Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18012A863 + (11:05:36, 7 January 2025)
- ML18012A862 + (11:05:37, 7 January 2025)
- ML18012A860 + (11:05:38, 7 January 2025)
- HNP-97-161, Monthly Operating Rept for July 1997 for Shnpp + (11:05:39, 7 January 2025)
- 05000400/LER-1996-018, :on 960903,manual Reactor Trip Occurred Due to Loss of Normal Sw.Caused by Mechanical Failure of B Water Pump & a Normal SW to Remain Running Once Manually Started.Restored a Normal SW Pump to Svc + (11:05:42, 7 January 2025)
- 05000400/LER-1996-018-01, Forwards LER 96-018-01 Per 10CFR50.73.Rev Provides Addl Info Related to Cause of a Normal Svc Water Pump Trip That Occurred on 960903,following Loss of Running Normal Svc Water Pump + (11:05:44, 7 January 2025)
- 05000400/LER-1996-013, :on 961028,condition Outside of Design Basis Where RWST Had Been Aligned w/non-seismically Qualified Sys Was Identified.Caused by Failure to Reconcile Operating Procedure Lineups.Established Administrative Controls + (11:05:46, 7 January 2025)
- 05000400/LER-1996-013-02, Forwards LER 96-013-02 Per 10CFR50.73.Rev Reports Results of Addl Analysis That Was Performed to Determine Safety Consequences Associated W/Potential Loss of Ccws + (11:05:49, 7 January 2025)
- HNP-97-146, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/97-06.Corrective Actions:Compliance Was Achieved on 970608 W/Issuance of Operations Night Order + (11:05:50, 7 January 2025)
- HNP-97-155, Forwards Proprietary Info Re Notification of Change in Reactor Operator Status.Encl Withheld Per 10CFR2.790(a)(6) + (11:05:54, 7 January 2025)
- 05000400/LER-1997-018, :on 970701,determined That Plant Procedures Had Not Received Proper Reviews & Approvals.Caused by Failure to Comply W/Plant Administrative Procedure AP-006.Counseled Involved Individuals + (11:05:56, 7 January 2025)
- HNP-97-148, Submits Change in Schedule for Completion of Corrective Actions Made in Response to Violation Noted in Insp Rept 50-400/96-06 + (11:05:57, 7 January 2025)
- HNP-97-152, Forwards 120-day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations + (11:05:59, 7 January 2025)
- ML18012A844 + (11:06:01, 7 January 2025)
- HNP-97-147, Responds to NRC Re Violations Noted in Insp Rept 50-400/96-01.Corrective Actions:Seven Doors Were Alarmed & Ten Doors Were Locked Requiring Operations Approval of Breach Request Prior to Blocking Open + (11:06:02, 7 January 2025)
- ML18012A842 + (11:06:05, 7 January 2025)
- ML18012A841 + (11:06:09, 7 January 2025)
- ML18012A839 + (11:06:10, 7 January 2025)
- ML18012A838 + (11:06:11, 7 January 2025)
- HNP-97-149, Forwards LER 97-S01-00,describing Instances Involving Contract Outage Workers Being Inappropriately Granted Access at Plant During Refueling Outage 7 + (11:06:12, 7 January 2025)
- ML18012A837 + (11:06:12, 7 January 2025)
- HNP-97-136, Notifies NRC of Schedule Change for Util Conversion to Improved Std TS for Hnp.Nrc License Amend Issuance Will Be Requested by July 2000 + (11:06:14, 7 January 2025)
- PNO-II-97-040, on 970720,automatic Reactor Trip Occurred Due to Main Generator Lockout.Main Generator Lockout Caused by Loss of Generator Excitation Caused by Electrical Fault in Exciter.Afws Automatically Started as Expected + (11:06:18, 7 January 2025)
- HNP-97-142, Monthly Operating Rept for June 1997 for Shearon Harris Nuclear Power Plant + (11:06:19, 7 January 2025)
- HNP-97-132, Forwards Response to Violations Noted in Insp Rept 50-400/97-04.Corrective Actions:New Operations Mgt Team Has Been Put in Place & re-evaluation Was Also Conducted for Current Supervisory Assignments + (11:06:21, 7 January 2025)
- 05000400/LER-1997-017, :on 970612,failed to Recognize Inoperable Reactor Afd Monitor.Caused by Personnel Error.Operators Involved in Event Will Be Counseled Prior to Assuming Shift Duties + (11:06:24, 7 January 2025)
- HNP-97-130, Forwards Proprietary List of SROs That Have Been Reassigned within Util from Position Which Util Previously Certified Need for SRO License.Termination of Licenses,Requested. Encl Withheld,Per 10CFR2.790(a)(6) + (11:06:25, 7 January 2025)
- HNP-97-133, Submits Emergency Preparedness Exercise Scope & Objectives 75 Day Submittal for Exercise Scheduled for 971007 + (11:06:27, 7 January 2025)
- 05000400/LER-1997-015, :on 970602,inadequate Auxiliary Feedwater Sys Flow Control Valve Surveillance Testing Deficiency Was Identified.Caused by Failure to Recognize Impact on TS 4.7.1.2.1.Readjusted AFW FCV Actuator Spring + (11:06:29, 7 January 2025)
- ML18012A823 + (11:06:31, 7 January 2025)
- IR 05000400/1997001 + (11:06:32, 7 January 2025)
- IR 05000400/1997005 + (11:06:34, 7 January 2025)
- ML18012A819 + (11:06:36, 7 January 2025)
- IR 05000400/1997003 + (11:06:37, 7 January 2025)
- ML18012A817 + (11:06:38, 7 January 2025)
- ML18012A813 + (11:06:39, 7 January 2025)
- ML18012A812 + (11:06:40, 7 January 2025)
- HNP-97-100, Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f + (11:06:46, 7 January 2025)
- 05000400/LER-1997-013, :on 970508,entry Into Mode-6 Without Operable Components,Resulting in TS 3.0.4 Violation Occurred.Caused by Personnel Error.Personnel Involved Counseled + (11:06:50, 7 January 2025)
- ML18012A806 + (11:06:56, 7 January 2025)
- ML18012A805 + (11:06:57, 7 January 2025)
- ML18012A803 + (11:06:58, 7 January 2025)
- 05000400/LER-1997-012, :on 970505,determined That Previous Auxiliary Control Panel Had Not Verified Operability of Interposing Relays.Caused by Misinterpretation of Tss.Reviewed Other Remote Shutdown Panel Transfer Circuitry + (11:07:01, 7 January 2025)
- ML18012A799 + (11:07:02, 7 January 2025)
- HNP-97-114, Forwards Revised TS Pp B3/4 5-1,B 3/4 5-1a & B 3/4 5-2 Bases,Which Incorporates Changes from Amend 71,as Well as 970310 Proposed Changes + (11:07:03, 7 January 2025)
- ML18012A796 + (11:07:05, 7 January 2025)
- 05000400/LER-1996-023, :on 961114,design Deficiency in EDG Protection Circuitry Was Identified.Caused by Inadequate Original Plant Design.Surveillance Test Procedures OST-1013 & OST-1073 Revised + (11:07:07, 7 January 2025)
- ML18012A794 + (11:07:08, 7 January 2025)
- 05000400/LER-1997-005, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-03.Corrective Actions:Submitted LER 97-005-00 on 970317 & Reviewed Violation W/Individuals Involved to Ensure Understanding Re Identification of Reportable Conditions + (11:07:10, 7 January 2025)
- HNP-97-049, Informs That,Based on Test Results,Cp&L Will Not Modify Eight Gate Valves as Stated in Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (11:07:11, 7 January 2025)
- ML18012A791 + (11:07:13, 7 January 2025)