Forwards Insp Rept 50-400/96-11 on 961124-970104 & Nov.Three Violations Identified During Insp
ML18012A489
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/31/1997
From: Shymlock M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robinson W
CAROLINA POWER & LIGHT CO.
Shared Package
ML18012A490 List:
References
NUDOCS 9702070445
Download: ML18012A489 (7)


See also: IR 05000400/1996011

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9702070445

DOC.DATE: 97/01/31

NOTARIZED: NO

FACIL:50-400 Shearon Harris Nuclear

Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

SHYMLOCK,M.B.

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

ROBINSON,W.R.

Carolina

Power

6 Light Co.

SUBJECT:

Forwards

insp rept 50-400/96-11

on 970104

& NOV.Three

violations identified during insp.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

(

ENCL

(

SIZE:

5

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

DOCKET

05000400

0

A

05000400

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

FILE CENTER

HHFB

NRR/DRPM/PERB

OE DIR

RGN2

FILE

01

XTERNAL: LITCO BRYCEIJ

H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

LE,N

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

'

1

1

1

1

1

1

0

D

E

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

January

31,

1997

Hr. William R. Robinson

Vice President

- Harris Plant

Carolina

Power

& Light Company

P. 0.

Box 165, Hail Code:

Zone

1

New Hill, NC 27562-0165

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-400/96-11

NOTICE OF VIOLATION.

Dear

Hr . Robinson:

On January 4,

1997, the

NRC completed

an inspection at your Harris reactor

facility.

The enclosed report presents

the results of that inspection.

During the six weeks covered

by this inspection period, our inspectors

found

thai your staff generally took

a safety conscious

approach to the activities

conducted at the Harris Plant.

We believe that your decision to remove the

unit from service to repair

an unisolable

steam leak on

a small gland seal

line reflected the appropriate safety attitude.

Three violations were

identified during the period.

The first, which involved two examples of

failure to follow procedures

related to control

room chart recorders

and

temperature

monitoring for the boric acid heat trace system, is of concern

because

your operations staff is currently attempting to correct

a negative

performance trend.

The second,

which involved a missed surveillance

on

auxiliary control panel

equipment

due to a procedure

inadequacy,

is of concern

because

the procedure

development

and review process

should not allow errors

to be inadvertently introduced.

Our concern

on the third violation, which

involved corrective action problems related to the emergency service water

structure air handlers,

is that it represented

an insensitivity to the use of

appropriate

approved

problem resolution methods.

These violations are cited in the enclosed

Notice of Violation, and the

circumstances

surrounding the violations are described in detail in the

enclosed

report.

Please

note that you are required to respond to this letter

and should follow the instructions specified in the enclosed

Notice when

preparing your response.

The

NRC will use your

response,

in part, to

determine

whether

further enforcement action is necessary

to ensure

compliance

with regulatory requirements.

q7020704g5

970

PDR

ADQCK 0

C

CP8L

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room

(PDR).

Sincerely,

Originalsignea ~~i% B. 8byml~

Docket No.:

50-400

License No.:

NPF-63

Milton B. Shymlock, Chief

Reactor Projects

Branch 4

Division of Reactor

Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encls:

J.

Cowan,

Manager

Operations

8 Environmental

Support

MS OHS7

Carolina

Power

8 Light Company

P.

O. Box 1551

Raleigh,

NC

27602

J.

W. Donahue

Director of Site Operations

Carolina

Power

8 Light Company

Shearon Harris Nuclear

Power Plant

P. 0. Box 165,

MC:

Zone

1

New Hill, NC

27562-0165

Bo Clark

Plant General

Manager

- Harris Plant

Carolina Power

8 Light Company

Shearon Harris Nuclear

Power

Plant

P. 0. Box 165

New Hill, NC

27562-0165

T. D. Walt, Manager

Regulatory Affairs

Carolina Power

8 Light Company

Shearon Harris Nuclear

Power Plant

P. 0.

Box 165, Mail Zone

1

New Hill, NC

27562-0165

(cc w/encls cont'd

- See

page 3)

CP&L

(cc w/encls cont'd)

W. D. Johnson,

Vice President

and Senior

Counsel

Carolina

Power

& Light Company

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environmental

Health

& Natural

Resources

PE 0.

Box 27687

Ral ei gh,

NC

27611-7687

Karen E.

Long

Assistant Attorney General

State of North Carolina

P. 0. Box 629

Raleigh,

NC

27602

Public Service Commission

State of South Carolina

P. 0.

Box 11649

Columbia,

SC

29211

Chairman of the North Carolina

Utilities Commission

P. 0. Box 29510

Raleigh,

NC

27626-0510

Robert

P. Gruber

Executive Director

Public Staff

NCUC

P. 0.

Box 29520

Raleigh,

NC

27626

Nargaret Bryant Pollard,

Chairman

Board of County Commissioners

of Chatham County

P. 0. Box 87

Pittsboro,

NC

27312

Distribution w/encls

-

(See

page 4)

CP&L

Distribution w/encls:

H. Shymlock, RII

M. N. Hiller, RII

R. Aiello, RII

N. Le,

NRR

PUBLIC

NRC Resident

Inspector

U. S. Nuclear

Regulatory Commission

5421 Shearon Harris Road

New Hill, NC

27562-9998

  • (See previous concurrence)

5IGNATIIE

J8rady

DRoberts

RAiel

HHIIIer

GH

nald

DATE

COPY2

01 /

/ 97

01 /

/ 97

YES

HO

YES

HO

01 / i- '

97

YES

NO

01 /

/ 97

YE

NO

01 /

/ 97

ES

HO

01 /

/ 97

YE'S

HO

.

%U, .JAN-38-97

9:lI5AN

VS NRC

919 362 IIQS

2

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice."

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room

(PDR).

Sincerely,

Docket No.:

License No.:

Enclosures;

50-400

NPF-63

Hilton B, Shymlock, Chief

Reactor

Projects

Branch 4

D>vision of Reactor

Projects

Notice of Yiolation

Inspection Report 50-400/96-11

cc ihencls:

S)GHATNE

HAHE

r ad7

PYl

R0btt)$

HA)el)o

Kl)l)Qc

GH)COn0) 0

01 I

I 97

VES

H0

01 I 0 I97

0) I

I97

VES

H0

01 I

I 97

0) I

I 97

O'. I

I 97

)ES

HO

VES

)0

VES

TOTAL P. gI