Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18012A562 + (11:09:36, 7 January 2025)
- HNP-97-064, Provides Addl Info to Support Evaluation of Potential Cask Drop Scenario While Reactor at Power,In Response to NRC Bulletin 96-002 + (11:09:37, 7 January 2025)
- HNP-97-032, Provides 180-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs + (11:09:39, 7 January 2025)
- HNP-97-060, Confirms 970214 Telcon Re Potential Inability to Completely Satisfy Requirements of Augmented Reactor Pressure Vessel Shell Weld Exams Scheduled for Upcoming Apr 1997 Refueling Outage at HNP + (11:09:41, 7 January 2025)
- HNP-97-057, Responds to RAI Re Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over SR Equipment + (11:09:43, 7 January 2025)
- TAC:M96760 + (11:09:44, 7 January 2025)
- ML18012A554 + (11:09:45, 7 January 2025)
- ML18012A551 + (11:09:47, 7 January 2025)
- ML18012A548 + (11:09:48, 7 January 2025)
- TAC:M96533 + (11:09:49, 7 January 2025)
- ML18012A547 + (11:09:49, 7 January 2025)
- ML18012A545 + (11:09:50, 7 January 2025)
- 05000400/LER-1997-001-01, :on 970131,automatic Reactor Tripped Resulting from SG low-low Level.Caused by Inadvertent Closure of Mfiv (1FW-159) & Faulty Hydraulic Relays.Shuttle Valves Replaced, SG Level Discrepancy Investigated + (11:09:52, 7 January 2025)
- HNP-97-054, Provides Addl Info Re 970110 License Amend Request to Clarify Pressure Testing Requirements for Isolable & non- Isolable Diesel Fuel Oil Piping + (11:09:56, 7 January 2025)
- HNP-97-039, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/96-11.Corrective Actions:Sg a Feed Flow Red Pen Was Reprimed to Allow Trace to Be Read + (11:09:58, 7 January 2025)
- HNP-97-051, Numbers of Personnel & Man-Rem by Work & Job Function,1996 Harris Plant + (11:10:00, 7 January 2025)
- HNP-97-047, Submits Supplemental Response to Insp Rept 50-400/96-09 Re Corrective Action to Violation of Failure to Scope Required Systems & Components within Maint Rule + (11:10:02, 7 January 2025)
- ML18012A536 + (11:10:04, 7 January 2025)
- ML18012A535 + (11:10:05, 7 January 2025)
- HNP-97-034, Requests Revision to TS for HNP Which Revises 3.3.2 in Action 16 of Table 3.3-3 to Add Specific Time Interval of Six H to Place an Inoperable Channel in Bypassed Condition, IAW 10CFR50.90 + (11:10:06, 7 January 2025)
- ML18012A531 + (11:10:08, 7 January 2025)
- HNP-97-015, Application for Amend to License NPF-63,revising Tech Specs 3/4.7.1, Turbine Cycle Safety Valves + (11:10:09, 7 January 2025)
- ML18012A528 + (11:10:10, 7 January 2025)
- HNP-97-042, Submits Revised Info for Equipment Returned to Svc in Order to Demonstrate Operability,Per Telcon W/Nrc on 970219 & in Support of 970206 Application for Amend to License NPF-63 + (11:10:11, 7 January 2025)
- HNP-97-045, Requests That Attached Drawing,Incorporating Three Designated Fuel Oil Piping Lines,Be Ref in Pressure Testing Requirements + (11:10:13, 7 January 2025)
- HNP-97-037, Submits Extension Request for Response to Addl Info Request Re Bulletin 96-002 + (11:10:15, 7 January 2025)
- ML18012A523 + (11:10:16, 7 January 2025)
- HNP-97-040, Forwards Harris Unit 1 Cycle 7 Colr,Rev 4. Revision Incorporates Changes Necessary to Support Temporary Relaxation of Min Required Number of Detector Thimbles in Movable Incore Detection Sys for Remainder of Cycle 7 + (11:10:17, 7 January 2025)
- ML18012A519 + (11:10:19, 7 January 2025)
- ML18012A517 + (11:10:21, 7 January 2025)
- IR 05000400/1996010 + (11:10:22, 7 January 2025)
- HNP-97-029, Monthly Operating Rept for Jan 1997 for Shearon Harris Nuclear Power Plant + (11:10:23, 7 January 2025)
- HNP-97-022, Forwards Emergency Planning Info in Response to NRC Administrative Ltr 94-07, Distribution of Site-Specific & State Emergency Planning Info. W/O Encl + (11:10:25, 7 January 2025)
- ML18012A513 + (11:10:25, 7 January 2025)
- ML18012A511 + (11:10:27, 7 January 2025)
- HNP-97-025, Forwards Bases Section for TS 3.2.3 Re Rated Thermal Power. Attached Retyped Bases Page B 3/4 2-5 + (11:10:28, 7 January 2025)
- ML18012A510 + (11:10:28, 7 January 2025)
- TAC:M97826 + (11:10:30, 7 January 2025)
- ML18012A507 + (11:10:31, 7 January 2025)
- ML18012A506 + (11:10:36, 7 January 2025)
- ML18012A503 + (11:10:36, 7 January 2025)
- ML18012A502 + (11:10:37, 7 January 2025)
- HNP-97-026, Application for Amend to License NPF-63,adding New Entry 3.0.5 to 3/4.0 Applicability.New 3.0.5 Provides Specific Guidance for Returning Equipment to Svc for Sole Purpose of Performing Testing to Demonstrate Operability + (11:10:38, 7 January 2025)
- ML18012A501 + (11:10:38, 7 January 2025)
- ML18012A497 + (11:10:41, 7 January 2025)
- HNP-97-009, Application for Amend to License NPF-63,requesting to Add New Entry 3.0.5 to 3/4.0 to Provide Specific Guidance for Returning Equipment to Service in Order to Demonstrate Operability + (11:10:42, 7 January 2025)
- ML18012A496 + (11:10:42, 7 January 2025)
- ML18012A492 + (11:10:45, 7 January 2025)
- ML18012A491 + (11:10:46, 7 January 2025)
- ML18012A489 + (11:10:47, 7 January 2025)
- IR 05000454/2018410 + (11:10:48, 7 January 2025)