both Trains of Containment Pressure from Initiated Esf.Revised Procedure to Require Testing of Each Train Separately + (13:41:49, 7 January 2025)
- L-95-249, Forwards COLR for Turkey Point Unit 3 + (13:41:50, 7 January 2025)
- ML17353A358 + (13:41:50, 7 January 2025)
- ML17353A355 + (13:41:55, 7 January 2025)
- L-95-255, Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4 + (13:41:56, 7 January 2025)
- ML17353A353 + (13:42:01, 7 January 2025)
- L-95-207, Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 10.1 from GL 93-05, Line-Item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation & Guidance in GL 94-01 + (13:42:02, 7 January 2025)
- L-95-041, Informs NRC That Util Intends to Terminate Boraflex Coupon Surveillance Testing Program While Continuing Blackness Testing of Plant Spent Fuel Pool Boraflex Panels + (13:42:04, 7 January 2025)
- L-95-247, Requests for Exemption from Type a Testing Interval Specified in 10CFR50,App J for Plant + (13:42:08, 7 January 2025)
- ML17353A347 + (13:42:12, 7 January 2025)
- L-95-235, Forwards Response to NRC 941012 RAI Re Outdoor Exemption for Thermo-Lag 330-1 Fire barriers.W/25 Oversize Drawings + (13:42:13, 7 January 2025)
- ML17353A344 + (13:42:17, 7 January 2025)
- ML17353A343 + (13:42:18, 7 January 2025)
- ML17353A336 + (13:42:18, 7 January 2025)
- IR 05000250/1995013 + (13:42:20, 7 January 2025)
- ML17353A330 + (13:42:22, 7 January 2025)
- ML17353A329 + (13:42:23, 7 January 2025)
- L-95-229, Monthly Operating Repts for Jul 1995 for Turkey Point Units 1 & 2 + (13:42:24, 7 January 2025)
- IR 05000250/1995014 + (13:42:30, 7 January 2025)
- ML17353A317 + (13:42:32, 7 January 2025)
- ML17353A316 + (13:42:33, 7 January 2025)
- L-95-206, Submits Request for Schedular Exemption from Requirements of 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors + (13:42:39, 7 January 2025)
- L-95-224, Responds to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (13:42:41, 7 January 2025)
- ML17353A312 + (13:42:45, 7 January 2025)
- IR 05000250/1995011 + (13:42:54, 7 January 2025)
- ML17353A306 + (13:42:55, 7 January 2025)
- PNO-II-95-046B, on 950801,both Units to Plant Will Be Shutdown in Anticipation of Hurriance Erin.Region II Personnel Closely Tracking Hurricane Progress Throughout Incident Response Ctr + (13:42:57, 7 January 2025)
- PNO-II-95-046, on 950731,util Declared Notification of Unusual Event Upon Declaration of Hurricane Warning for Southeastern Florida.Reviewed Procedures & Plant Status to Prepare for Hurricane.Dispatched Er Vehicle & Staff to Site + (13:42:59, 7 January 2025)
- PNO-II-95-046C, on 950801,both Units to Plant Had Been Shutdown in Anticipation of Hurricane Erin.Open Communication Line Will Be Established Upon Arrival of Hurricane Winds + (13:43:01, 7 January 2025)
- PNO-II-95-046A, on 950731,plants Made Preparations for Anticipation of Hurricane Erin W/Shutting Down of St Lucie Unit 2.Region II Personnel Sent to Turkey Point Site to Augment Staff & All Four Emergency Diesels Tested + (13:43:03, 7 January 2025)