Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18011A620 + (11:26:59, 7 January 2025)
- ML18011A621 + (11:26:59, 7 January 2025)
- ML18011A619 + (11:27:00, 7 January 2025)
- HNP-94-073, Application for Amend to License NPF-63,relocating Selected TS Per NUREG-1431 + (11:27:01, 7 January 2025)
- ML18011A616 + (11:27:01, 7 January 2025)
- ML18011A613 + (11:27:04, 7 January 2025)
- ML18011A611 + (11:27:05, 7 January 2025)
- IR 05000400/1994014 + (11:27:08, 7 January 2025)
- ML18011A608 + (11:27:10, 7 January 2025)
- ML18011A607 + (11:27:10, 7 January 2025)
- HNP-94-080, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-17.Corrective Actions:Edg B Tested to Verify Operability Status & to Implement Increased Test Frequency of Once Per Seven Days on Staggered Test Basis for EDGs + (11:27:11, 7 January 2025)
- HNP-94-079, Monthly Operating Rept for Sept 1994 for Shearon Harris Nuclear Power Plant + (11:27:13, 7 January 2025)
- ML18011A603 + (11:27:17, 7 January 2025)
- ML18011A602 + (11:27:19, 7 January 2025)
- 05000400/LER-1994-005-02, :on 940901,TS Surveillance Violation Occurred. Caused by Personnel Error During Sample Analysis Process. Individuals Involved in Incident Counseled & Event Reviewed W/Applicable E&C Personnel + (11:27:20, 7 January 2025)
- HNP-94-076, Informs That Shnpp No Longer Has Need for SRO License,Docket 55-20750 & Requests That License Be Terminated.Individual Reassigned to Position Which Does Not Require Operator or Senior Operator License + (11:27:22, 7 January 2025)
- ML18011A600 + (11:27:22, 7 January 2025)
- ML18011A597 + (11:27:28, 7 January 2025)
- ML18011A596 + (11:27:29, 7 January 2025)
- ML18011A594 + (11:27:30, 7 January 2025)
- HNP-94-075, Monthly Operating Rept for Aug 1994 for Shearon Harris Nuclear Power Plant + (11:27:32, 7 January 2025)
- ML18011A593 + (11:27:32, 7 January 2025)
- ML18011A589 + (11:27:34, 7 January 2025)
- ML18011A586 + (11:27:35, 7 January 2025)
- ML18011A584 + (11:27:36, 7 January 2025)
- IR 05000400/1994013 + (11:27:37, 7 January 2025)
- ML18011A582 + (11:27:38, 7 January 2025)
- ML18011A580 + (11:27:39, 7 January 2025)
- TAC:M84127 + (11:27:39, 7 January 2025)
- IR 05000400/1994018 + (11:27:41, 7 January 2025)
- ML18011A576 + (11:27:43, 7 January 2025)
- 05000400/LER-1994-004-03, :on 940805,discovered That Failures of B EDG Occurred.Caused by Inadequate Procedures & Administrative Controls.Edg Tested & Implemented Increased Test Frequency of Once Per Seven Days on Staggered Test Basis + (11:27:44, 7 January 2025)
- ML18011A572 + (11:27:46, 7 January 2025)
- ML18011A574 + (11:27:46, 7 January 2025)
- HNP-94-067, Application for Amend to License NPF-63,revising TS Tables 2.2-1 & 3.3-4,reflecting Results of Revised SG Water Level Setpoint Accuracy Calculation + (11:27:47, 7 January 2025)
- IR 05000400/1994016 + (11:27:54, 7 January 2025)
- ML18011A566 + (11:27:55, 7 January 2025)
- HNP-94-070, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-13.Corrective Actions:Maint Surveillance Test Procedures & Process Instrumentation Calibr Procedures Will Be Revised.Violation a Denied + (11:27:56, 7 January 2025)
- ML18011A563 + (11:28:00, 7 January 2025)
- HNP-94-068, Forwards Seminannual Radioactive Effluent Release Rept for Jan-June 1994 & ODCM, Rev 4 + (11:28:01, 7 January 2025)
- IR 05000400/1994015 + (11:28:07, 7 January 2025)
- ML18011A557 + (11:28:10, 7 January 2025)
- ML18011A559 + (11:28:10, 7 January 2025)
- 05000400/LER-1994-003-03, :on 940718,single Failure Identified in One Train of Esws That Could Possibly Prevent High Head Charging/Si Pumps from Performing Design Function.Caused by Oversight During Esws Design + (11:28:12, 7 January 2025)
- ML18011A551 + (11:28:14, 7 January 2025)
- HNP-94-025, Application for Amend to License NPF-63,incorporating Programmatic Controls for Radioactive Effluents,Radiological Environ Monitoring & Solid Wastes in Administrative Controls Section of TS & Relocating RETS to ODCM or Pcp,Per GL 89-01 + (11:28:15, 7 January 2025)
- 05000400/LER-1994-002-03, :on 940717,TS Surveillance Violation Occurred Due to Failure to Perform Required RMS Compensatory Measures for TB Wrgm,Declared Inoperable on 940716.Daily SR Procedures Will Be Revised + (11:28:17, 7 January 2025)
- HNP-94-063, Monthly Operating Rept for Jul 1994 for Shnpp + (11:28:18, 7 January 2025)
- ML18011A546 + (11:28:20, 7 January 2025)
- ML18011A545 + (11:28:21, 7 January 2025)
- ML18011A543 + (11:28:22, 7 January 2025)