Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206P016 + (05:05:11, 7 December 2024)
- ML20206P014 + (05:05:12, 7 December 2024)
- TXX-6398, Forwards Addl Info Per NRC 870327 Request Re Util 860613 Response to NUREG-0737 Item II.D.1, Performance Testing of Relief & Safety Valves + (05:05:13, 7 December 2024)
- ML20206P008 + (05:05:13, 7 December 2024)
- ML20206P003 + (05:05:14, 7 December 2024)
- ML20206P002 + (05:05:15, 7 December 2024)
- ML20206N998 + (05:05:16, 7 December 2024)
- ML20206N995 + (05:05:17, 7 December 2024)
- ML20206N994 + (05:05:17, 7 December 2024)
- IR 05000254/1999008 + (05:05:19, 7 December 2024)
- ML20206N989 + (05:05:19, 7 December 2024)
- ML20206N987 + (05:05:20, 7 December 2024)
- ML20206N986 + (05:05:21, 7 December 2024)
- ML20206N985 + (05:05:22, 7 December 2024)
- ML20206N983 + (05:05:22, 7 December 2024)
- ML20206N981 + (05:05:23, 7 December 2024)
- 05000528/LER-1986-036, :on 860527,reactor Trip Setpoints for Reactor Coolant Low Flow Trip Determined to Be Outside Tech Spec Limits.Caused by Vendor Supplying Incorrect Setpoints. Setpoints Reset + (05:06:04, 7 December 2024)
- IR 05000454/1986029 + (05:06:08, 7 December 2024)
- ML20206N973 + (05:06:08, 7 December 2024)
- ML20206N971 + (05:06:09, 7 December 2024)
- ML20206N965 + (05:06:10, 7 December 2024)
- ML20206N963 + (05:06:10, 7 December 2024)
- ML20206N962 + (05:06:11, 7 December 2024)
- HL-5733, Forwards Rev 17A to Ei Hatch FSAR & Rev 14A to Fire Hazards Analysis & Fire Protection Program, for Plant.Encl Reflects Changes Made Since Previous Submittal.With Instructions + (05:06:12, 7 December 2024)
- ML20206N958 + (05:06:12, 7 December 2024)
- ML20206N954 + (05:06:13, 7 December 2024)
- ML20206N953 + (05:06:14, 7 December 2024)
- ML20206N951 + (05:06:14, 7 December 2024)
- 0CAN088605, Forwards Response to Violations Noted in Safeguards Insp Repts 50-313/86-06 & 50-368/86-06.Response Withheld (Ref 10CFR73.21) + (05:06:16, 7 December 2024)
- ML20206N944 + (05:06:16, 7 December 2024)
- VPN-049-99, Forwards Revised Epips,Including Rev 7 to EPIP 3, Response Organization Checklists & Rev 9 to EPIP 5, Emergency Preparedness Test Propgram. Changes to EPIPs 3 & 5 Ref New Owners of on-site Railroad Line,Portland & Western Railroad + (05:06:17, 7 December 2024)
- ML20206N937 + (05:06:19, 7 December 2024)
- ML20206N940 + (05:06:19, 7 December 2024)
- ML20206N934 + (05:06:20, 7 December 2024)
- ML20206N932 + (05:06:21, 7 December 2024)
- ML20206N931 + (05:06:21, 7 December 2024)
- ML20206N929 + (05:06:22, 7 December 2024)
- ML20206N928 + (05:06:23, 7 December 2024)
- ML20206N926 + (05:06:24, 7 December 2024)
- ML20206N924 + (05:06:25, 7 December 2024)
- ML20206N923 + (05:06:25, 7 December 2024)
- ML20206N922 + (05:06:26, 7 December 2024)
- ML20206N919 + (05:06:27, 7 December 2024)
- ML20206N920 + (05:06:27, 7 December 2024)
- ML20206N915 + (05:06:28, 7 December 2024)
- ML20206N916 + (05:06:28, 7 December 2024)
- ML20206N912 + (05:06:29, 7 December 2024)
- ML20206N911 + (05:06:30, 7 December 2024)
- ML20206N910 + (05:06:31, 7 December 2024)
- IR 05000416/1986023 + (05:06:32, 7 December 2024)
- TXX-4873, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions.Initially Reported on 860527.Next Rept Will Be Submitted by 860721 + (05:06:32, 7 December 2024)
- ML20206N902 + (05:06:36, 7 December 2024)