Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205E320 + (23:50:37, 7 December 2024)
- ML20205E319 + (23:50:37, 7 December 2024)
- ML20205E318 + (23:50:38, 7 December 2024)
- ML20205E312 + (23:50:38, 7 December 2024)
- ML20205E311 + (23:50:39, 7 December 2024)
- ML20205E308 + (23:50:40, 7 December 2024)
- ML20205E310 + (23:50:40, 7 December 2024)
- 05000369/LER-1985-027-01, :on 850911,pressurizer Heater Group 1B Inoperable While Diesel Generator 1A Inoperable.Caused by Personnel Error.Generator Returned to Operable.Rept Will Be Reviewed W/Personnel + (23:50:43, 7 December 2024)
- ML20205E302 + (23:50:44, 7 December 2024)
- ML20205E304 + (23:50:44, 7 December 2024)
- ML20205E299 + (23:50:45, 7 December 2024)
- IR 05000322/1985035 + (23:50:46, 7 December 2024)
- ML20205E294 + (23:50:48, 7 December 2024)
- ML20205E293 + (23:50:49, 7 December 2024)
- ML20205E291 + (23:50:50, 7 December 2024)
- ML20205E290 + (23:50:50, 7 December 2024)
- ML20205E286 + (23:50:52, 7 December 2024)
- ML20205E288 + (23:50:52, 7 December 2024)
- ML20205E284 + (23:50:53, 7 December 2024)
- ML20205E280 + (23:50:54, 7 December 2024)
- ML20205E279 + (23:50:54, 7 December 2024)
- ML20205E275 + (23:50:55, 7 December 2024)
- ML20205E273 + (23:50:56, 7 December 2024)
- ML20205E272 + (23:50:58, 7 December 2024)
- ML20205E271 + (23:50:58, 7 December 2024)
- ML20205E270 + (23:50:59, 7 December 2024)
- ML20205E268 + (23:51:00, 7 December 2024)
- ML20205E269 + (23:51:00, 7 December 2024)
- TXX-4899, Responds to NRC 860618 Request for Addl Info Re Violations Noted in Insp Rept 50-445/86-02.Addl Info Withheld (Ref 10CFR73.21) + (23:51:01, 7 December 2024)
- ML20205E265 + (23:51:01, 7 December 2024)
- RC-99-0063, Special Rept:On 990302 & 16,meteorological Site Number One 10 Meter Temp Element Was Declared Inoperable.Caused by Erratic Operation.Cabling & 10 Meter Electrical Connectors Were Replaced + (23:51:02, 7 December 2024)
- ML20205E257 + (23:51:03, 7 December 2024)
- ML20205E256 + (23:51:04, 7 December 2024)
- ML20205E252 + (23:51:07, 7 December 2024)
- ML20205E248 + (23:51:08, 7 December 2024)
- ML20205E249 + (23:51:08, 7 December 2024)
- ML20205E247 + (23:51:09, 7 December 2024)
- ML20205E245 + (23:51:10, 7 December 2024)
- ML20205E246 + (23:51:10, 7 December 2024)
- ML20205E242 + (23:51:11, 7 December 2024)
- ML20205E236 + (23:51:13, 7 December 2024)
- ML20205E231 + (23:51:14, 7 December 2024)
- ML20205E235 + (23:51:14, 7 December 2024)
- B17720, Forwards Mnps,Units 1,2 & 3 Decommissioning Funding Status Rept, Per 10CFR50.75(f)(1).Util Is Submitting Rept on Behalf of co-owners of Three Millstone Units Which Vary Depending on Specific Unit in Question + (23:51:15, 7 December 2024)
- ML20205E225 + (23:51:16, 7 December 2024)
- W3P85-3209, Forwards Changes to Chapter 14 to Fsar,Deleting Control Sys steady-state Operation at 100% Power Level & Deleting Movable in-core Detector Responsiveness Testing from Power Ascension Test Program + (23:51:16, 7 December 2024)
- PNO-III-86-081, on 860810,approx 6.1 Ci Kr-85 Gas Released. Caused by Short Circuit in Electrical Sys Controlling Gas Release Valve in Testing Equipment.Release Did Not Exceed 10CFR20 Limits.Mfg Will Evaluate Incident on 860814 + (23:51:17, 7 December 2024)
- ML20205E220 + (23:51:18, 7 December 2024)
- ML20205E218 + (23:51:19, 7 December 2024)
- ML20205E209 + (23:51:21, 7 December 2024)
- ML20205E208 + (23:51:22, 7 December 2024)
- ML20205E207 + (23:51:26, 7 December 2024)