CATEGORY 1 REGULATt%Z ZNFORMATZON ZIZSTRZBUTZON%ZSTEM (RZDS)
ACCESS~ON'9R:9604160004 DOC.DATE: &+~~
NOTARIZED: NO FACIL:,5(t-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,S.
Carolina Power a Light Co.
DONAHUE,J.W.
Carolina Power &'ight Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000400
SUBJECT:
Monthly o crating rept for Mar 1996 for Harris-Nuclear Plant.W/
60410 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
05000400
~
RECIPIENT'D CODE/NAME PD2-1 PD INTERNAL:
FILE CENTRE EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 10 10 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LE,N AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 0
D 0
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D-5 (EXT. 415" 2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL VUMBER OF COPIES REQUIRED:
LTTR 19 ENCL 19
Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 APR 1 0
>gag SERIAL: HNP-96-059 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT Gentlemen:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power Er. Light Company herewith submits the report of operating statistics and shutdown experience for the month of March 1996.
Sincerely, J. W. Donahue General Manager Harris Nuclear Plant SGR Enclosure c:
Mr. J. B. Brady Mr. S. D. Ebneter Mr. N. B. Le 9604'L60004 96033k Vow ADClCK 0S000n00 R,
PDR State Road 1134 New Hill NC
~
~
Enclosure to Serial HNP-96-059 Sheet I of 3 CP8L Co.
RUN DATE 04/02/96 '
RUN TIME 10:57:26 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT
'1 PAGE 1
RPD36-000 OPERATING STATUS
- 1. UHIT NAME:
HARRIS UNIT 1
2.
REPORTIHG PERIOD:
MARCH 96 I
3.
LICENSED THERMAL POWER (MWT):
2775 4
HAMEPLATE RATING (GROSS MWE)'50 9 I
5.
DESIGN ELECTRICAL RATING (NET MWE):
900.0 6.
MAX DEPENDABLE CAPACITY (GROSS MWE>: 920.0 I
7.
MAX DEPENDABLE CAPACITY (NET MWE):
860.0-DOCKET NO. 050.400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 NOTES 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORTS GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10.
REASONS FOR RESTRICTION IF ANY:
11.
HOURS IN REPORTING PERIOD 12.
NUMBER OF HOURS REACTOR CRITICAL 13.
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR ON LINE 15.
UHIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEN.
(MWH) 17.
GROSS ELEC.
ENERGY GEN (MWH) 18.
NET ELEC.
ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE THIS MONTH 744 F 00 574.07
.00 559.05
.00 1517434.38 506772.00 469316.00 75.14 75.14 73.35 70.09 24.86 YR TO DATE 2184 ~ 00 2014.07
.00 1987.72
.00 5449032.18 1826519.00 1708942.00 91.01 91.01 90.99 86.94 8.51 CUMUL ATIVE 78169.00 64901.33 F 00 64241.88
.00 171695712.42 57154843.00 53265940.00
- 82. 18 82.18 79.23 75.71 3.33 24 'HUTDOWNS SCHED.
OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25.
IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATIOH 1.16 - 9
Enclosure to Serial HNP-96-059 Sheet 2 of 3 CPRL CO.
PLANT PERFORMANCE DATA SYSTEM RUN DATE 04/02/96 APPENDIX 8 - AVERAGE DAILY POWER LEVEL RUN TIME 10:57:29 HARP,IS UNIT 1
PAGE RPD39-000 MARCH 1996 DAY AVG. DAILY POWER LEVEL (MWE-HET) 880 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHOHE (919)362-2573 DAY AVG~ DAILY POWER LEVEL (MWE-NET) 17 18 878 19 20 870 10 12 13 14 15 16 859 881 881 881 867 859 867 22 23 24 25 26 27 28 29 30 31 716
-4'I
-39
-37
-36
-40
-44
-43 40
UNITSHUTDOWNS ANDPOWER REDUCTION REPORT MONTH UNITNAME:
Harris DATE:
04/03/96 COMPLETED BY: S. G. Rogers TELEPHONE:
(919) 362-2573 NUMBFR 96401 DATF.
960322 TYPF.
I DURATION HOURS 184.95 REASON 2
METHODOF SHUITINGDOWN REACTOR 3
LICENSEE EVENT RF PORT ¹96-002 SYSTEM CODF. 4 COMPONENT CODE 5 INSTRU CAUSE AND CORRECTIVE ACTIONTO PREVENTRECURRENCE Unit entered Tech Spec 3.0.3.
and was manually shutdown due to incomplete safety scqucncer testing.
Required testing was satisfactorily completed.
While the plant was shutdown, a condenser tube leak and main feedwater isolation valve (IFW-277) were rcpairaL The unit was returned on line 03/30/96 14:36.
I F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction operator Training gt License Examination F-Adnunistrativc G-Operational Error (Exp!ain)
H-Other (Explain) 3 Method:
I-Manual 2-hlanual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 643th cr 4
Exhibit G-Instructions for Preparation ofData Entry Sheets for Licenscc Event Report (LER) File (NUREG4161) 5 Exhibit I - Same Source M M rs2. o
~ >8 O
Ch CO
'0 A
4
~/
4
- 4. u
~
~
"P
~ ~
+%~M>
ky<<~ ~ca:~
e., +-~~
~
I