gp,g RE0y 0

Cy 00 1Vl0 Y/

~O

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON' C

205554001 September 30, 1994 Hr.

W. R. Robinson, Vice President Shearon Harris Nuclear Power Plant Carolina Power

& Light Company Post Office Box 165 Hail Code:

Zone 1

New Hill, North Carolina 27562-0165

SUBJECT:

PILOT NRC SITE VISIT TO VERIFY THE MAINTENANCE RULE (10 CFR 50.65)

DRAFT MAINTENANCE INSPECTION PROCEDURE SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1

Dear Hr. Robinson:

An NRC public meeting was held on July 22, 1994, for the staff to discuss how the NRC would conduct a number of-site visits to verify and validate the staff's maintenance rule draft inspection procedure, and to confirm dates for the staff's scheduled pilot site visits.

At this meeting, representatives from the Carolina Power

& Light Company (Messrs.

Wayne Crawford, Lewis Rowell, and Robert Duncan) proposed a date for the staff to visit the Shearon Harris Nuclear Power Plant, Unit 1, site during the week of October 24-28, 1994.

This date was later confirmed by' subsequent telephone conversation with Hr. Lewis Rowell of your staff.

Accordingly, an NRC team consisting of the following individuals should be expected to arrive on site at approximately 1:OOPM on October 24, 1994.

NAMES ORG NIZAT ONS Richard Correia NRC/NRR/DRIL Thomas Foley NRC/NRR/DRIL Charles Petrone NRC/NRR/DRIL Wayne Shafer NRC/ Region III George Replogle-NRC/ Region III Paul Kellogg NRC/- Region II Jin Wook Chung NRC/NRR/SPSB Angel Coello CSN Spain

\\

After the team arrival on Monday and the entrance interview scheduled for 1:OOPH has been conducted, the team would like to meet with your plant management staff and the personnel responsible for the implementation of the maintenance rule to discuss the team's plans for the week and to make any logistical arrangements, such as access training (if needed) and badging.

For your planning purposes, the'team would like to start with review of your implementation of the maintenance rule immediately after the initial meeting with your staff.

We request that the plant.'s key maintenance personnel brief the team on the methods and procedures that are being used to implement the 040r)~

94100h0100 940930 PDR ADDCK 05000400 PDR pm'I,K SEER I:IIPY+,,

r(

L

W.

R. Robinson maintenance rule at your site.

For your staff's planning purposes, we expect this briefing to last no more than 2 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

Tuesday morning, the team will begin a independent review of documents and records pertaining to the maintenance rule, which will last until Thursday afternoon.

Your key maintenance staff need not be present during these independent

reviews, but should be available by telephone for questions that may arise during the process.

We request that you assign at least one member of your staff to act as a full time liaison to assist the NRC team in obtaining plant documents and records.

The team plans to have an exit meeting on Friday morning at approximately 9:30 am to discuss their observations and conclusions.

We thank you for volunteering for this important staff activity.

We believe that both the NRC and industry will benefit from the feedback on the result of this staff review of the maintenance rule implementation efforts:

If you have any questions related to the planned site visits please contact Rich Correia at (301) 504-1009.

Sincerely, Docket No. 50-400 cc:

See next page Ngoc B. Le, Project Manager Project Directorate II-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

t

Mr.

W. R. Robinson Carolina Power

& Light Company Shearon Harris Nuclear Power Plant Unit 1

CC:

Mr. H. Ray Starling Manager Legal Department Carolina Power

& Light Company.

Post Office Box 1551

Raleigh, North Carolina 27602.

Resident Inspector/Harris NPS c/o U.S. Nuclear Regul.atory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Karen E.

Long Assistant Attorney General State of North. Carolina Post Office Box 629

Raleigh, North Carolina-27602.

Public Service Commission State of South Carolina Post Office Drawer 11649

Columbia, South Carolina 29211 Regional Administrator, Region II

,U.S. Nuclear Regulatory Commission 101 Marietta St.,

N.W. Suite 2900 Atlanta, Georgia 30323 27626 Mr. Dayne H. Brown, Director Division of Radiation Protection N.C. Department of Environmental Commerce

& Natural Resources Post Office Box 27687

Raleigh, North Carolina 27611-7687 Mr. H.

W. Habermeyer, Jr.

Vice President Nuclear Services Department Carolina Power

& Light Company Post Office Box 1551

Raleigh, North Carolina 27602 1

Admiral Kinnaird R.. McKee 214 South Morris Street Oxford, Maryland 21654-Mr. Robert D. Martin 3382 Sean Way Lawrenceville, Georgia.

'30244-Mr. J.

W. Donahue Plant Manager Harris Plant'arolina Power- & Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, MC: Zone 1

New Hill, Nor th Carolina. 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC Post Office Box 29520

Raleigh, North Carolina 27626

~

~

I rP r

September 30, 1994 W.

R. Robinson maintenance rule at your site.

For your staff's planning purposes, we expect this briefing to last no more than 2 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

s Tuesday morning, the team will begin a independent review of documents and records pertaining to the maintenance rule, which will last until Thursday afternoon.

Your key maintenance staff need not be present during these independent

reviews, but should be'vailable by telephone for questions that may arise during the process.

We request that you assign at least one member of your staff to act as a full time liaison to assist the NRC team in obtaining plant documents and records.

The team plans to have an exit meeting on Friday morning at approximately 9:30 am to discuss their observations and conclusions.

We thank you for volunteering for this important staff activity.

We believe that both the NRC and industry will benefit from the feedback on the result of this staff review of the, maintenance rule implementation efforts.

If you have any questions related to the planned site visits please contact Rich Correia at (301) 504-1009.

Sincerely, Docket No. 50-400 cc:

See next page Original Signed by:

Ngoc B. Le, Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation DISTRIBUTION:

Docket File, PUBLIC PDII-1 Reading S.

Varga G. Lainas W.

Bateman P. Anderson N.

Le OGC ACRS (10)

B. Boger, RII R. Correia T. Foley C. Petrone A. Gibson, RII P. Kellogg W. Shafer, RIII G. Replogle J.

Chung DOCUMENT NAME:

G: IIHARRISiSITEVIST. LTR To racehre a copy of this document, IndIcate In the boxu C

a Copy without attachment/enclosure E" e Copy wIth attachment/enclosure "N" ~ No copy OFFICE IIAHE DALE I.AIPD21IDRP PDAnderson 09/

94 E

PH t PD I I -1 NLe:Jrm 09

/94 DtPDI I-1 MBateman 09

/94 OFF CIAL RECORD COPY 09/

/94 09/

/94