Forwards Insp Rept 50-400/98-11 on 981220-990130 & Notice of Violation.One Violation Identified in Rept Repetitive as Described in Section E8.1
ML18016A841
Person / Time
Site: Harris 
Issue date: 03/01/1999
From: Plisco L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Scarola J
CAROLINA POWER & LIGHT CO.
Shared Package
ML18016A842 List:
References
50-400-98-11, NUDOCS 9903100161
Download: ML18016A841 (8)


See also: IR 05000400/1998011

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

.

~

'

SSXON NBR:9903100161

DOC.DATE: 99/03/01

NOTARIZED: NO

DOCKET

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

05000400

AUTH.NAME

AUTHOR AFFILIATION

PLISCO,L.R.

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

SCAROLA,J.

Carolina Power

&, Light Co.

SUBJECT: Forwards insp rept 50-400/98-11

on 981220-990130

&, notice of

violation. One violation identified in rept repetitive as

described in Section E8.1.

DISTRIBDTION CODE: IEOIP

COPIES

RECEIVED:LTR l

ENCL

I

SIZE:

TITLE: General

(50 Dkt)-Xnsp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

05000400E

RECXPXENT

XD CODE/NAME

PD2-1

PD

INTERNAL: ACRS

AEODJ~C

IL~~~

R/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

EXTERNAL: LMITCO MARSHALL,

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1-

1

1

1

1

1

1

1

1

1

1

1

RECXPIENT

XD CODE/NAME

FLANDERS, S

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN2

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

N

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION.REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THF NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED: LTTR

19

ENCL

19

'March 1, 1999

f

Carolina Power &Ught Company

ATTN: Mr. James Scarola

Vice President - Harris Plant

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Code: 2one

1

New Hill, NC 27562-0165

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 5(4400/98-11

AND NOTICE OF VIOLATION

Dear Mr. Scarola:

On January 30, 1999, the NRC completed an inspection at your Shearon Harris facility. The

enclosed report presents the results of that inspection.,

During the six-weeks covered by this inspection period, our inspectors found that your staff

generally took a safety-conscious approach to the operation of the facility.

Based on the results of this inspection, the NRC has determined that violations of NRC

requirements occurred. These violations are cited in the enclosed Notice of Violation (Notice),

and the circumstances surrounding the violations are described in detail in the enclosed report.

One'of the violations identified in this report is repetitive; as described in Section E8.1.

Repetitive violations are addressed

in the NRC's "Statement of Policy and Procedure for NRC

Enforcement Actions," (Enforcement Policy), NUREG 1600,Section IV.B.,The Enforcement

Policy allows the severity level of a violation to be increased ifthe violation can be considered

repetitive. For example, a Severity Level IVviolation could be increased to Severity Level III

with the attending escalated enforcement action. However, in this case, we have decided not to

increase the severity level of this violation based on the changes which you recently

implemented In your Corrective Action Program, and your subsequent satisfactory performance

in this area..

You are required to respond to this letter and should followthe instructions specified in the

enclosed Notice when preparing'your response.

The NRC willuse your response,

in part, to

determine whether furtlierenforcement action is necessary to ensure compliance with

regulatory requirements.

99'03i00ihi

8

PDR

ADQCK 99'030i.

K

OSOOOeOO;.

P

PDR

r

CP8L

2

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room (PDR).,

Sincerely,

(Original signed

by L. R. Plisco)

Loren R. Plisco, Director

Division of Reactor Projects

Docket No.:

50-400

License No.:

NPF-63

Enclosures:

1. Notice of Violation

2. Inspection Report

cc w/encls: (See page 3)

CP&L

cc vhencls:

~

~

D. B. Alexander, Manager

Performance Evaluation and

Regulatory Affairs

CPB 9

Carolina Power & Light Company

P. O. Box 1551

Raleigh, NC 27602-1551

J. W. Donahue

Director of Site Operations

MC: Zone1

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

P. O. Box 165

New Hill, NC 27562-0165

Chris A. VanDenburgh, Manager

Regulatory Affairs

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Zone

1

New Hill, NC 27562-0165

Johnny H. Eads, Supervisor

Licensing/Regulatory Programs

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Zone 1

New Hill, NC 27562-0165

William D. Johnson

Vice President & Senior Counsel

Carolina Power & Light Company

P. O. Box 1551

Raleigh, NC 27602

Bo Clark

Plant General Manager-Harris Plant

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

P. O. Box 165

~

New Hill, NC 27562-0165

Mel Fry, Director

Division of Radiation Protection

N. C. Department of Environmental

Commerce & Natural Resources

3825 Barrett Drive

Raleigh, NC 27609-7721

Karen E. Long

Assistant Attorney General

State of North Carolina

P. O. Box 629

Raleigh, NC 27602

Public Service Commission

State of South Carolina

P. O. Box 11649

Columbia, SC 29211

Chairman of the North Carolina

Utilities Commission

P. O. Box 29510

Raleigh, NC 27626-0510

Robert P. Gruber

Executive Director

Public Staff NCUC

P. O. Box 29520

Raleigh, NC 27626

Stewart Adcock, Chairman

Board of County Commissioners

of Wake County,

P. O. Box 550

Raleigh, NC 27602

Margaret Bryant Pollard, Chairman

Board of County Commissioners

of Chatham County

P. O. Box 87

Pittsboro, NC 27312

Distribution w/encls: (See page 4)

FRI,

FEB-26-99

12:25PM

US

NRC

919 362 8648

P. 81

L. Plisco, Rll

B. Bonser, Rll

J. Coley, Rll

S. Flanders, NRR

R. Baldwin, Rll

J. Lenahan, Rll

D. Jones, Rll

D. Thompson, Rll

PUBLIC

,

PPZE7NAl. FONf 00 (7~

FAX TRANSMITTAL

f ~lNs

17fPIJASfoC7

Fsxf'&X

f

101

GENERAL SERVCES AOMWISTRA1E7N

NSN 7010 01 017-7000...

5000-

NRC Resident Inspector

V. S. Nuclear Regulatory Commission

542$ Shearon Harris Road

New.Hill, NC 27562-9998

6'A/zg/g ~g

pj? yp

Sl

NATURE

NAME

DA

co

?

DRP7R

GMsc

110ldnlg

FSCly

Egb

ES

NO

AB

End

a

No

Y

N

YES

NO

as

No

RECORD COPY

DOCUMENTNAME: C:

ILE

R981168-'l1

2.WPd

TOTAL P. 81

CP&L

Distribution wiencis:

L. Plisco, Rll

B. Bonser, Rll

J. Coley, Rll

S. Flanders, NRR

R. Baldwin, Rll

J. Lenahan, Rll

D. Jones, Rll

D. Thompson, Rll

PUBLIC

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

5421 Shearon Harris Road

New Hill, NC 27562-9998

OFFICE

DRP/RII

DRP/RII

DRP/Rll

DRP/Rll

EICS/Rll

SIGNATURE

NAME

DATE

GMacDonaldn/g

BBonser

2/

/99

r(

JBrady gi

C'/

/99

BHagar

2/

/99

ABoland

2/

/99

2/

/99

2/

/99

COPY?

YES

No

ESP

NO

YES > No

YES

NO

YES

NO

OFFICIALRECORD COPY

DOCUMENTNAME: G:WARRISLREPOR'n98-11.WPD

YES

NO

YES

NO