Forwards IE Insp Repts 50-259/80-41,50-260/80-38 & 50-296/80-36 on 801117-21.No Noncompliance Noted
ML18025B335
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/30/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18025B338 List:
References
NUDOCS 8102060758
Download: ML18025B335 (4)


See also: IR 05000259/1980041

Text

,~ R~o,

~C+

Wp

0O

qP

+w*w+

Tennessee

Valley Authority

ATTN:

H.

G. Parris

Manager of Power

500A Chestnut Street

Tower II

Chattanooga,

TN

37401

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

DEC So ~980

. II<g/P~

op)

V838 P+

8]~

P

'ASIS +OI/IrOg~

.coI~ ~e

Gentlemen:

Subject:

Report

No .WdL259/80-

0-260/80-3

aad ~6/80-36

This refers to the special inspection conducted by T. D. Gibbons of this office on

Novemb'er 17-21,

1980,

of activities authorized

by

NRC Operating

License

Nos.

DPR-33, DPR-52 and DPR-68 for the Browns Ferry facility.

Our preliminary findings

were discussed with H. A. Abercrombie at the conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations or deviations were disclosed.

In accordance

with Section 2.790 of the

NRC's

"Rules

of Practice",

Part 2,

Title 10,

Code of Federal

Regulations,

a

copy of this letter and the enclosed

inspection

report will be placed in the

NRC's Public Document

Room. If this

report

contains

any information that you (or your contractor)

believe

to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application

must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and

should

be prepared

so

that proprietary information identified in the application is contained in

a

separate

part of the document.

If we do not hear

from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Charles

E. Murphy, Chief

Reactor Construction

and Engineering

Support Branch

Enclosure:

(See

Page

2)

s1osoooV>IIr

I

P

4

g 1

~ 'k

y I

h

E.

a<~"

Cl

0

,Tennessee

Valley Authority

OEC SO tsso

Enclosure:

Inspection Report Nos.

50-259/80-41,

50-260/80-38

and

50-296/80-36

cc w/encl:

H. L. Abercrombie, Plant Superintendent

R. E. Rogers,

Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

0