Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HNP-96-023, Clarifies Commitments Re Macroscopic Biological Fouling + (11:15:45, 7 January 2025)
- 05000400/LER-1996-005-01, :on 960312,failure to Properly Test Containment Bldg Outer Personnel Air Lock Door Occurred.Caused by Personnel Error.Individual Involved Counseled.W/Undated Ltr + (11:15:47, 7 January 2025)
- HNP-96-059, Monthly Operating Rept for Mar 1996 for Harris Nuclear Plant + (11:15:49, 7 January 2025)
- HNP-96-063, Forwards Rept Per 10CFR50.59(b)(c) of Changes,Tests & Experiments for Plant for 940712-951212 + (11:15:51, 7 January 2025)
- HNP-96-048, Forwards Rev 26 to PLP-201, Shearon Harris Nuclear Power Plant Emergency Plan, Including Changes to Eals,Staffing, Facility/Equipment Improvements,Emergency Response & Clerical & Grammatical Error + (11:15:53, 7 January 2025)
- HNP-96-055, Forwards 30-day Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (11:15:54, 7 January 2025)
- HNP-96-058, Responds to NRC Re Violation Noted in Insp Rept 50-400/96-01.C/A:training Performed to re-emphasize Requirements for Reactor Auxiliary Bldg Emergency Exhaust Sys Boundary Doors & Radiation Work Permits Revised + (11:15:56, 7 January 2025)
- HNP-96-047, Requests Prior Approval for Rev to HNP Emergency Plan,Table 2.2-1 + (11:15:58, 7 January 2025)
- ML18012A195 + (11:16:01, 7 January 2025)
- 05000400/LER-1996-004, :on 960205,RWST Level Transmitters Failed & Violation of TS Action Statement Occurred.Caused by Freezing of Level Transmitter Sensing Lines.Frozen Lines Thawed & Missing Insulation Replaced + (11:16:05, 7 January 2025)
- HNP-96-054, NPDES Noncompliance Notification:On 960326 Internal Audit Identified Concern W/Sampling Frequency for Fecal Coliform at Heec Outfall.Investigation in Progress & Upon Completion Results Will Be Communicated + (11:16:06, 7 January 2025)
- IR 05000400/1996001 + (11:16:46, 7 January 2025)
- NUREG/CR-7240, Impact of Operating Parameters on Extended BWR Burnup Credit + (11:16:48, 7 January 2025)
- ML18012A190 + (11:16:52, 7 January 2025)
- ML18012A188 + (11:16:53, 7 January 2025)
- PNO-II-96-021, on 960324,notified of Unit Shutdown in Excess of 72-h to Repair FW Isolation Valve.Licensee Plans Call for Valve Repairs to Be Completed & Plant start-up to Commence on or After 960327 + (11:16:55, 7 January 2025)
- ML18012A185 + (11:16:57, 7 January 2025)
- ML18012A183 + (11:16:58, 7 January 2025)
- ML18012A181 + (11:16:59, 7 January 2025)
- HNP-96-031, Application for Amend to License NPF-63,relocating TS 3.3.3.2, Movable Incore Detectors & Associated Bases, Consistent w/NUREG-1431 & GL 95-10 + (11:17:00, 7 January 2025)
- ML18012A179 + (11:17:02, 7 January 2025)
- ML18012A178 + (11:17:02, 7 January 2025)
- HNP-96-040, Requests Approval to Use Alternate to ASME Boiler & Pressure Vessel Code Requirements for Sys Hydrostatic Testing of Class 1,2 & 3 Sys + (11:17:03, 7 January 2025)
- Press Release-18-002, Registration Opens for NRCs 2018 Regulatory Information Conference + (11:17:05, 7 January 2025)
- 05000400/LER-1995-011, :on 951105,reactor Trip/Safety Injection Occurred During Solid State Protection Sys Testing Due to Failure of Relay Contact & Unplanned ESF Actuation Occurred During Troubleshooting + (11:17:08, 7 January 2025)
- HNP-96-039, Monthly Operating Rept for Feb 1996 for Harris Nuclear Plant + (11:17:09, 7 January 2025)
- ML18012A170 + (11:17:11, 7 January 2025)
- ML18012A169 + (11:17:12, 7 January 2025)
- ML18012A166 + (11:17:13, 7 January 2025)
- ML18012A156 + (11:17:14, 7 January 2025)
- ML18012A155 + (11:17:15, 7 January 2025)
- HNP-96-024, Responds to Administrative Ltr 96-01 Re Operator Licensing National Examination Schedule + (11:17:16, 7 January 2025)
- ML18012A148 + (11:17:18, 7 January 2025)
- HNP-96-020, Number of Personnel & Man-Rem by Work & Job Function,1995 + (11:17:19, 7 January 2025)
- 05000400/LER-1996-003, :on 960122,failed to Perform Core Flux Mapping Following Short Power Excursions Over 100% Power.Caused by Amend 50 Being Incorporated W/O Properly Implementing TS Action Statement.Revised Associated TS Bases + (11:17:21, 7 January 2025)
- ML18012A144 + (11:17:22, 7 January 2025)
- HNP-96-025, Application for Amend to License NPF-63,revising TS 4.3.2 Re ESFAS Instrumentation + (11:17:23, 7 January 2025)
- 05000400/LER-1996-002-01, :on 960117,failure to Perform Required Surveillance Testing During Planned Maint Outage in Oct 1994 Identified.Caused by Personnel Error.Personnel Involved Counseled + (11:17:25, 7 January 2025)
- ML18012A139 + (11:17:27, 7 January 2025)
- ML18012A138 + (11:17:28, 7 January 2025)
- ML18012A137 + (11:17:28, 7 January 2025)
- HNP-96-019, Forwards 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Valves + (11:17:29, 7 January 2025)
- ML18012A133 + (11:17:31, 7 January 2025)
- HNP-95-115, Forwards TS Pages for Proposed Gas Storage Tank Program That Will Be Added to TS Section 6.8.4,procedures & Programs to Support 941024 Request for License Amend,Per NRC Request + (11:17:32, 7 January 2025)
- HNP-96-014, Proposed Tech Specs Incorporating Inspection Guidance from NRC Inspection Procedure 61706, Core Thermal Power Evaluation + (11:17:34, 7 January 2025)
- ML18012A128 + (11:17:35, 7 January 2025)
- HNP-96-018, Monthly Operating Rept for Jan 1996 for Shearon Harris Nuclear Power Plant + (11:17:36, 7 January 2025)
- IR 05000400/1995018 + (11:17:40, 7 January 2025)
- IR 05000400/1995019 + (11:17:46, 7 January 2025)
- ML18012A117 + (11:17:47, 7 January 2025)
- ML18012A116 + (11:17:48, 7 January 2025)