Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-II-99-014, on 990430,notified NRC That Licensee Received Shipment of Pd-103 Seeds & Shipment Package Was Discarded as Trash & Sent to Local Incinerator.State Was Informed of Error.No Media Interest Reported + (06:20:21, 7 December 2024)
- ML20206G382 + (06:20:21, 7 December 2024)
- ML20206G380 + (06:20:22, 7 December 2024)
- ML20206G379 + (06:20:23, 7 December 2024)
- ML20206G378 + (06:20:24, 7 December 2024)
- ML20206G375 + (06:20:25, 7 December 2024)
- ML20206G372 + (06:20:26, 7 December 2024)
- ML20206G374 + (06:20:26, 7 December 2024)
- ML20206G370 + (06:20:27, 7 December 2024)
- ML20206G369 + (06:20:28, 7 December 2024)
- ML20206G366 + (06:20:29, 7 December 2024)
- ML20206G364 + (06:20:30, 7 December 2024)
- ML20206G363 + (06:20:30, 7 December 2024)
- ML20206G358 + (06:20:31, 7 December 2024)
- ML20206G362 + (06:20:31, 7 December 2024)
- ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr + (06:20:32, 7 December 2024)
- ML20206G356 + (06:20:33, 7 December 2024)
- ML20206G354 + (06:20:35, 7 December 2024)
- ML20206G355 + (06:20:35, 7 December 2024)
- ML20206G353 + (06:20:36, 7 December 2024)
- ML20206G352 + (06:20:36, 7 December 2024)
- ML20206G350 + (06:20:37, 7 December 2024)
- ML20206G348 + (06:20:38, 7 December 2024)
- 05000260/LER-1986-007-02, :on 860519,Div II Primary Containment Isolation Sys Power Fuse Blew,Causing Inadvertent Secondary Isolation & Initiation of Control Room Emergency Ventilation Sys. Caused by Fuse Failure.Fuse Replaced + (06:20:40, 7 December 2024)
- ML20206G346 + (06:20:41, 7 December 2024)
- ML20206G345 + (06:20:42, 7 December 2024)
- ML20206G343 + (06:20:43, 7 December 2024)
- ML20206G344 + (06:20:43, 7 December 2024)
- ML20206G342 + (06:20:44, 7 December 2024)
- IR 05000324/1987005 + (06:20:46, 7 December 2024)
- ML20206G339 + (06:20:48, 7 December 2024)
- ML20206G337 + (06:20:48, 7 December 2024)
- 05000286/LER-1986-005-01, :on 860523,turbine Trip Occurred During Monthly Surveillance Test 3PT-M12.Caused by Failed Relay in Turbine Independent Electrical Overspeed Protection Sys (Ieops). Relay Replaced & Similar Ieops Relays Tested + (06:20:50, 7 December 2024)
- ML20206G335 + (06:20:51, 7 December 2024)
- ML20206G334 + (06:20:52, 7 December 2024)
- 05000387/LER-1986-021, :on 860524,controlled Shutdown Initiated When All Emergency Svc Water (ESW) Sys Pumps Declared Inoperable. Caused by 860522 Failure of ESW Pump C Due to Severe Cavitation Damage.Pumps Repaired + (06:20:54, 7 December 2024)
- ML20206G330 + (06:20:55, 7 December 2024)
- 05000339/LER-1986-005-02, :on 860529,reactor Trip Occurred from Negative Flux Rate Trip Due to Opening of Stationary Coil Power Supply Disconnect Switch.Caused by Physical Agitation Due to Personnel Painting.Switches Secured Closed + (06:20:56, 7 December 2024)
- ML20206G325 + (06:20:58, 7 December 2024)
- ML20206G326 + (06:20:58, 7 December 2024)
- ML20206G323 + (06:20:59, 7 December 2024)
- ML20206G322 + (06:20:59, 7 December 2024)
- ML20206G320 + (06:21:00, 7 December 2024)
- ML20206G319 + (06:21:01, 7 December 2024)
- ML20206G317 + (06:21:01, 7 December 2024)
- ML20206G316 + (06:21:02, 7 December 2024)
- ML20206G315 + (06:21:02, 7 December 2024)
- ML20206G314 + (06:21:03, 7 December 2024)
- ML20206G310 + (06:21:04, 7 December 2024)
- ML20206G309 + (06:21:05, 7 December 2024)
- ML20206G305 + (06:21:06, 7 December 2024)
- ML20206G306 + (06:21:06, 7 December 2024)