ML18025B335
| ML18025B335 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 12/30/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18025B338 | List: |
| References | |
| NUDOCS 8102060758 | |
| Download: ML18025B335 (4) | |
See also: IR 05000259/1980041
Text
,~ R~o,
~C+
Wp
0O
qP
+w*w+
Valley Authority
ATTN:
H.
G. Parris
Manager of Power
500A Chestnut Street
Tower II
Chattanooga,
TN
37401
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
DEC So ~980
. II<g/P~
op)
V838 P+
8]~
P
'ASIS +OI/IrOg~
.coI~ ~e
Gentlemen:
Subject:
Report
No .WdL259/80-
0-260/80-3
aad ~6/80-36
This refers to the special inspection conducted by T. D. Gibbons of this office on
Novemb'er 17-21,
1980,
of activities authorized
by
NRC Operating
License
Nos.
DPR-33, DPR-52 and DPR-68 for the Browns Ferry facility.
Our preliminary findings
were discussed with H. A. Abercrombie at the conclusion of the inspection.
Areas
examined
during
the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no violations or deviations were disclosed.
In accordance
with Section 2.790 of the
NRC's
"Rules
of Practice",
Part 2,
Title 10,
Code of Federal
Regulations,
a
copy of this letter and the enclosed
inspection
report will be placed in the
NRC's Public Document
Room. If this
report
contains
any information that you (or your contractor)
believe
to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application
must include
a full statement of the reasons
on the basis of which
it is claimed that the information is proprietary,
and
should
be prepared
so
that proprietary information identified in the application is contained in
a
separate
part of the document.
If we do not hear
from you in this regard within
the specified period, the report willbe placed in the Public Document Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Charles
E. Murphy, Chief
Reactor Construction
and Engineering
Support Branch
Enclosure:
(See
Page
2)
s1osoooV>IIr
I
P
4
g 1
~ 'k
y I
h
E.
a<~"
Cl
0
Valley Authority
OEC SO tsso
Enclosure:
Inspection Report Nos.
50-259/80-41,
50-260/80-38
and
50-296/80-36
cc w/encl:
H. L. Abercrombie, Plant Superintendent
R. E. Rogers,
Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
0
0