Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206F855 + (06:25:54, 7 December 2024)
- ML20206F854 + (06:25:55, 7 December 2024)
- ML20206F848 + (06:25:56, 7 December 2024)
- ML20206F852 + (06:25:56, 7 December 2024)
- ML20206F847 + (06:25:57, 7 December 2024)
- ML20206F844 + (06:25:58, 7 December 2024)
- ML20206F845 + (06:25:58, 7 December 2024)
- ML20206F843 + (06:25:59, 7 December 2024)
- ML20206F841 + (06:26:00, 7 December 2024)
- ML20206F840 + (06:26:01, 7 December 2024)
- ML20206F839 + (06:26:01, 7 December 2024)
- ML20206F838 + (06:26:02, 7 December 2024)
- ML20206F837 + (06:26:03, 7 December 2024)
- 05000374/LER-1986-010-06, :on 860525,surveillance of Rod Worth Minimizer & Rod Sequence Control Sys Not Performed Prior to Reducing Reactor Power to Less than 20%.Cause by Lack of Specific Procedure to Reduce Power + (06:26:04, 7 December 2024)
- ML20206F831 + (06:26:06, 7 December 2024)
- ML20206F832 + (06:26:06, 7 December 2024)
- ML20206F830 + (06:26:07, 7 December 2024)
- SNRC-1323, Documents Proposed Changes to Plant Tech Specs Derived from BWR Owners Group ATWS NEDE-31096-P & Ack NRC 861021 Ser,Per NRC 870309 Request.Portions of QA Program Re Min Enrichment of Sodium Pentaborate Described in USAR Section 17.2 + (06:26:08, 7 December 2024)
- ML20206F826 + (06:26:09, 7 December 2024)
- IR 05000225/1988004 + (06:26:10, 7 December 2024)
- ML20206F825 + (06:26:10, 7 December 2024)
- ML20206F822 + (06:26:11, 7 December 2024)
- ML20206F819 + (06:26:12, 7 December 2024)
- ML20206F821 + (06:26:12, 7 December 2024)
- 1CAN118806, Monthly Operating Rept for Oct 1988 for Arkansas Nuclear One Unit 1 + (06:26:13, 7 December 2024)
- ML20206F817 + (06:26:14, 7 December 2024)
- ML20206F816 + (06:26:15, 7 December 2024)
- ML20206F813 + (06:26:15, 7 December 2024)
- ML20206F812 + (06:26:16, 7 December 2024)
- L-99-067, Forwards Rev 11 to UFSAR for Bvps,Unit 2, Replacement Pages.Submittal Reflects Changes to Facility & Procedures as Described in Ufsar,Completed During Annual Reporting Period Ending 981031 + (06:26:17, 7 December 2024)
- ML20206F806 + (06:26:17, 7 December 2024)
- ML20206F805 + (06:26:18, 7 December 2024)
- ML20206F804 + (06:26:18, 7 December 2024)
- ML20206F802 + (06:26:22, 7 December 2024)
- U-601305, Submits Projected Dates for Administration of Requalification Exams for FY89 & FY90 + (06:26:23, 7 December 2024)
- ML20206F801 + (06:26:23, 7 December 2024)
- ML20206F799 + (06:26:24, 7 December 2024)
- ML20206F797 + (06:26:25, 7 December 2024)
- ML20206F795 + (06:26:27, 7 December 2024)
- ML20206F794 + (06:26:28, 7 December 2024)
- ML20206F793 + (06:26:29, 7 December 2024)
- ML20206F792 + (06:26:30, 7 December 2024)
- ML20206F791 + (06:26:31, 7 December 2024)
- 05000456/LER-1987-020, :on 870312,fire Zone Detection & Suppression Annunciator Capability Failed.Caused by Failure of Bearing in Power Supply Cooling Fan.Fire Watches Established & Panel Power Supply & Cooling Fan Repaired + (06:26:33, 7 December 2024)
- ML20206F789 + (06:26:34, 7 December 2024)
- ML20206F784 + (06:26:35, 7 December 2024)
- ML20206F783 + (06:26:36, 7 December 2024)
- ML20206F782 + (06:26:36, 7 December 2024)
- 05000482/LER-1987-012, :on 870309 & 13,control Room Ventilation Isolation Signals Occurred When Chlorine Monitor Sensed False High Level in Outside Air Makeup.Caused by Spurious Spikes.Monitor Design Change Being Considered + (06:26:38, 7 December 2024)
- ML20206F779 + (06:26:39, 7 December 2024)
- ST-HL-AE-2025, Forwards Program for Control of Welded Attachments in Sys Where Arbitrary Intermediate Pipe Breaks Eliminated,Per 870331 Discussion.Info & Commitments Adequate to Resolve Staff 870227 Request for Addl Info + (06:26:39, 7 December 2024)
- ML20206F777 + (06:26:40, 7 December 2024)