Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18025B363 + (09:02:21, 7 January 2025)
- ML18025B361 + (09:02:22, 7 January 2025)
- ML18025B358 + (09:02:23, 7 January 2025)
- ML18025B360 + (09:02:23, 7 January 2025)
- PMNS20180091, Fire Probabilistic Risk Assessment (PRA) Meeting + (09:02:24, 7 January 2025)
- ML18025B354 + (09:02:25, 7 January 2025)
- ML18025B351 + (09:02:26, 7 January 2025)
- 05000391/LER-1917-005, Regarding Unplanned Emergency Core Cooling System Injection Into the Reactor Coolant System Due to Personnel Error + (09:02:29, 7 January 2025)
- U-604400, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (Cover Letter Only) + (09:02:30, 7 January 2025)
- ML18025B342 + (09:02:31, 7 January 2025)
- IR 05000259/1980041 + (09:02:33, 7 January 2025)
- ML18025B335 + (09:02:35, 7 January 2025)
- ML18025B333 + (09:02:36, 7 January 2025)
- ML18025B329 + (09:02:40, 7 January 2025)
- ML18025B326 + (09:02:41, 7 January 2025)
- ML18025B324 + (09:02:43, 7 January 2025)
- ML18025B323 + (09:02:43, 7 January 2025)
- ML18025B322 + (09:02:45, 7 January 2025)
- ML18025B320 + (09:02:46, 7 January 2025)
- ML18025B318 + (09:02:47, 7 January 2025)
- ML18025B315 + (09:02:48, 7 January 2025)
- ML18025B313 + (09:02:49, 7 January 2025)
- ML18025B310 + (09:03:13, 7 January 2025)
- ML18025B309 + (09:03:14, 7 January 2025)
- ML18025B308 + (09:03:17, 7 January 2025)
- NLS2018003, Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2017 + (09:03:18, 7 January 2025)
- BSEP 18-0009, 2017 Sea Turtle Annual Report + (09:03:20, 7 January 2025)
- ML18025B306 + (09:03:20, 7 January 2025)
- ML18025B298 + (09:03:21, 7 January 2025)
- ML18025B294 + (09:03:22, 7 January 2025)
- ML18025B293 + (09:03:22, 7 January 2025)
- ML18025B292 + (09:03:23, 7 January 2025)
- ML18025B290 + (09:03:24, 7 January 2025)
- ML18025B289 + (09:03:25, 7 January 2025)
- ML18025B287 + (09:03:26, 7 January 2025)
- ML18025B278 + (09:03:27, 7 January 2025)
- ML18025B272 + (09:03:28, 7 January 2025)
- ML18025B270 + (09:03:29, 7 January 2025)
- ML18025B271 + (09:03:29, 7 January 2025)
- ML18025B269 + (09:03:30, 7 January 2025)
- ML18025B267 + (09:03:31, 7 January 2025)
- ML18025B268 + (09:03:31, 7 January 2025)
- 05000260/LER-1980-054-03, /03L-0:on 801004,refuel Interlocks Switch 2 Jammed in Overtravel Position,Rendering Switch Inoperable & Allowing Movement Toward Core in Startup Mode.Caused by Switch Operating Arm Rotating 180 Degrees + (09:03:33, 7 January 2025)
- 05000260/LER-1980-054, Forwards LER 80-054/03L-0 + (09:03:35, 7 January 2025)
- ML18025B263 + (09:03:37, 7 January 2025)
- 05000260/LER-1980-051-03, /03L-0:on 801121,reactor Water Level Switch 2-LIS-3-58C Switch 4 Found Inoperable at Proper Setpoint. Caused by Dirty Switch Contacts.Contacts Cleaned & Checked at Proper Setpoint + (09:03:38, 7 January 2025)
- 05000260/LER-1980-051, Forwards LER 80-051/03L-0 + (09:03:41, 7 January 2025)
- 05000260/LER-1980-050-03, /03L-0:on 801119,intermediate Range Monitors B,D & H Did Not Respond During Initial Startup,Creating Less than Allowable Number of Operable Instrument Channels in Trip Sys B.Caused by Open Time Wire RG 114 A/U Cables.Cables + (09:03:44, 7 January 2025)
- 05000260/LER-1980-050, Forwards LER 80-050/03L-0 + (09:03:46, 7 January 2025)
- 05000260/LER-1980-052-03, /03L-0:on 801115,scram Discharge Vol Tank 3-gallon Level Alarm Switch 2-LS-85-45F Found Stuck & Inoperable. Caused by Stuck Robert Shaw Model SL-305-EI-X Switch Float. Switch Backflushed + (09:03:51, 7 January 2025)
- ML18025B254 + (09:03:53, 7 January 2025)