Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9702070445
DOC.DATE: 97/01/31
NOTARIZED: NO
FACIL:50-400 Shearon Harris Nuclear
Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATION
SHYMLOCK,M.B.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
ROBINSON,W.R.
Carolina
Power
6 Light Co.
SUBJECT:
Forwards
insp rept 50-400/96-11
on 970104
& NOV.Three
violations identified during insp.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR
(
ENCL
(
SIZE:
5
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
DOCKET
05000400
0
A
05000400
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
FILE CENTER
HHFB
NRR/DRPM/PERB
OE DIR
RGN2
FILE
01
XTERNAL: LITCO BRYCEIJ
H
NRC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
LE,N
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
'
1
1
1
1
1
1
0
D
E
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
January
31,
1997
Hr. William R. Robinson
Vice President
- Harris Plant
Carolina
Power
& Light Company
P. 0.
Box 165, Hail Code:
Zone
1
New Hill, NC 27562-0165
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-400/96-11
Dear
Hr . Robinson:
On January 4,
1997, the
NRC completed
an inspection at your Harris reactor
facility.
The enclosed report presents
the results of that inspection.
During the six weeks covered
by this inspection period, our inspectors
found
thai your staff generally took
a safety conscious
approach to the activities
conducted at the Harris Plant.
We believe that your decision to remove the
unit from service to repair
an unisolable
steam leak on
a small gland seal
line reflected the appropriate safety attitude.
Three violations were
identified during the period.
The first, which involved two examples of
failure to follow procedures
related to control
room chart recorders
and
temperature
monitoring for the boric acid heat trace system, is of concern
because
your operations staff is currently attempting to correct
a negative
performance trend.
The second,
which involved a missed surveillance
on
auxiliary control panel
equipment
due to a procedure
inadequacy,
is of concern
because
the procedure
development
and review process
should not allow errors
to be inadvertently introduced.
Our concern
on the third violation, which
involved corrective action problems related to the emergency service water
structure air handlers,
is that it represented
an insensitivity to the use of
appropriate
approved
problem resolution methods.
These violations are cited in the enclosed
Notice of Violation, and the
circumstances
surrounding the violations are described in detail in the
enclosed
report.
Please
note that you are required to respond to this letter
and should follow the instructions specified in the enclosed
Notice when
preparing your response.
The
NRC will use your
response,
in part, to
determine
whether
further enforcement action is necessary
to ensure
compliance
with regulatory requirements.
q7020704g5
970
ADQCK 0
C
CP8L
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room
(PDR).
Sincerely,
Originalsignea ~~i% B. 8byml~
Docket No.:
50-400
License No.:
Milton B. Shymlock, Chief
Reactor Projects
Branch 4
Division of Reactor
Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
J.
Cowan,
Manager
Operations
8 Environmental
Support
MS OHS7
Carolina
Power
8 Light Company
P.
O. Box 1551
Raleigh,
NC
27602
J.
W. Donahue
Director of Site Operations
Carolina
Power
8 Light Company
Shearon Harris Nuclear
Power Plant
P. 0. Box 165,
MC:
Zone
1
New Hill, NC
27562-0165
Bo Clark
Plant General
Manager
- Harris Plant
Carolina Power
8 Light Company
Shearon Harris Nuclear
Power
Plant
P. 0. Box 165
New Hill, NC
27562-0165
T. D. Walt, Manager
Regulatory Affairs
Carolina Power
8 Light Company
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165, Mail Zone
1
New Hill, NC
27562-0165
(cc w/encls cont'd
- See
page 3)
(cc w/encls cont'd)
W. D. Johnson,
Vice President
and Senior
Counsel
Carolina
Power
& Light Company
P. 0.
Box 1551
Raleigh,
NC
27602
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environmental
Health
& Natural
Resources
PE 0.
Box 27687
Ral ei gh,
NC
27611-7687
Karen E.
Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh,
NC
27602
Public Service Commission
State of South Carolina
P. 0.
Box 11649
Columbia,
SC
29211
Chairman of the North Carolina
Utilities Commission
P. 0. Box 29510
Raleigh,
NC
27626-0510
Robert
P. Gruber
Executive Director
Public Staff
NCUC
P. 0.
Box 29520
Raleigh,
NC
27626
Nargaret Bryant Pollard,
Chairman
Board of County Commissioners
of Chatham County
P. 0. Box 87
Pittsboro,
NC
27312
Distribution w/encls
-
(See
page 4)
Distribution w/encls:
H. Shymlock, RII
M. N. Hiller, RII
R. Aiello, RII
N. Le,
PUBLIC
NRC Resident
Inspector
U. S. Nuclear
Regulatory Commission
5421 Shearon Harris Road
New Hill, NC
27562-9998
- (See previous concurrence)
5IGNATIIE
J8rady
DRoberts
RAiel
HHIIIer
GH
nald
DATE
COPY2
01 /
/ 97
01 /
/ 97
YES
HO
YES
HO
01 / i- '
97
YES
NO
01 /
/ 97
YE
NO
01 /
/ 97
HO
01 /
/ 97
YE'S
HO
.
%U, .JAN-38-97
9:lI5AN
VS NRC
919 362 IIQS
2
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice."
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room
(PDR).
Sincerely,
Docket No.:
License No.:
Enclosures;
50-400
Hilton B, Shymlock, Chief
Reactor
Projects
Branch 4
D>vision of Reactor
Projects
Notice of Yiolation
Inspection Report 50-400/96-11
cc ihencls:
S)GHATNE
HAHE
r ad7
PYl
R0btt)$
HA)el)o
Kl)l)Qc
GH)COn0) 0
01 I
I 97
VES
H0
01 I 0 I97
0) I
I97
VES
H0
01 I
I 97
0) I
I 97
O'. I
I 97
)ES
HO
VES
)0
VES
TOTAL P. gI