Forwards Insp Rept 50-400/94-21 on 940903-28.Two Apparent Violations Identified & Being Considered for Escalated Enforcement Action.Enforcement Conference to Discuss Apparent Violations Scheduled for 941021
ML18011A611
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/07/1994
From: Boger B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robinson W
CAROLINA POWER & LIGHT CO.
Shared Package
ML18011A612 List:
References
EA-94-204, NUDOCS 9411010153
Download: ML18011A611 (5)


See also: IR 05000400/1994021

Text

October 7,

1994

EA 94-204

Carolina

Power

and Light Company

ATTN: Mr.

W.

R. Robinson

Vice President

Shearon Harris Nuclear

Power Plant

P. 0.

Box 165

Mail Code:

Zone

1

New Hill, NC 27562-0165

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-400/94-21

Gentlemen:

This refers to the inspection

conducted

by J.

Tedrow of this office on

September

3-28,

1994.

The inspection

included

a review of activities

authorized for your Harris facility.

At the conclusion of the inspection,

the

findings were discussed

with those

members of your staff identified in the

enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

two apparent violations were

identified and are being considered for escalated

enforcement

action in

accordance

with the "General

Statement of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy),

10 CFR Part 2, Appendix C.

The

apparent violations involve

a longstanding

design deficiency involving the

emergency

service water system

and incomplete or inaccurate

information

provided to the

NRC in response

to a Generic Letter.

Accordingly, no Notice

of Violation is presently

being issued'for

these

inspection findings.

Please

be advised that the number

and characterization

of apparent violations

described

in the enclosed

inspection report

may change

as

a result of further

NRC review.

An enforcement

conference

to discuss

these

apparent violations has

been

scheduled for October 21,

1994.

The decision to hold an enforcement

conference

does not mean that the

NRC has determined that

a violation has

occurred or that enforcement

action will be taken.

The purposes

of this

conference

are to discuss

the apparent violations, their causes

and safety

significance; to provide you the opportunity to point out any errors in our

inspection report;

and to provide

an opportunity for you to present your

proposed corrective actions.

In addition, this is an opportunity for you to

provide

any information concerning your perspectives

on 1) the severity of the

violations;

2) the application of the factors that the

NRC considers

when it

determines

the

amount of a civil penalty that

may be assessed

in accordance

with Section VI.B.2 of the Enforcement Policy;

and 3) any other application of

the Enforcement Policy to this case,

including the exercise of discretion in

9411010153

941007

PDR

ADOCK 05000400

8

PDR

I

CPRL

2

accordance

with Section VII.

You will be advised

by separate

correspondence

of the results of our deliberations

on this matter.

No response

regarding the

apparent violation is required at this time.,

In accordance

with 10 CFR 2.790, of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

Bruce A.

Bog r, Acting Director

Docket No.:

50-400'icense

No.:

NPF-63

Division of

eactor Projects

Enclosure:

NRC Inspection

Report

cc w/encl:

H.

W. Habermeyer,

Qr.

Vice President

Nuclear Services

Department

Carolina

Power

h Light Company

P.,O.

Box 1551

- Mail OHS7

Raleigh,

NC

27602

J.

W. Donahue

Plant Manager

S. Harris Nuclear

Power Plant

Carolina

Power

5 Light Company

P. 0.

Box 165,

MC:

Zone

1

New Hill, ,NC

27562-0165

David McCarthy,

Manager

Regulatory Affairs

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

H.

Ray Starling

Vice President

- Legal Dept.

Carolina

Power and,Light Co.

P. 0.

Box 1551

Raleigh,

NC

27602

cc w/encl:

(cont'd - see

page

3)

CPKL

cc w/encl:

3

(cont'd)

Dayne

H. Brown, Director

Div. of Radiation Protection

N.

C. Dept. of Environmental

Commerce

& Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

Karen

E.

Long

Assistant Attorney General

State of North Carolina

P. 0.

Box 629

Raleigh,

NC

27602

Public Service

Commission

State of South Carolina

P. 0.

Box 11649

Columbia,

SC

29211

Admiral Kinnaird R.

HcKee

214 South Norris Street

Oxford,, HD

21654

Robert

D. Hartin

3382

Sean

Way

Lawrenceville,

GA

30244

The Honorable

Hugh Wells

Chairman of the North Carolina

Utilities Commission

P. 0.

Box 29510

Raleigh,

NC

27626-0510

Robert

P. Gruber

Executive Director

Public Staff NCUC

P. 0.

Box 29520

Raleigh,

NC

27626

Distribution:

(See

page 4)

CPLL

Distribution:

H. Christensen,

RII

N. Le,

NRR

G. A. Hallstrom, RII

PUBLIC

NRC Resident

Inspector

U. S. Nuclear Regulatory

Comm.

5421

Shearon

Harris

Road

New Hill, NC

27562-9998

SEND

TO

DR?

OFC

RII:DRP

NAHE

JSterefos:tj

10/

/94

DATE

Ho

COPY?

Yes

OFFICIAL RECORD

COPY

Ho

RI I:DRP

RI I:DRP

SElrod

10/

/94

NChristen en

10/

/94

Yes

Ho

Yes

DOCUHEHT NAHE:

P: iHA94-21.RPT

No

RII:EI

BU

10/

1/94

Yes

Ho

/

/94

Yes

No