ML17354A383
| ML17354A383 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/18/1996 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Plunkett T FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 9701140249 | |
| Download: ML17354A383 (3) | |
Text
December 18, 1996 Florida Power and Light Company ATTN:
Hr. T. F. Plunkett President
- Nuclear Division P. 0.
Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
Dear Mrs Plunkett:
In a telephone conversation on December 16,
- 1996, Glen Blinde, Nuclear Training Supervisor and George Hopper, License Examiner, Region II Operator Licensing and Human Performance
- Branch, made arrangements for the NRC to inspect the licensed operator requalification program at the Turkey Point Plant.
The inspection is planned for the week of January 13, 1997.
The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs.
In order for the NRC to adequately prepare for this inspection, please furnish the oper ating test materials scheduled for the week of the inspection to the NRC by January 6,
1997.
The request for requalification examination material is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30, 1997.
The estimated average burden is 4.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per response, including gathering,
- copying, and mailing the required material.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, T-6 F33, Division of Information Support Services, Office of Information Resources Hanagement, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Hanagement and Budget, Washington, D. C. 20503.
14OOSV 9'70ii4024'P 96i2i8 PDR ADQCK 05000250 6
FP&L Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact me at (404) 331-5541.
Sincerely, (Original signed by T. A. Peebles)
Docket Nos.
50-250,251 License Nos.
DPR-31,41 Thomas A. Peebles, Chief Operator Licensing and Human Performance Branch Division of'eactor Safety cc:
H. N. Paduano, Manager Licensing and Special Programs Florida Power and Light Company PE 0. Box 14000 Juno Beach, FL 33408-0420 Plant General Manager Turkey Point Nuclear Plant P. 0.
Box 029100 Miami, FL 33102 R. J
~ Hovey Site Vice President Turkey Point Nuclear Plant PE 0.
Box 029100 Miami, FL 33102 G.
E. Hollinger Licensing Manager Turkey Point Nuclear Plant P. 0. Box 4332 Miami, FL 33032-4332 M. S.
Ross, Attorney Florida Power
& Light 11770 US Highway 1 North Palm Beach, FL 33408 John T. Butler, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, FL 33131-2398 Distribution:
(See page 3)
Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Armando Vidal County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Joe Myer s, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Mr. William Lindsey Training Manager Turkey Point Nuclear Plant P. 0.
Box 029100 Miami, FL 33102
FP&L Distribution:
R. Croteau, NRR K. Landis, RII B. R. Crowley, RII B. Hichael, RII PUBLIC Thomas P. Johnson Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 1448 Homestead, FL 33090 SIGNATURE DATE COPYT GNopper:sd 12 /I
/96 E
HO DLIM 12 / )i / 96 YES CJvlian 12 /
/ 96 12 /
/ 96 YES NO YES HO 12/
/96 YES NO 12 /
/ 96 YES NO