ML17353A358
| ML17353A358 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/08/1995 |
| From: | FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17353A357 | List: |
| References | |
| NUDOCS 9509190038 | |
| Download: ML17353A358 (5) | |
Text
CORE OPERATING LIMITS REPORT FOR FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNIT 3 9509190038 950908 PDR 4DOCK 05000250 P,
L-95-249 Attachment Page 1
CORE OPERATZNG LXMZTS REPORT The Core Operating Limits Report (COLR) for Turkey Point Unit 3 Cycle 15 has been prepared in accordance with the requirements of Technical Specifications 6.9.1.7.
The Technical Specifications affected by this report are:
3.2.1 3.1.3.6 3/4.2.2 Axial Flux Difference (AFD)
Control Rod Insertion Limits Heat Flux Hot Channel Factor F~(Z)
The AFD, K(Z) and Rod Bank Insertion Limits have been developed using the NRC approved methodology specified in Technical Specification 6.9.1.7.
The affected curves are provided in the attached figures.
The All-Rods-Out (ARO) position for Turkey Point Unit 3 Cycle 15 is 228 steps withdrawn.
L-95-249 Attachment Page 2
A)~ PLUX DXPPBZGKCE AS A PUNCTXON OP XULTED THERMAL POWER (TURKEY POZNT UNZT 3 CYCLE 15) 100 g
2 80 EKr 60 I-0 Ul cC O
20 UNAC EPTAB OP RATlON
(-30)50)
(-10) 100)
CCEPTA OPERA ON
(+7,100)
(+25,50)
UNAC EPTAS OP RATlON
-40 40
-20
-10 0
10 20 Axial Rux DNerence (%)
L-95-249'ttachment Page 3
ROD BANK INSERTXON LIMITS VS.
THERMAL POWER ALL RODS OUT = 228
- STEPS, OVERLAP = 100 STEPS (TURKEY POINT UNXT 3 CYCLE 15) 216 63.6,
)
BANK 168 C
156 144 132 N
108 C
O 96 72 O
60 BANKD 24 12 10 40 50 60 Peroent Reector Power
L-95-249 Attachment Page 4
K(Z) NORMALIZED Fg(Z)
AS A FUNCTION PF CORE HEIGHT (TURKEY POINT UNIT 3 CYCLE 15) 1.0 (0,1.000 (8,1.000)
O.024) 0.9 0.7 0.6 0.5 Core Height (tt) 10 11