ML20205E308

From kanterella
Jump to navigation Jump to search
Forwards Second Draft Tech Specs for review.Marked-up Version Requested within 3 Wks of Ltr Date.W/O Encl
ML20205E308
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/05/1986
From: Mark Miller
Office of Nuclear Reactor Regulation
To: Conway R
GEORGIA POWER CO.
References
NUDOCS 8608180306
Download: ML20205E308 (2)


Text

.

Docket Nos.: 50-424 and 50-425 05 AUG 1986 Mr. Richard Conway, Vice President and Project General Manager Georgia Power Company Route 2, Box 299A Waynesboro, Georgia 30830

Dear Mr. Conway:

Subject:

Transmittal of Second Draft of Vogtle Unit 1 Technical Specifications Enclosed is the second draft of the Vogtle Unit 1 Technical Specifications.

This second draft is based on various telephone conferences, May 27-30 and ~

June 5-6, 1986 meetings, and several Georgia Power Company submittals.

We request that your staff review this draft carefully and provide a' marked up version of this document to us with necessary justifications within three weeks of the date of this letter.

If there are any questions, contact me at (301) 492-7357.

Sincerely,

\\6\\

Melanie A. Miller, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page f)isToIRirTON:

w/o enclosure kcket F e)

NRC Pun Local PDR PRC System NSIC PWR#4 Rdg MDuncan MMiller BJYoungblood 8608180306 860805 OGC PDR ADOCK 05000424, ACRS (10)

A PDR JPartlow EJordan BGrimes NThompson M(# h-A PWRf4/JtPWR-A PWRf4/DPWR-A MMR' mhc MDdifFari BJYoungblood 06/

/86 08/[,,/86 08/(/86

Mr. R. E. Conway 9

Georgia Power Company Vogtle Electric Generating Plant e

cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Coninission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /

Suite 225 Southern Company Services, Inc.

32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Donald O. Foster Troutman, Sanders, Lockerman, Vice President & Project General Manager

& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesboro, Georgia 30830 At' ata, Georgia 30303 Douglas C. Teper Mr. J. A. Bailey Georgians Against Nuclear Energy Project Licensing Manager 1253 Lenox Circle Southern Company Services, Inc.

Atlanta, Georgia 30306 P.O. Box 2625 Birmingham, Alabama 35202 Ernest L. Blake, Jr.

Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge Tim Johnson 1800 M Street, N.W.

Executive Director Washington, D. C.

20036 Educational Campaign for l

a Prosperous Georgia i

Mr. G. Bockhold, Jr.

1083 Austin Avenue, N.E.

Vogtle Plant Manager Atlanta, Georgia 30307 Georgia Power Company Route 2, Box 299-A Billie Pirner Garde Waynesboro, Georgia 30830 Citizens Clinic Director Government Accountability Project Regional Administrator, Region II 303 10th Street U.S. Nuclear Regulatory Commission Augusta, Georgia 30901 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 l

_ _ _