Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1996-004, :on 970107,identified Three Instances of Inadequate Surveillance Testing.Caused by Inadequate Surveillance Procedures.Surveillance Procedures Revised + (13:26:00, 7 January 2025)
- 05000250/LER-1996-004-03, Forwards LER 96-004-03 Re TS Surveillance Procedure Review for Identification of Inadequate Surveillance Testing,Per GL 96-01 + (13:26:02, 7 January 2025)
- ML17354A403 + (13:26:04, 7 January 2025)
- ML17354A402 + (13:26:05, 7 January 2025)
- ML17354A400 + (13:26:06, 7 January 2025)
- ML17354A396 + (13:26:10, 7 January 2025)
- 05000364/LER-1917-003, Regarding Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits + (13:26:12, 7 January 2025)
- L-97-021, Forwards Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (13:26:13, 7 January 2025)
- ML17354A385 + (13:26:17, 7 January 2025)
- ML17354A393 + (13:26:17, 7 January 2025)
- ML17354A383 + (13:26:19, 7 January 2025)
- ML17354A381 + (13:26:22, 7 January 2025)
- 05000250/LER-1996-012-01, :on 961204,determined Containment Average Temp Being Determined Based on Only Two Temp Elements Instead of Three as Required by Tss.Caused by Log Only Requiring One Entry.Log Revised + (13:26:24, 7 January 2025)
- L-96-334, Submits Price Anderson Guarantees Form 10-K Annual Financial Rept Per 10CFR50.71(b) + (13:26:26, 7 January 2025)
- L-96-299, Submits Response to RAI Re GL 92-01,Rev 1, Reactor Vessel Structural Integrity + (13:26:30, 7 January 2025)
- ML17354A374 + (13:26:32, 7 January 2025)
- L-96-300, Application for Amends to Licenses DPR-31 & DPR-41,modifying TS to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp + (13:26:33, 7 January 2025)
- IR 05000250/1996012 + (13:26:48, 7 January 2025)
- ML17354A369 + (13:26:50, 7 January 2025)
- L-96-318, Requests for Exemption from Certain Requirements of 10CFR50 App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101 + (13:26:51, 7 January 2025)
- L-96-322, Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4 + (13:27:05, 7 January 2025)
- ML17354A365 + (13:27:05, 7 January 2025)
- TAC:M95012 + (13:27:07, 7 January 2025)
- L-96-311, Responds to RAI Re NRC Bulletin 96-001, Control Rod Insertion Problems. Hot Rod Drop Test Results,Encl + (13:27:08, 7 January 2025)
- ML17354A359 + (13:27:11, 7 January 2025)
- TAC:M94326 + (13:27:12, 7 January 2025)
- ML17354A355 + (13:27:13, 7 January 2025)
- IR 05000250/1996011 + (13:27:14, 7 January 2025)
- ML17354A352 + (13:27:15, 7 January 2025)
- L-96-210, Application for Amends to Licenses DPR-31 & DPR-41, Requesting Rev to Allow Unit 3 Diesel Fuel Oil Storage Tank to Be Drained,Inspected & Cleaned While Maintaining at Least One Unit 3 Diesel Operable + (13:27:16, 7 January 2025)
- L-96-309, Forwards Clarification of Verbiage in Section 7.2.2 Paragraph 2 of St Lucie Radiological Emergency Plan + (13:27:18, 7 January 2025)
- L-96-285, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/96-11 & 50-251/96-11.Corrective Actions:Compensatory Measures in Form of Fire Watches for Fire Zone 64 & 143 Will Remain in Effect Until Mods Completed + (13:27:20, 7 January 2025)
- L-96-289, Requests Withdrawal of Relief Request 6 Re Inservice Insp Program + (13:27:24, 7 January 2025)
- L-96-247, Provides Comments on Areas Listed in Ltr,Namely Accuracy of Staff Understanding of Plant Design & Safety Significance of Design Features + (13:27:29, 7 January 2025)
- ML17354A337 + (13:27:31, 7 January 2025)
- ML17354A333 + (13:27:32, 7 January 2025)
- L-96-284, Informs of Completion of Plant Modifications to Support Thermal Power Uprate.Revisions to ERDS Data Point Library, Encl + (13:27:33, 7 January 2025)
- L-96-278, Forwards Uprated Core Operating Limits Rept for Turkey Point Unit 4 + (13:27:35, 7 January 2025)
- ML17354A330 + (13:27:35, 7 January 2025)
- L-96-279, Forwards Results of Use of Revised ECCS Evaluation Models to Support Implementation of TS Amendments 191/185 + (13:27:37, 7 January 2025)
- 05000250/LER-1996-011-01, :on 961009,potential for Overpressurizing Post Accident Containment Vent Filter Housings Occurred.Caused by Improper Change Mgt.Monitoring Sys Operating Procedures Revised + (13:27:40, 7 January 2025)
- L-96-286, Responds to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (13:27:41, 7 January 2025)
- L-96-282, Informs That Several Plant Mods Have Been Completed to Support Thermal Power Uprate.Revised Descriptions in ERDS Data Point Library Encl + (13:27:42, 7 January 2025)
- TAC:M96715 + (13:27:44, 7 January 2025)
- ML17354A319 + (13:27:45, 7 January 2025)
- L-96-268, Forwards Response to NRC Bulletin 96-001, CR Insertion Problems + (13:27:46, 7 January 2025)
- ML17354A314 + (13:27:48, 7 January 2025)
- ML17354A312 + (13:27:49, 7 January 2025)
- ML17354A310 + (13:27:50, 7 January 2025)
- L-96-270, Forwards Response to GL 96-06, Assurance of Equipment Ooperability & Containment Integrity During Design Basis Accident Conditions + (13:27:51, 7 January 2025)
- 05000250/LER-1996-010-01, :on 960924,manual Reactor Shutdown Occurred. Caused by Failed Rod Control Sys Regulation Card in 2AC Power cabinet.2AC Power Cabinet DC Power Supplies,Cabling & Connectors Checked + (13:27:57, 7 January 2025)