Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HNP-99-053, Submits Response to RAI Re Spent Fuel Pool Water Level & Revised Fuel Handling Accident Analyses,Per 990317 Telcon with NRC + (10:54:32, 7 January 2025)
- HNP-99-034, Forwards Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept, IAW 10CFR55.45(b)(5)(ii). NRC Form 474 & Required Info Re Simulator Performance Test Results & Schedules Also Encl + (10:54:35, 7 January 2025)
- ML18016A866 + (10:54:35, 7 January 2025)
- HNP-99-017, Informs NRC of Mod to Commitment for Hnp,Re Comprehensive Review of Implementation of TS Sr.Upon Completion of Listed Reviews,Surveillance Procedure Review Project Will Be Considered Complete + (10:54:38, 7 January 2025)
- ML18016A862 + (10:54:38, 7 January 2025)
- ML18016A859 + (10:54:41, 7 January 2025)
- ML18016A857 + (10:54:42, 7 January 2025)
- HNP-99-047, Monthly Operating Rept for Feb 1999 for Shearon Harris Npp. with + (10:54:43, 7 January 2025)
- ML18016A853 + (10:54:45, 7 January 2025)
- HNP-99-032, Forwards Proprietary & non-proprietary Version of Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFPs C & D. Repts Are Reissued to Reflect Reduction in Proprietary Info.Proprietary Info Withheld + (10:54:46, 7 January 2025)
- ML18016A845 + (10:54:49, 7 January 2025)
- IR 05000400/1998011 + (10:54:53, 7 January 2025)
- ML18016A843 + (10:54:54, 7 January 2025)
- ML18016A841 + (10:54:55, 7 January 2025)
- ML18016A840 + (10:54:56, 7 January 2025)
- HNP-99-018, Application for Amend to License NPF-63,revising TS Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints. Description of Changes & Environmental Evaluation,Encl + (10:54:57, 7 January 2025)
- HNP-99-027, Submits ISI Summary Rept for CP&L Hnp.Rept Covers Insps Performed at HNP During Cycle 8 Operations,Including Refueling Outage 8 in Second 10-yr ISI Interval + (10:54:58, 7 January 2025)
- ML18016A835 + (10:55:00, 7 January 2025)
- ML18016A834 + (10:55:01, 7 January 2025)
- ML18016A832 + (10:55:02, 7 January 2025)
- ML18016A831 + (10:55:06, 7 January 2025)
- ML18016A830 + (10:55:06, 7 January 2025)
- ML18016A829 + (10:55:07, 7 January 2025)
- ML18016A827 + (10:55:08, 7 January 2025)
- ML18016A828 + (10:55:08, 7 January 2025)
- 05000400/LER-1999-003, :on 990123,noted That Plant Was Outside Design Basis Due to Isolation of Fire Protection Containment Sprinkler Sys.Caused by Human Error.Restored Containment Sprinkler Sys to Operable Status.With + (10:55:10, 7 January 2025)
- HNP-99-021, Forwards Proprietary Notification That RO Licensed on Shnpp Terminated Employment,Per 10CFR50.74(b).Name,docket Number & License Number for Subject Ro,Encl.Proprietary Info Withheld Under Provisions of 10CFR2.790(a)(6) + (10:55:11, 7 January 2025)
- HNP-99-010, Number of Personnel & Man-Rem by Work & Job Functions, 1998,Harris Plant. with + (10:55:13, 7 January 2025)
- ML18016A822 + (10:55:13, 7 January 2025)
- ML18016A820 + (10:55:15, 7 January 2025)
- ML18016A819 + (10:55:16, 7 January 2025)
- ML18016A817 + (10:55:17, 7 January 2025)
- ML18016A816 + (10:55:17, 7 January 2025)
- ML18016A814 + (10:55:18, 7 January 2025)
- ML18016A815 + (10:55:18, 7 January 2025)
- ML18016A813 + (10:55:19, 7 January 2025)
- ML18016A812 + (10:55:20, 7 January 2025)
- 05000400/LER-1999-002, :on 990114,RT Due to Not Removing Temporary Device from Relay Following Calibration Was Noted.Caused by Human Error.Counseled Personnel Involved in Event.With + (10:55:21, 7 January 2025)
- ML18016A810 + (10:55:22, 7 January 2025)
- ML18016A808 + (10:55:23, 7 January 2025)
- ML18016A807 + (10:55:24, 7 January 2025)
- ML18016A806 + (10:55:25, 7 January 2025)
- HNP-99-013, Notifies NRC of Schedule Change for CP&L Conversion to Improved Standard Tech Specs for Plant.Util Expect to Request NRC License Amend Issuance by End of 2003 + (10:55:26, 7 January 2025)
- HNP-99-020, Monthly Operating Rept for Jan 1999 for Shearon Harris Nuclear Power Plant.With + (10:55:28, 7 January 2025)
- ML18016A803 + (10:55:29, 7 January 2025)
- IR 05000400/1998301 + (10:55:31, 7 January 2025)
- ML18016A800 + (10:55:32, 7 January 2025)
- ML18016A798 + (10:55:33, 7 January 2025)
- 05000400/LER-1999-001, :on 990106,SF Pool Water Level Was Not Maintained Greater than 23 Feet Above Stored BWR Fuel Assemblies.Caused by Fasteners Bending Under Specific Circumstances.Increased Water Level.With + (10:55:34, 7 January 2025)
- ML18016A795 + (10:55:36, 7 January 2025)
- 05000400/LER-1998-004, :on 980313,identified Design Deficiency Re Potential Runout of Tdafwp.Caused by Inadequate Original AFW Sys Design.Operability Evaluation Was Completed on 980313 & Addl Engineering Analysis Was Performed by Vendor + (10:55:37, 7 January 2025)