Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 11 to EP-102, Unusual Event Response & Rev 14 to EP-103, Alert Response
ML20206N924
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/28/1986
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20206N918 List:
References
PROC-860728-01, NUDOCS 8608270026
Download: ML20206N924 (67)


Text

_ - _ __ -_. --- . - - _ _ - - _ - _

- o .

3862093440

- Ppga 1 of 5 l Revision 59 07/28/86 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-101 4 Classification of 03/25/85 10/26/84 Eme rge ncies- - -- - ' -

EP-102 11 Unusual Event Response 07/28/86 10/26/84 EP-102 0 Unusual Event Response 07/28/86 07/28/86 (Accendix 1)

EP-103 14 Alert Response 07/28/86 10/26/84 EP-103 0 Alert Response 07/28/86 07/28/86 (Appendix 1)

EP-104 13 Site Emergency Pesponse 07/28/86 10/26/84 EP-104 0 Site Emergency Response 07/28/86 07/28/86 (Apoendix 1)

EP-105 13 General Emergency Response 07/28/86 10/26/84 EP-105 0 General Emergency Response 07/28/86 07/28/86 (Aopendix 1)

EP-106 4 Written Summary 04/01/85 10/26/84 Notification EP-110 6 Personnel Assembly and 03/14/85 10/26/84 Accountability EP-120 -3 Site Emergency Coordinator 04/01/85 10/26/84 EP-201 5 Technical Support Center 02/10/86 03/29/85 (TSC) Activation EP-202 5 Operations Support Center 04/01/86 04/01/86 (OSC) Activation EP-203 6 Emergency Operations 05/27/86 04/01/85 Facility (EOF) Activation EP-208 4 Security Team 12/12/84 10/26/84 EP-210 5 Dose Assessment Team' 35,4.lS9VfB1 ( /84 EP-211 2 Field Survey Group Oh 3 6/84

.jgsg$u*

~

EP-220 CANCELLED _ <s rsg1L U EP-221 CANCELLED l _

EP-222 CANCELLED , sf \N EP-230 5 Chemistry Sampling and y I y80 D*"1D/ 26/84 Analysis Team 1 8609270026 860811 PDR ADOCK 05000352 F PDR

k' . .'  :

Page 2 of 5 l Revision 59 07/28/86 LIMERICK GENERATING STATION

EMERGENCY PLAN PROCEDURE INDEX t

PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW

.EP-231 . 12 Operation of Dost-Accident 06/24/86 10/26/84 . -- -

Sampling Systems (PASS)

EP-232* CANCELLED EP-233 7 Retrieving and Changing 04/01/86 10/26/84 Sample Filters and Cartridges from the Containment Leak Detector '

!! During Emergencies

[ EP-234 7 Obtaining Containment 04/01/86 10/26/84 i Gas Samples from the l' Containment Leak Detector j During Emergencies 4

EP-235 6 Obtaining Reactor Water 04/01/86 10/26/84 Samples from Sample Sinks Following Accident Conditions

,' EP-236 5 Obtaining Cooling Tower 03/14/85 10/26/84 Blowdown Line Water Samples Following Radioactive Liquid i

Release after Accident

! Conditions l EP-237 8 Obtaining the Iodine / 04/01/86 10/26/84 Particulate and/or Gas l Samples from the North Vent Wide Range Gas

. Monitor (WRGM)

! EP-238 5 Obtaining Liquid Radwaste 04/01/86 10/26/84 Samples from Radwaste

< Sample Sink Following l Accident Conditions  !

EP-240 CANCELLED i

EP-241 10 Sample Preparation and 06/24/86 10/26/84 l 4

Handling of Highly Radioactive i- Liquid Samples

EP-242 5 Sample Preparation and 03/28/85 10/26/84
Handling of Highly Radioactive
Particulate Filters and Iodine i Cartridoes EP-243 7 Sample Preparation and 06/24/86 10/26/84 i

Handling of Highly Radioactive Gas Samples 4

,._m . , . , ,

Page 3 of 5 l Revision 59 07/28/86 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX i

PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-244 3 Offsite Analysis cf High :03/12/85 10/26/84 Activity Samples EP-250 2 Personnel Safety Team 12/12/84 10/26/04 EP-251 3 Plant Survey Group 04/01/86 04/01/86 EP-252 6 Search and Rescue /First Aid 04/22/85 04/01/85 Group EP-253 0 Personnel Dosimetry, 12/12/84 12/12/84 Bioassay, and Respiratory Protection Group +

EP-254 3 Vehicle and Evacuee Control 02/04/85 10/26/84 Group EP-255 2 Vehicle Decontamination 12/12/84 10/26/84 EP-260 2 Fire and. Damage 12/12/84 10/26/84 Control Team EP-261 2 Damage Repair Group 12/12/84 10/26/84 EP-272 CANCELLED EP-272 . CANCELLED EP-275 CANCELLED EP-276 7 Fire and Damage 02/10/86 02/10/86 Team Phone List EP-277 9 Personnel Safety 05/12/86 01/09/86 Team Phone List EP-278 7 Security Team Phone List 05/12/86 02/10/86 EP-279 8 Emergsncy Operations 05/12/86 10/26/84

~

Facility (EOF) Group Phone List EP-280 9 Technical Support 05/12/86 02/10/86 Center Phone List EP-282 6 Government and 02/10/86 04/22/85 Emergency Management 1 Agencies Phone List l EP-284 6 Company Consultants 05/12/86 02/10/86 )

and Contractors Phone List EP-287 3 Nearby Public and 07/11/85 10/26/84 Industrial Users of Downstream Water n

e , .

. Page 4'of 5 )

1 Revision 59 07/28/86 i l i

l

] LIMERICK GENERATING STATION -

EMERGENCY PLAN PROCEDURS INDEX s ,

l PROCEDURE REV. DATE. SIGNED DATE OF LAST NUMBER NO. BY SUPER.

TITLE PERIODIC REVIEW <

4

* EP-291 ~

7 Staf fing Augmentation ^ ' ~-- - - 05/12/86 - 10/26/84 ' "'

EP-292 9 Chemistry Sampling and. 12/18/85 04/22/85 Analysis Team Phone 4

List EP-294 9 Dose Assessment Team 05/27/86 01/09/86 Phone List EP-301 1 Operating the Evacuation 12/12/84 10/26/84 Alarm and River Warning ,

System

EP-303 3 Local Evacuation 12/12/84 12/12/84 EP-304 3 Partial Plant Evacuation 12/12/84 10/26/84 EP-305 5 Site Evacuation 03/25/85 10/26/84

, EP-306 3 Evacuation of the 02/10/86 10/26/84 Information Center EP-307 2 Reception and Orientation 12/12/84 10/26/84

.of Support Personnel 1 EP-312 5 Racicactive Liquid 01/09/66 01/09/86 Release

EP-313 2 Distribution of Thyroid 12/12/84 10/26/84

- Blocking Tablets EP-314 1 Emergency Radiation 03/29/85 12/06/84 Exposure Guidelines and controls l EP-315 7 Calculation of Offsite 03/25/86 01/09/86 Doses During a Radiclogical Emergency Using RMMS in the Manual Mode EP-316 4 Cumulative Population 02/10/86 02/10/86 and Near Real-Time Emergency Dose Calculations for Airborne Releases Manual Method EP-317 4 Determination of 07/15/86 07/15/86 Protective Action Recommendations EP-318 2 Liquid Release Dose 04/01/85 04/01/85 Calculations Method for

. Drinking Water ~~

EP-319 2 Fisn Ingestion Pathway 03/29/85 03/29/85 Dese Calculation

+

i e

--- . .--.,,,,,-,.3,# --y--,. - , . - , . , . - . - - - - -vm., w---- . - . ~ + , - , - - - . - + - - - - + - - - - . - - -- , - - . - - - - . , - - ,

.. Page 5'of 5 l . Revision 59 07/28/86 LIMERICK GENERATING STATION EMERGENCY PLAN PROCEDURE INDEX PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-325 -

3 Use of Containment 02/27/85 10/26/84 Dose Rates to Estimate -

Release Source Term EP-330 4 Emergency Response 03/14/85 10/26/84 Facility Habitability EP-333 1 Ad]ustment of Wide 05/08/85 05/08/85 Range Gas Monitor Conversion Factors EP-401 3 Entry for Emergency 04/01/86 04/01/86 Repair and Operations EP-410 3 Recovery Phase 03/29/85 10/26/84 Implementation EP-500 12/12/84 2 Review and Revision 10/26/84 of Emergency Plan O

f I

l

3862093450 a 'l EP-102,"Rav. 11 Page 1 of 4 MJR:rgs PHILADELPHIA ELECTRIC COMPANY q LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE

[ 6 EP-102 UNUSUAL EVENT RESPONSE 1.0 PARTICIPANTS 1.1 Shift Superintendent or designated alternate shall assume the role of Emergency Director and implement this procedure, until relieved.

l 1.2 Plant Manager or designated alternate shall relieve the Emergency Director, assume the role of Emergency Director, and continue implementing this procedure, if necessary.

f 2.0 ACTIONS-IMMEDIATE 2.1 Emercency Director shall:

2.1.1 Verify the emergency classification as determined in EP-101, Classification of Emergencies unless determination has just been made.

l 2.1.2 Complete Appendix EP-102-1, Form 1, Unusual Event

. Notification Message and sign it. Direct a communicator to complete notification of the l appropriate parties in Appendix EP-102-1, Form 3, Unusual Event Phone List within 15 minutes.

2.1.3 Direct the evacuation of affected areas,,as necessary. Refer to the following procedure:

EP-303 Local Evacuation .

l 2.1.4 Contact the Plant Manager, if necessary, and the Sh cal Advisor, inform them of the

(%I1 [Ll 6F

) p aR Tes, contact the Shift Chemistry Technician.

I If epessary, implement EP-230, Chemistry Sampling i nalysis Team.

2.1. d" copr Ib-olantJurveys, or contaminated injury, it HP Technician. If necessary, g ymd g 50, Personnel Safety Team.

, < ~

'l ' ' '. EP-102,"Rev. 11

'Page 2 of 4' MJR:rgs 2.1.7 For fire / damage recair, contact the Mainrenance Shift Assistance Foreman. If necessary, to implement EP-260, Fire and Damage Team and/or EP-261, Damage Repair Group.

2.1.8 For a liquid release, implement EP-312,-Radioactive

~

Liquic Release, if required. ,

2.1.9 For securi.ty matters, implement EP-208, Security Team, if" required.

2.1.10 Fcr airborne releases, contact Shift Technical Advisor. If necessary,' implement EP-210, Dose ,

Assessment Team. -

3.0 ACTIONS-FOLLOW-UP 3.1 Emergency Director shall:

3.1.1 Periodically reevaluate the event classification in accordance with EP-101, Classification of Emergencies, and escalate or de-escalate the classification, as necessary.

c-3.1.2 If classification is de-escalated fill out Appendix EP-102-7, Form 2, Unusual Event De-Escalation Message, sign it, and give it to the communicator and direct the communicator to perform notification of the appropriate parties listed in Appendix EP-l 102, Form 3, Unusucl Event Phone List.

3.1.3 Obtain the following information as necessary to formulate further actions:

A. Sample analysis from Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader.

l B. In plant surveys or status of contaminated injury  :

from Shift EP' Technician or Personnel Safety Team I Leader.

C. Fire / Damage Repair status from the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader.

D. Airborne releases calculation results from Shift i 2

Technical Advisor or Dose Assessment Team Leader. '

E. Notification Results from Communicator.

1 i

1

t e .. -

1

_l'* EP-102,'Rev. 11 Page 3 of 4 MJR:rgs 3.1.4 Determine which support personnel are necessary for emergency functions and direct the Shift Clerk to. contact those personnel. If Shift Clerk

, is not availabic, this function shall be assigned to an available individual.

3.1.5 If additional onsite notifications are necessary for information purposes, indicate which .

notifications should be.made en EP-102, Appendix ~

1, Form 4, Onsite Notifications, and assign to a communicator.

3.2 Communicator shall:

3.2.1 Inform Emergency Director when appropriate notifications have been made and submit completed I copy of Appendix EP-102-1, Form 3, Unusual Event Phone List, for_ Emergency Director's Signature.

l 4.0 APPENDICES (Issued as a separate document) l 4.1 EP-102-1, Unusual Event Notification Forms l 4.1.1 Form 1, Unusual Event Notification Message l 4.1.2 Form ~2, Unusual Event De-Escalation Message l 4.1.3 Form 3, Unusual Event Phone List l 4.1.4 Form 4, Onsita Notifications 5.0 SUPPORTING IhPORMATION 5.1 Purpose The purpose of this procedure is to provide guidelines for site response to an Unusual Event.

l 5.2~ Criteria for Use i 5.2.1 -This procedure she.11 be implemented when an event )

has been classified as an Unusual Event per EP-101, Classification of Emergencies, and EP-101 has been completed. -

5.3 Special Equipment Nonc

. I l

EP-102,'Rcv. 11

.. : 'I ' ,

. Page 4 of 4 3

MJK:rgs 5.4 References -

5.4.1 Limerick Generating Station Emergency Plan 5.4.2 NUREG-0654, Criteria For Preparation and Evaluation Rev. 1 of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

5.4.3. EP-303 Local Evacuation -

5.4.4 EP-101 Classification of Emergencies -

5.t.5 EP-210 Dose Assessment Team 5.4.6 EP-230 Chemistry Sampling and Analysis Team 5.4.7 EP-250 ' Personnel Safety Team 5.4.8 EP-260 Fire and Damage Team 5.4.9 EP-261 Damage Repair Group 5.4.10 EP-312 Radioactive Liquid Release 5.4.11 EP-208 Security Team

> e 4

e o . _ . .--

5 -

3862093460 '

l i

EP-102, Appendix 1 Rev. O Page 1 of 6 M R rgs APPENDIX EP-102-1 7 g 1

UNUSUAL EVENT NOTIFICATION FCRMS l FORM 1: UNUSUAL EVENT NOTIFICATION MESSAGE i

MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a drill. This is (name) , telephone number at the Limerick Generating Station calling to report an Unusual Event at Unit No. .

Time and date of Unusual Event classification are (24 Hr C The basic prob 1

'There (HAS/HAS NOT) been an (AIRBORNE) (LIQ d t release l

from the plant. The plant conditions are (STABLE / IMPROVING / DEGRADING). There is no protective action recommended. This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

{fsmAL._

k

, s --eeem oim=-

{;}T}

una ma e

EP-102, Appandix 1 Rev. O Page 2 of 6 MJR:rgs a

APPENDIX EP-102-1 FORM 2: UNUSUAL-EVENT DE-ESCALATION MESSAGE MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a drill. This is (name) at Limerick Generating Station calling to de-escalate an Unusual Event. Please connect me with the appropriate authority. This is Limerick Generating Station calling to report the termination of an Unusual Event. Time and date are . This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

Emergency Director 9

_ _ - , - p,,

_ a -.y.

=

E P_

_Y s - ~ ;, r 5 x .% u i

l

2. :s t W "~"2 o I -

8 t a e h  ? a i h c k b E e cm__

c s- .

e I " .

N 5 3 In S

_ O l ~= -

1 l , C E

$$ ,2 52 as i e8 s*

sa

%" "E I :

m 20 a_

CC 0 0 0 2 el e .2 . .E 80 ZO st 80 e

=

ZO =O o

,? $ 2 4 em '

i a $

.33 E e C

i s =_ 5 =

5 82 Om & a m W Sui l

  • m B 5 =8 3 28.

si a~ J* e  :: s't gs:

8 Eggg u ;3 0- m 3,=

M "3m i . ..

8 * .2 " ! 32 *

%* *5*

$2 C8*; .

E ' l' t * *

  • s . 22 21 -

m;

=

2.

20.

R a

m e r" :::

>o>o2 ce.e me c 0-m

=

c'I r s 8 t; >R:1! 11 8* c**

e S >

S'$ .2 : ? ? * : of C5 t?;

5 Ec*

g; 4 . .,;, .;;y, s;@;g

. ;m 8 8 258 52%

a r 0 1 c. z a. z =

et

==

2.2

-a

5 cgo

}v- f I$e

/

ou e a b $!E '

=

-5

-4 C W 02 y

II i l s  :  ;

s  : #

$ i g

' h 3

1 E

- te

~

?u .

!! .5 s

B B 8 8 8u u8 u8

=

,8 W . r

!I

p' G s

~

i "u >, 8 y, p

.m . _ . e U -

? 5, au L >, ii

% < e "a %8  %

'O 3 8 588 .  !

'E 5 5$  !

( _ _ '

il

' lll 1l.

, - ' t l

1O6s l h x

i vo

.f r g

de R n t. 5J

    • H g rp e n g i A a d P n o .

2 p 0 s 1 e

- R P

E n

'sor e

P e

m i

) T D

'T N

O C

(

)

T d S e I s L U _

3E r e N e t MO rb a

, Ri  !

em D OP bu /

F mN e T u m N Ne i E l T V ec E nr oi L hC A P(

U S

U e e ee N c c cc U ei ieii mf f mff of f off R HO OHOO O T

C E

ds R ee I

. it D f u i n t Y ti n C om e N N m E 5 e G e1 g R B a E y a M ol a -

E T e. M '

t t  :

ya n e y  :

cm a B y ni i B ex t S d go c e d u e oBf Ar l t

/ p r e e i l p t t l f ea s h p i n n c m r e o nn o e oi C B C v sh rt ei .

Pw 1 -

I l ll

EP-102, Appendi'x 1

~ Rev. O Page 6 of 6 MJR:rgs FORM 4: On-Site Notifications Escalation De-Escalation Operations Engineer ext.

Technical Engineer ext.

Shift Supervisor ext.

l STA ext.

l l Shift H.P. Sr. Tech.

ext.

j T Shift Chemistry Tech. ext.

Shift I&C Tech. ext.

Shift Maint. Asst. Foreman ext.

6 W

, -l

' ~ ,

EP-103, Rev. 14

(

Page 1 of 7 MJR rgs PHILADELPHIA ELECTRIC COMPANY

-LIMERICK GENERATING STATION g

E'4ERGENCY PLAN IMPLEMENTING PROCEDURE

~

3862093470 EP-103 ALEET RESPONSE 1.0 PARTICIPANTS 1.1 Shift Suoerintendent or designated alternate shall assume the role of Emergency Director and implement this procedure, until relieved.

l 1.2 Plant Manager or designated alternate shall report to the Technical Support Center or Control Room, relieve the Emergency Director, assume the role of Emergency Director and continue implementing this procedure, if

. necessary.

2.0 i determined in 1, Classification of Emergencies, unless determination has just been made.

l 2.1.2 Fill out Appendix EP-103-1, Form 1, Alert Notification Message, sign it and give it to the communicator.

2.1.3 Direct the communicator to complete notification of the appropriate parties as specified in Appendix EP-103-1, Form 3, Alert Phone Li'st (Initial Notification) or Appendix EP-103-1, Form 4, Alert Phone List (Escalation or De-escalation) within 15 minutes.

Hyi (0.y OR SHALL MAN THE NRC RED TELEPHONE ON A ONT3N SIS UNTIL THE NRC DISCONNECTS. IF THE ,

OhhQ @ ,S REQUIRED FOR URGENT PLANT OPERATIONS Cf j ELArtu 1v InE EMERGENCY, THE CONCURRENCE FOR i

- f M. G THE PHONE SHOULD BE OBTAINED FROM THE NRC )

aijPRIOR O SECURING THIS TELEPHONE.

l 2 .1.V Lk ta t the Plant Manager and the Shift Technical

, p

~

l if ^?n them of the situation.

L

. Y. -

EP-103, Rev. 14 Page' 2 of 7 MJR/rgs

~ /~

2.1.5 Direct the Information Center Staff (4256, 495-6767)  %~)

to implement EP-306, Evacuation of The Information

  • Center. Inform the Staff of the wind direction if there'is in airborne release.

2.1.6 If there is a' potential or actual radiological release, implement EP-305, Site Evacuation.

2.1.7 If there has not been a radiological release, 1

A. Evacuate all construction esonnel by contacting Bechtel Safet ' Direct them to call for evacuation of al

' Unit I personnel

. :' .$ . - 't .8 i el 4. o -dures. Inform h

a.

% ) =

~ Bechtel D.d- h k Y -s its to THIS WILL CALL OR TH A Y JF UNIT 2 PERSONNEL AT THE UPPER PARKING LOT. IF IT IS DESIRED THAT THEY LEAVE THE SITE, INFORM BECHTEL SAFETY.

l B. Inform Operations Security of the evacuation for information purposes, no action required.

C. Select the type 6f accountability desired for personnel in the protected area and implement the required actions below:

1. Emergency Assembly Without Accountability

-Make the following announcement l

"THIS (IS/IS NOT) A DRILL. AN ALERT HAS

" BEEN DECLARED. DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITY OR ASSEMBLY AREA. ALL OTHER PERSONNEL STAND BY FOR FURTHER 'sJ ANNOUNCEMENT. THIS (IS/IS NOT) A DRILL."

2. Emergency Assembly With Accountability A. Contact the Security Team Leader.

Inform him of the selected exist point (s), that emergency assembly with accountability is going to be implemented, and to activate the Security Team (EP-208) and to perform personnel accountability in accordance with EP-110, Personnel l

Assembly and Accountability.

i

, i.

EP-103,,Rev. 14 Page 3 of 7 MJR/rgs B. act Yoh Cons ion Security '

off-hour nd inform them that personne leaving Unit 1 will be reassembling at the Personnel Processing Center (PPC).

Make the following announcement.

"THIS (IS/IS NOT) A DRILh, THIS

. - - - - . . - (IS/IS NOT) A DRILL. AN ALERT HAS av N sE :Pa 'D P P- -

E FOR s t; > . 7 y :I i'

.f.}

-' ' g( I I e s}31;'

NEL

-W ' e s ': -,I'

, 4 h, s.i .i t -t ' ' LY -

0. 1 o' S I I' ERSONNEL LEAVE THE PROTECTED AREA IMMEDIATELY AND REASSEMBLE AT THE l PERSONNEL PROCESSING CENTER. THIS

}

l (IS/IS NOT) A DRILL. THIS (IS/IS NOT) A DRILL."

2.1 8 For off-hours, direct the Shift Clerk to activate the call list using EP-291, Staffing Augmentation. If Shift Clerk is not available, this function shall be assigned to any available individual. -

2.1.9 Direct the activation of the Technical Support Center in accordance with EP-201, Technical Support Center (TSC) Activation.

2.1.10 Assign an Operations Support Center Coordinator-(PO) to direct available personnel to report to the Operations Support Center on 269' Elev. Turbine Bldg.

and to activate it in accordance with EP-202, Operations Support Center (OSC) Activation.

2.1.11 For samples, direct the Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader to implement EP-230, Chemistry Sampling and Analysis Team. .

2.1.12 For in-plant surveys, direct a Shift HP Technician or

! Personnel Safety Team Leader to implement EP-250, 1 Personnel Safety Team.

I 2.1.13 For field surveys, when a release of gaseous l radioactive material has occurred or is suspected, direct the Dose Assessment Team Leader to implement EP-210, Dose Assessment Team.

.. J,n EP-103,.Rav. 14 Paga 4 of 7 MJR/rgs 2.1.14 For a release at or greater than the Alert level in, EP-101, Classification of Emergencies, direct the Dose Assesment Team Leader to implement EP-210, Dose Assessment Team.

2.1.15 On an interim bases, direct the Shift Technical Advisor to perform dose projections using EP-316, Cumulative Population and Near Real - Time Emerge.ncy Dose Calculations For Airborne Releases - Manual Method or EP-315 Calculation of Offsite Doses during a radiological Emergency using RMMS in the manual mode and to suggest Protective Action Recommendations per EP-317.

2.1.16 For fire / damage repair direct the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader to implement EP-260, Fir Damage Repair Group. ,e and Damage Team and/or EP-251, 2.1.17 For a liquid release, implement EP-312 Radicactive-Liquid Release, if required.

2.1.18 For Security matters, contact Security Shift Supervision and direct implementation of EP-208,

, Security Team unless previously done.

3.0 .

ACTIONS-FOLLOW-UP 3.1 Emergency Director shall:

~3.1.1 Verify that the Technical Support Center, the Emergency Operations Facility (if necessary) and the Operations Support Center have been activated.

. 3.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of Emergencies i and maintain, escalate or de-escalate the classification, as necessary.

3.1.3 If classification is de-escalated, fill out Appendix l EP-103-1, Form 2, Alert De-Escalation Notification Message, sign it and give it to the communicator and direct the communicator to perform notification of

, the appropriate parties listed in Appendix EP-103-1, Form 4, Alert Phone List (Escalation or De-escalation).

t

+ - - , ,, w r - - - - - - - :w n . -p e - - - - - - - ~ - , , , - . - - - - ~ - - r~----e-

[l* EP-103, Rav. 14 Page 5 of 7 MJR/rgs 3.1.4 Obtain the following information as necessary to ,

formulate further actions:

A. Security status from Security Team Leader B. Sample analysis from Shift Chemistry Technician

or Chemistry Sampling and Analysis Team Leader

, C. In-plant surveys from Shift HP Technician or

Personnel Gafety Team Leader D. Field surveys from Dose Assessment Team Leader E. Dose projections and protective action
recommendations from Shift Technical Advisor or Dose Assessment Team Leader F. Fire / damage repair status from the Maintenance

. Shift Assistant Foreman or Fire and Damage Team Leader G. Notification results from Communicator

, 3.1.5 Determine which additional support personnel are ,

necessary for emergency functions and direct the Shift Clerk or other assigned communicator in TSC to contact those personnel.

3.1.6 Provide site personnel with public address (PA) announcements for any major changes in plant emergency status, such as changing emergency action

. levels and evacuations.

3.1.7 Evaluate the need and order evacuation of effected areas as necessary. Refer to the following procedures: EP-303 Local Evacuat!on, EP-304 Partial j Plant Evacuation, EP-305 Site Evacuation.

3.2 The Communicator shall:

^

3.2.1 Inform Emergency Director when appropriate Notifications have been made and submit completed l copy of Appendix EP-103-1, Form 3, Alert Phone List i l (Initial Notification) or Appendix EP-103-1, Form 4, i

Alert Phone List.(Escalation or De-Escalation) for Emergency Director's Signature.

2

-,y- -.---,.m. - _ _- _,-. _. ,-

. . _ , , _ _,-.e- .,.m . - -,,,, _ ..- . . _

's . . . j' EP-103,,Rsv. 14

, Paga 6 of 7 MJR/rgs 4.0 APPENDICES (issued as a separate documen't) ,

l 4.1 EP-101-1 Alert Notification Forms l 4.1.1 Form 1, Alert Notification Message l 4.1.2 Form 2, Al'ert De-Escalation Notificaticn Message i 4.1.3 Form 3, Alert Phone List (Initial Notification) 4.1.4 Form 4, Alert Phone List (Escalation or De-Escalation) 5.0 SUPPORTING INFORMATION L 5.1 Purpose ,  ;

The purpose of this procedure is to provide guidelines for site response to an Alert.

5.2 Criteria For Use 5.2.1 This procedure shall be implemented when an event has been classified as an Alert per EP-101, Classification of Emergencies, and EP-101 has been completed.

5.0 Special Equipment None' 5.4 References 5.4.1 Limerick Generating Station Emergency Plan 5.4.2 NUREG 0654, Criteria for Preparation and l Rev. 14. 1 Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

5.4.3 EP-303 Lccal Evacuation 5.4.4 EP-101 Classification of Emergencies 5.4.5 EP-304 Partial Plant Evacuation 5.4.6 EP-305 Site Evacuation 5.4.7 EP-306 Evacuation of the Information Center

  • -+

~

'l-EP-103,.Rsv. 14 Prga 7 of 7 MJR/rgs l

5.4.8 EP-291 Staffing Augmentation 5.4.9 EP-201 Technical Support Center (TSC) Activiation ,

5.4.10 EP-202 Operations Support Center (OSC) Activation 5.4.11 EP-317 Determination of Protective Action l Recommendations 5.4.12 EP-316 Cumulative Population Dose Calculations for Aircorne Releases- Manual Method l 5.4.13 EP-110 P.arsonnel Assembly and Accountability 5.4.14 EP-208 Security Team 5.4.15 EP-210 Dose Assessment Team 5.4.16 EP-230 Chemistry Sampling and Analysis Team I

5.4.17 EP-250 Personnel Safety Team 5.4.18 EP-260 Fire and Damage Team l 5.4.19 EP-261 Damage Repair Group 5.4.20 EP-312 Radioactive Liquid Release

, 5.4.21 EP-315 Calculations of offsite doses during a Radiological Emergency using RMMS in the manual mode l

I s - ~

3862093430 EP-103, Appendix 1 Rev. O Page 1 of 8 MJR/rgs P

gg

, APPENDIX EP-103-1 i ALERT NOTIFICATION FORMS FORM 1: ALERT NOTIFICATION MESSAGE l

MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a , ,__

drill. This is (name) , telephone number at Limerick Generating Station calling to report an Alert at Unit No. _.

Time and date of Alert classification are , .

(24 hr. clock time) (date)

The basic problem ,

  • I' '$ S',[S NOT)

, , s been an (AIRBORNE '(LI ' 3D)#Ta' oac e -s' m e.the '@ladt . The plant conditions are (STABLE / IMPROVING / DEGRADING). There is no protective action recommended. This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

Emergency Director CONTROLLED CGPY annam .

EP-103, Appendix 1 Rev. O Page 2 of 8 MJR/rgs FORM 2: ALERT DE-ESCALATION NOTIFICATION MESSAGE MESSAGE: This (IS/IS NOT) a drill. This (IS/IS NOT) a drill.- This is (name) at Limerick Generating Station calling to report a change in emergency classification. The Alert has been (DE-ESCALATED

'TO AN/ UNUSUAL EVENT / TERMINATED).

Time and date are .

(24 Hr C ock Time) (Date)

The plant status is ( STABLE /IMPROVIbia s (IS/IS NOT) a drill. This (IS/IS NOT) a drill.

e O

Emergency Director i

__m

)

i 08 s _

g x

t oe

,f vo/

r R

. _ N n, R 3 MJ g

- e n _

r g i _

a a d P n a

o p

u s l e M ~

- P

~

w n o

s Ot r .

e P

M E

i T

e m

' )

N O

T I S T I A L C I

3E F N I M0 T E r Ri O f

NDe OP N 0Eb F ism f

T L PUu R A N E I ER L T lee A I CBn N RMo I I Uh

(

GNP e e e e c c c c ei mf ei mf ei mf i f

lof of of f O l O l O O d l l I e

f n i ds o t ea s o it nt e n f u '

i c b e in ae b n ti is c

y mn t e oM f  : en s o e N

f s c o r ro u t eb 5

f e n n e c m v e1 On e uo t ds soe B ye d g ry ai n ni C nbv y et e ad R oaa t r ec rc C N i h ol Te r

e na up mn ue t C t e r E e Bt A s sR g) ah s ya t

e h oe g oP n aN nrct e cm g ke c Cr aA ar oD l i oi i

%[%#y.' y , P t P d ni a i i , i M l t t r c a y nt n g caien e ex n 3  ! p ry an anr t

a ,

li t go a l t art t e a f jJ , ' s ec ve vou ra an t of g mn 1

A r ib n i l m l ed t u naa

,l

/ p "g'ey D oe ye yt s ps t

,1 l

eA n

p * .

.w f 4 d gg t r.

sg na sai nir Oe h

se in c

d

/

Qi_f, e e.

I  ;

3 a ne nn ndr Ct h o ne

'* s nn t r om I l P

o ea eaa R e th os en oOWdl oi ." L ME PM PRl NB p sn o i

e sh ee l

  • r e ps I

[

m i

rt ei

_ kl ec mr 5

E PW a b c _ d e

f ae Mt Pi ~e o e L5cp l

i G CT  !

l

(

1 2

l FW

--II

=_

Fr- -oem 7 ." :: o ' l 9 ?E~h ,

E & 5 5 m

_ g n &

- 7 E c- S c E- O r u o

P hm o l E

m p = h g- o ;i h -

E 3d q P no t -

R 5 8E w u

= of e 882 ,

b 'vx a< E85=

E. U E $$o E *E Wi8 L .G e f -

u vu u "u  ;

,  := i= u= s ==g =g .

1 e3 e3 eB2 es2 es2

a

% O

.I =

= ;u e m - ,,

  • 0  ? u w E g B

ra m e S .. : . . 9 8 o

g u>

te

,3 r~'

E o If

*'hhg S [ yy W p 6

.3 yO.N :r c? c w wc U s A Mm? 58 "*

r< g

{!

p 3 g '

c- M 3 $y & sglh 3i

, "[j jj 0,

! ig 2 0

. '{_. ;
i,

. i' e o 23*

tg u!

ag t*

l I ,  !  : .

^ 7/ypp/

i h h,h 74 5 $$ E! $N

~'

{%g .5

+ \, =;\< , I a. .-

l g

+

~--

1O8s g

x .f r ivo/ -

de R nR5J M g e n r g i A a d P n o

3 p 0 s 1 e

- R P

E n o

s r

e P

e m

i T

)

N O

T I S T I A L C I

3E F e N I t

MO T E r a RH O NDe D OP N OEb /

F l ism e T L PUu m R A N i E I ER L T lee T AI CBn .

N RMo t I IUh x

( CNP E ee cc eii mff R off O

! OO T C

E d R I

e D i

f i t Y

t n C o e N E

N m G e R e

t g E B i a M r n E o u a ~

T c y e  :

y S n e y  :

c o f B y d n s i a l e e n t S d I

t a

g o c e d A i u e met l t i / t r e e i t l a t t l f i e r s h p i n n e n c m r I n o e o e o O C B C V e s m r _

i e . .

T P k 1 L

1L

308s g

n ivo/

de

.f r R

nR6J H

e

, g -

i A a d P n 3

0 s 1 e

- R P

E n o

s r _

e _

P e

m i

T

)

N

  • O I

T l T A S L I A L C S

4E E N -

MO E E r RI D I

NDe OP OEb F R ism i

T O PUu R N E N ER L O lee AI CBn T RMo A. IUh I CNP A

C S e e E c r c c

( ei e ei ei mf gmf mf of aof of I l

I O P! OI O s

t c

d e e nn e l in b f ao i mc t t f es s o o r ri u N n e d m uo t n

d nC C e - ai e aR R B et rc C N N o r ue t g)

T e BtA s sl h oP n ai nr c ar oD lt n

io tt c t iP ,

iM d n a n g t l u ca anr a , ar i

l e ae t s vou lib ra ed cn t e n p a i D yt s ps o oO .

i l t l sai Oe sh i p c

d i e d nir h n n a ndr Ct he n e n o eaa Re tl o s I

o L PR!  ! NB e s n e s et r e k e c Ca i

T m r P

e a

b c

d f

an Mo Pi

( L A

L E

y

- o co m 7'

  • t .wL -

a >ON tc c: ,

cM6g e c  :

.O .~ .m

< m t =

A C

~ O M a --

=

o m -

M GJ ,

i w c M O

N s' n E

+ =

=

J

3O p

b 4 C0 J L w <

J U .

n IO M M L  :

d= ZQ0 a4 C3

=

i O4 O M .o Ca. '% = U2 E .;

Fa O AC3 _

C: Z 1 Ca3 Z MM 7 m3 O J Cn3 D -

i 4 m U C3 C -

Ea cIO a 4 -D4 j d UZ4 =

U ,5 m e o e 1 M U UL U e6 1 w 0 .* c .* g e. e U gj t Eu Ew& Eu E

Ow O w to Ow O w to 1 .

8 M

8

=O =OA =O mua  !

I

! O C C I T O O .

I

  • Muun

. . 0  :: 1

% 4o to QP

  • C.t E 38 >

4 O W L M~  ?.

O 9 0- O

= >w w AN 3 j L i MOa C O O l C C .Q u w ^

u c -

5 C:3 0 to O c to os b

O  ::to J:; c "

.S M .a,

. E o

a Uw0 .O O E -l i > ** O 3 C (s) m _-

p U wL4 A c m -

. t C *** G @ V3 l @

? O O MM O l L e c d"i a CT Ow> UI e u6e P (Q < c (O tO L L E to O e -3

==* N .c 0 3 M. cal g

- M M bt & O L U tu -

E *" b 6 @ t/1 tG  % G QJ v -

C C MM C c u uL @

i w c t0- (Q .c .

c.4 . L ]

O cmO I N U3 A <Qa

- 0 m O Q. C 4 E L UEo t i= ~ D GOO * *

[

j . e a mum c w ,

s J J

a

L

~

EP-103, An .ndix 1f' Rev. 0' Page 8 of 8',

MJR/rgs FORM 4 -

ALERT PHONE LIST ime Initiated (ESCALATION OF DE-ESCALATION)

CIRCLE PHONE NUMBER USED Personnel / Agency To Be Notified Phone Number Time Person Responding _

g. Montgomery County Office of Eme n Pr aredness
h. Berks County Emergency ,

Man ment A enc s

" g i.. Chester County Emergency, ' [* N'i- [jI Services ' * '

j. Construction Management JE N

Home Office Hone Office Home ,

Office Home Office Bechtel Safet Office Completed By: Time /Date t Verified By:

EMERGENCY DIRECTOR l k 1

1 3862093490

'.- * [I ' EP-104, Rev. 13 l Pa'ge 1 of 7 MJR:rgs l

PHILADELPHIA ELECTRIC COMPANY 7 /'

LIMERICK GENERATING STATION 7 64 EMERGENCY PLAN IMPLEMENTING PROCEDURE j EP-104 SITE EMERGENCY RESPONSE

\

1.0 PARTICIPANTS 1.1 Shift Superintendent or designated alternate shall {

assume the role of Emergency Director and implement this procedure, until relieved.

l 1.2 Plant Manager or designated alternate shall report l to the Technical Support Center or Control Room, relieve the Emergency Director, assume the role of Emergency Director, and continue implementing the procedure, if necessary.

1.3 7 , g ,, -k\

y ,

, {g s

', {. .

ahN ,

h ahi' sary.

2.0 ACTIONS-IMMEDIATE 2.1 Emergency Director shall:

2~1.1 Verify the emergency classification as determined in EP-101, Classification of Emergencies unless determination has just been made.

l 2.1.2 Fill out Appendix EP-104-1, Form 1, Site Emergency Notification Message, sign it and give it to the Communicator.

2.1.3 Direct the communicator to complete notification of e gh a@D Thh.

p4*g s EP aLOJ.I,,{priatepartiesasspecifiedinAppendix Form 3, Site Emergency Phone List (Initial g b on) or Appendix EP-104-1, Form 4, Alert U

one List (Escalation or De-escalation) within 15 gg utes.

T5 E COMMUNICATOR SHALL MAN THE NRC RED TELEPHONE ON A CONTI S BASIS UNTIL THE NRC DISCONNECTS.

i Ah I ct b Plant Manager and the Shift Technical Advisor, inform them of the situation, if not already done. .

l l

1 i.

l

  • l' EP-104, Rev. 13 Pa'ge 2 of 7 6

MJR:rgs 2.1.5 Direct tne Information Center Staff ID l

to implement EP-306, Evacuation of the n orma ton Center, if not already done. Inform the staff of the wind direction, if there is an airborne release. ,

2.1.6 If there is an Potential or Actual radiological release, implement EP-305, Site Evacuation.

2.1.7 If there has not been a radiological release, u A. Evacuate all constructio sonnel by contacting Bechtel Safety Direct them to call for an evacuation o Unit 2 personnel in accordanceswith Bechtel procedures.

form them of na e of hazard. Bechtel Safety I S

DESIRED TEAT THEY LEAVE THE SITE, INFO HTEL SAFETY.

I -

B. Inform operations security f the i evacuation for information purposes, no action required.

C. Select the type of accountability desired for personnel in the protected area and implement the required actions below: 'd

~

1. Emergency Assembly Without Accountability

- Make the following announcement l "THIS (IS/IS NOT) A DRILL. A SITE EMERGENCY EAS BEEN DECLARED. DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITY OR ASSEMBLY AREA. ALL OTHER PERSONNEL STAND BY FOR FURTHER l ANNOUNCEMENT. THIS (IS/IS NOT) A DRILL."

2. Emergency Assembly With Accountability
a. Contact the Security Team Leader.

Inform him of the selected point (s),

that emergency assembly with accountability is going to be implemented, and to activate the Security Team (EP-208) and to perform personnel accountability in accordance with EP-110, Personnel Assembly and Accountability l

b ,

EP-104., Rev. 13 Page 3 of 7 MJR:rgs

~ b

b. Contact Yoh Construction Security off-hourf4lll$p>and inform them that -

personnel leaving Unit 1 will be reassembling at the Personnel Processing Center (PPC)

\ r Make the following announcement.

m,AR L, T IS (IS/IS N

Y

. ALL OTHER UNIT ONE SONNEL LEAVE THE PROTECTED AREA IMMEDIATELY AND REASSEMBLE AT THE PERSONNEL PROCESSING CENTER. THIS (IS/IS NOT) A DRILL. THIS I

(IS/IS NOT) A DRILL.

2.1.8 For off hours, if not already accomplished at the l Alert stage, direct the Shift Clerk to activate the  ;

call list per EP-291, Staffing Augmentation. If l

' Shift Clerk is not available, this function may be l assigned to any available individual. I i

2.1.9 Direct the activation of the Technical Support Center in accordance with EP-201, Technical Support Center (TSC) Activation, if not already activated.

2.1.10

  • If the EOF has not been activated earlier, during the Alert Response procedure, direct a communicator to call EOF personnel (directing them to report to the EOF) using EP-279, EOF Group Phone List.

2.1.11 Assign an Operations Support Center coordinator (PO) if not already done, to direct available personnel to report to the Operations Support Center and to activate it in accordance with EP-202, Operations Support Center (OSC) Activation.

2.1.12 For samoles, direct the Shift Chemistry Technician i

or Chemistry Sampling And Analysis Team Leader to implement EP-230, Chemistry Sampling And Analysis Team.

2.1.13 For in-clant surveis, direct a Shift HP Technician or Personnel Safety Team Leader to implement EP-250, Personnel Safety Team .

2.1.14 For field surveys, when a release of gaseous radioactive material has occurred or is suspected, direct a Shift HP Technician or Dose Assessment Team l

\

Leader to implement EP-210, Dose Assessment Team .

' ~

Page 4 of 7 i

MJR:rgs For,a release, at or greater than the Alert level in 2.1.15  !

EP-101, Classification of Emergencies, or at the i disc
etion of the Emergency Director, direct the

- Dose Assessment Team Leader to implement EP-210, Dose Assessment Team.

l

, 2.1.16 On an interim basis, direct the Shift Technical Advisor to perform dose projections using EP-316,

- Cumulative _ Population Dose. Calculations for Airborng2 l Releases-Manual Method or EP-315 Calculations of

.Offsite Doses during a Radiological Emergency using RMMS in'the Manual Mode and to suggest Protection i , Acti'n o Recommendations per EP-317.

2.1.17 For fire / damage repair direct the Maintenance Shift 1

Assistant Foreman or Fire and Damage Team Leader to implement EP-260, Fire and Damage Team and/or

! EP-261, Damage Repair Group.

a l

2.1.18 For a liquid release, implement EP-312, Radioactive

Liquid Release, if required.

!l 2.1.19 For Security matters, contact Security Shift

[ Supervision and direct implementation of EP-208,

. Security Team, unless previously done.

l 3.0 ACTIONS-FOLLOW-UP 3.1 Emergency Director shall:

3'.l.1 Verify that the Technical Support Center, Emergency Operations Facility and the Operations Support Center have been activated.

3.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of Emergencies and escalate or de-escalate the classification, as necessary.

3.1.3 If classification is de-escalated, fill out Appendix l EP-104-1, Form 2, Site Emergency De-Escalation Notification Message, sign it and give it to the communicator and direct the communicator to perform notification of the appropriate parties listed in l Appendix EP-104-1, Form 4, Site Emergency Phone List (Escalation or De-escalation).

3.1.4 Obtain the following information as necessary to i formulate further actions:

A. Security Status from Security Team Leader B. Sample analysis from Shift Chemistry Technician or Chemistry Sampling And Analysis Team Leader i

.-.,._.N , , $-l , . .., , , l,-

-.5,.--n.- ,'? , , , - - , . - - . . - - , . . .

. , , I.- .

.l

, EP-104 f Rsv. 13 Page 5 of 7 MJR:rgs C.- In plant surveys from Shift HP Technician or

  • Personnal Safety Team Leader D. Field surveys from Shift EP Technician or Dose Assessment Team Leader E. Dose projections and protective action recommendations from Shift Technical Advisor or

, Dose Assessment Team. Leader .

F. Fire / Damage repair status'from the Maintenance Shift Assistant Foreman or Fire and Damage Team .

Leader.

G. Notification Results from Communicator.

3.1.5 Discuss protective action recc=mendations with the Site Emergency Coordinator.

3.1.6 Determine which additional support personnel are necessary for emergency functions and direct the shift clerk or other assigned communicator to 1

contact those personnel.

~

3.1.7 Provide. site personnel with public address (PA)

announcements for any major changes in plant emergency status, such as changing emergency action levels and evacuations.

1 3.1.8 Evaluate the need and order evacuation of affected j ,

areas as necessary.

Refer to the following procedures:

EP-303 Local Evacuation EP-304 Partial Plant Evacuation EP-305 Site Evacuation 3.1.9 Perform the following until relieved by the Site Emergency Coordinator: 1 A. Discuss protective action recommendations with the Dose Assessment Team Leader.

B. Provide protective action recommendations, if necessary, to the Pennsylvania Bureau of Radiation Protection.

C. Inform the various emergency response groups if the recovery' phase organization is to be implemented.

1

_ . . _ . ... _ ..._m -. . . . _ . .

4

. o. .

l EP-104, Rev. 13 Page 6 of 7 MJR:rgs 3.2 The Communicator shall:

3.2.1 Inform the Emergency Director when appropriate notifications have been made and submit completed I copy of Appendix EP-104-1, Form 3, Site Emergency .

Phone List (Initial Notification) or Appendix l EP-104-1, form 4, Site Emergency. Phone List '

(Escalation or De-escalation) for Emergency Directors. Signature. . - ... . . . . . .

  • l 4.0 APPENDICES (Issued as a separate document')

l 4.1 EP-104-1, Site Emergency Notification Forms l 4.1.1 Form 1, Site Emergency Notification Message l 4.1.2 Form 2, Site Emergency De-Escalation Notification l Message

4.1.3 Form 3, Site Emergency Phone List (Initial Notification) 4.1.4 Form 4, Site Emergency Phone List (Escalation or De-escalation) 5.0 SUPPORTING INFORMATION 5.1 Purpose The purpose of this procedure is to provide guidelines for the site response to a Site Emergency.

5.2 Criteria For Use 5.2.1 This procedure shall be implemented when an event has been classified as a Site Emergency per EP-101, Classification of Emergency and EP-101 has been completed.

5.3 Special Equipment e

None 5.4 References 5.4.1 Limerick Generating Station Emergency Plan 5.4.2 HUREG 0654, Crireria For Preparation and Rev. 1 Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Tower Plants.

. . . - - . . . -~., . .. .. .- - . ..

, _ g.  ? -r- w

'i '

EP-104, Rsv. 13 Pa'ge 7 of 7 MJR:rgs 5.4.3 EP-101 Classification of Emergencies 5.4.4 EP-291 Staffing Augmentation 5.4.5 EP-201 Technical Support Center (TSC) Activation 5.4.6 EP-202 Operations Support Center (OSC) Activation 5.4.7 EP-317 Determination of Protective Action Recommendations 5.4.8 EP-316 Cumulative Population Dose Calculations For Airborne Releases-Manual Method 5.4.9 EP-303 Local Evacuation 5.4.10 EP-304 Partial Plant Evacuation 5.4.11 EP-305 Site Evacuation 5.4.12 EP-306 Evacuation of the Information Center 5.4.13 EP-110 Personnel Assembly and Accountability 5.4.14 EP-208 Security Team 5.4.15 EP-210 Dose Assessment Team 5.4.16 EP-230 Chemistry Sampling and Analysis Team

~

5.4.17 EP-250 Personnel Safety Team 5.4.18 EP-260 Fire and Damage Team 5.4.19 EP-261 Damage Repair Group 5.4.20 EP-312 Radioactive Liquid Release 5.4.21 EP-279 Emergency Operations Facility (EOF) Group Phone List I 5.4.22 EP-315 Calculations of Offsite Doses During a Radiological Emergency using RMMS in the Manual Mode l

l a 9e b$ e seme N- --

99+g "

9H m * *Www~ 6 h

3862093500 EP-106, Appendix 1

. Rev. 0 )

Page 1 of 11 MJR:hfz APPENDIX EP-104-1

? 29f%-

SITE EMERGENCY NOTIFICATION FORMS i

FORM 1: SITE EMERGENCY NOTIFICATION MESS.TGE t.

MESSAGE: THIS (IS/IS NOT) A DRILL. THIS (IS/I$ NOT) A DRIL&.

This is (name), Limerick Generating Station calling to report a Site Emergency at Unit No. .

l Time and date of Site Emergency classification are:

, / / .

(24 Hr. Clock Time) (Date)

The basic prob 'n 3 - -

~ ~

s . - o Thet e (HAS/HAS f 'OT) tbg' e 'a .

.1IR 's :'

  • L (e,I*- r d .s ~,

, ve$

release from t.- pl.nr. he plan conditions are (STABLE / IMPROVING / DEGRADING).

There is no protective action recommended.

THIS (IS/IS NOT) A DRILL. THIS (IS/IS NOT) A DRILL.

l k h , a J h'.m . Emergency Director qgy 5[

l KD 00 V"E ED .

l 1

EP-104, Appundix' 1

, "Rev. O Page 2 of 11 MJR:hf: i APPENDIX EP-104-1 SITE EMERGENCY NOTIFICATION FORMS FORM 2: SITE E'iERGENCY DE-ESCALATION NOTIFICATION MESSAGE MESSAGE: THIS (IS/IS NOT) A DRILL. THIS (IS/IS NOT) A DRILL.

This is __ (name), Limerick Generating Station calling to report a change in emergency action level. The Site Emergency has been (DE-ESCALATED TO/AN UNUSUAL EVENT / ALERT / TERMINATED).

Time and date are:

, / / .

(24 Er. Clock Time) (Date)

The Plant conditions are (STABLE / IMPROVING).

THIS (IS/IS NOT) A DRILL. THIS (IS/IS NOT) A DRILL.

~

4

~~

Emergency Director i

a h

1

.4

=

emi 4 C s* *me. - ---me m -- - - - _ _ _ _ _ _ . _ - _

ib! -

l

=

se E

l d

q se

. 2 'n*

b-

=

r.c I

I

= nn k

5 - I l k

k% em% -

-g

, 3 O

= L T 3 E o L 7

n

!!w u

~ b a.

5 5t es 8

as E" 5 Me we d e b "a 82 1' E 5 $5 E'*

S E Gt

, $ "5 .5 a E -

Ei! !

y a b-c2 .:

E* .28 >, -

es t? E oJ mE ot a.2 "n ,

DR 8.h t Et e- t  : 5: 2<

J t t es .E .e'

.. W2 m  % >, e 2.  ;'s

? ES E R~ t *5 *80 W 80 %S %;" '

I i;i .E E e ?S Ea s .* :

E5 8 8- 55 5?t

] -~

a J 20 aI am= -

b~

a @

D U

D G

EP-104, Appendix 1 Rev. O Page,4 of 11 MJR:hfz APPENDIX EP-104-1 SITE EMERGENCY NOTIFICATION FORMS FORM 3: SITE EMERGENCY Pi!ONE LIST (INITIAL NOTIFICATION)

Time Initiated:

i l i I I l l PERSONNEL / AGENCY TO BE NOTIFIEO l PHONE NUMBER l TIME l PERSON l l (Within approx. 15 Minutes) l (Circle Phone Number Used) l l RESPONDING l 1 I I I I l f. NRC Operations Center Red

  • l l l Dethesda, MD l l l l l l Hake this call last and l l l remain on telephone unti l l

-l NRC disconnects l l l

1 I l (Person contacting NRC l l l 'l l must be Licensed Operator) i l l l O

e

7-EP-104. Appendix 1 Rev. O Page 5 of 11 HJR:hfz APPENDIX EP-104-1 SITE EMERGENCY NOTIFICATION FORMS

, FORM 3: SITE EMERGENCY PIIONE LIST (INITIAL NOTIFICATION) 9 Time Initiated:

1 I  ! l l l PERSONNEL / AGENCY TO BE NOTIFIED l PIIONE NUMBEll l TIME l PERSON l l (Within approx. 15 Minutes) l (Circle Phone Number Used) l l RESPO11 DING l l l l l l l Secondary notifications to be l l l l l completed after the above l l l l l personnel / agencies have been l l l l l notified: l l l l l i I g. Mana r - Publi l l l l l l l l l- l l l l number w i you are ust l I .

b$IY l l l l Pager l l l l l (After tone, dial phone l l l l l number which you are using) l l l l 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> - l l l l l (As for public info l l l

.l l representative on call) l l l

-,,,-----,-na --- m mammermirmmq 0-3 ___________________________

b b2b E

!"*2  !!

  • i  !?

f' s

s-T e -

l l E

5

. 0 08 s.$

s E 5E  !!

.x a 58 =.

e e u .

! s i2 _

si

  • 5

! .t !g E ,

t' g s* 2 5 E a .t N I $ $E 1 5 d

as Em 5k E2 3:

s'8

I i e su e 5 $E 5.! 35l O! t$ 3 d .5 .I tea sg ;; ; 2 5

hh $$ $$$ $3 $5 E 5~

m .c w a .. w .o -

EP-104, Appendix 1 Rev. O Page 7 of 11

. MJR:hfz APPENDIX EP-104-1 SITE EMERGENCY NOTIFICATION FORMS 'l FORM 3: SITE EMERGENCY PilONE LIST l (INITIAL NOTIFICATION)

Time Initiated:

l l l l l l l PERSONNEL / AGENCY TO BE NOTIFIED l PilONE NUMBER l TIME l PERSON l l (Within approx. 15 Minutes) l (Circle Phone Number Used) l _/ l RESPONDIllG l l

Completed By: Time /Date: '{ t Verified By:

} Emergency Director 1

l l

t  !

e.

EP-104, Appendix 1 Rev. O Page 8 of 11 MJR:hfz APPENDIX EP-104-1 I

SITE EMERGENCY NOTIFICATION FORMS FORM 4: SITE EMERGENCY Pi!ONE LIST (ESCALATION OR DE-ESCALATION)

Time Initiated:

I l' I I l l PERSONNEL / AGENCY TO DE NOTIFIED l PilONE NUMBER l TIME I PERSON I

I (Within approx. 15 Minutes) l (Circle Phone Number Used) l I RESPONDING I I I I I I I Mana l i 1 l I a. I I i 1

l c .f l l l l l l 4 l I I ,

! I l I i I I I I I I I I i l i l I i l' I I I i l . I lh I

l I I i

( l c. Pennsylvania Bureau of l l l l l Radiation Protection, l 8 AM'- 4 PM i l l

I l liarrisburg, PA I 8 AM - 4 PM l l l l After hours l l

! I I I d. NRC Operations Center l l I

.I Bethesda, MD I I l l 1 1 I I Make this call last and i I l '

, I remain on telephone until I i I l l NRC disconnects l l l l l l . I I I

! , I (Person contacting NRC l l l l l 1 must be Licensed Operator) l l l l i

l i

~ __ _

l EP-104, Appendix 1 Rev. O Page 9 of 11 APPENDIX EP-104-1 SITE EMERGENCY NOTIFICATION FORMS FORM 4: SITE EMERGENCY Pi!ONE LIST (ESCALATION OR DE-ESCALATION)

Time Initiated:

~

1 I l. I 1 l PERSONNEL / AGENCY TO DE NOTIFIED I P!!ONE NUMDER I TIME l PERSON l l (Within approx. 15 Minutes) 1 (Circle Phone Number Used) l l RESPONDING l 1 I I I

' l I Agencies to be contacted after i l l l the above personnel / agencies I  !(! l I have been notified: l l e. Mana er - Public Inform l l t

[

i I I I I I I I I I I I I I I l 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l I l I l l I i l i  !

E o

i

- C, - s ___________________________ ,

  • w it0>0% f.

e 5: 02 EE 4 i~ 0 E8 m a. .

p i L ln

- r0 W

  • s g ___I________________ ___i -_ __

y w

i_

a I ,

b -

g ,w-c e e __

-L E _

2 "5 m-5 5 "e 7

e E

Edu o U > Cn c: d M - UM r. 3 "Q I k 2 l 1 C3 5 1 - M f4 I W E~ OQ D O  %  %

d is m?

O > W ZO '

Z U Z O .C Z Z WO = 0.

2. a s- c.

C. O - E~ O

< = v. < - 4' fu 3 U I ..< L a

  • W G e gm -

C O  :

m A __

j 0

5 N M C to N .

- 0 00 0 -

so C .- C >, C -

OP -

wtU 4)

Id I C

C

, i_ OuO $ -

C) -

f:

0 .

  • j ,

- 4 N

& O a!!

tti I

C & 'm -N L > E &

- fpf a c; O y N O -4 6 't. ' l ', CL EC =

E- N CJ '. ,4;d :.; a c. r.x3 0 x 2 J E L "t O & a

> >: C W U1 <('.7M

>Mlj?.4 " '

U N< C UO OL to 2,L h.

+e oa p

/,-o-id 0

5&

0 O<

E' S 0 fC M LT

  • jfls($df t'"8" 8 . 3a M-- 0 00 to 4 < (D EC to O O . ji ,'9. / 'd ' EbUE L 0 f0 N

aC N-t C4 u u L j-fQ'[ ST to C0 CJ 0 0 4 a .a- & E en o a- -

[d - aW 0L 00 r0 u) > '

- 2 .C uO P % 0 'R,, $w- C %C c) % -1 C

2a O -- e

- O m-

< Q Q.

.N'O}$y f

,', p , - ,VIOwO 0c:"aI .C G)

U cn 3

4 0 x- i E tu .

5

- c. 6

& .- D E-2 "1

r

1O1 z Ill 1f x . h ivf  : G deoR N nR J NI e 1M OD

_ p 1 SN

_ p RO A e EP g PS

, a E 4 P R 0

1 Ill P

E E e M t a

I T D

/

e m

i T

S T Ill M S R I O L F )

E d N N e O O s 6 1 I I

I U

- T P 4 A r 0 C Y Re 1 I C Eb

- F N 3m P I E  !

u E T G UN O R N X N E e * ,

I M En D Y E

~

! o N C Oh E N E I I P P E T P P G I e A R S l E c M  : r .

E 4 i C

E M (

T R r I O o S F ill t c

D e E r I) i Fs D

_ I e Tt y Ou c Nn n i e EM g B r 5 e O1 m T E Yx Co

Nr d Ep e Gp t Aa  :

y y a /

i Ln B B t Ei i Nh d d n Nt e e I Oi t i SW e f e R( l i m E p r i P m e T o v lll C l, 1 li

a;.. '; .

3862093510 l EP-105, Rev. 13 Page 1 of 8 MJR:kml PHILADELPHIA ELECTRIC COMPANY l 1 -

LIMERICK GENERATING STATICN 73 [

EMERGENCY PLAN IMPLEMENTING PROCEDURE ,

l EP-105 GENERAL EMERGENCY RESPONSE l

l l

1.0 PARTICIPANTS 1.1 Shift Superintendent or designated alternate shall l tssume the role of Emergency Director and implement  !

this procedure until relieved.

l 1.2 Plant Manager or designated alternate shall report chni al Support Center or Control Room, role of the )

1.3 _ .

e Emergency Operations Faci a e appropriate section of this procedure, 1 necessary.

2.0 ACTIONS - IMMEDIATE 2.1 Emercency Director shall:

2 .~1.1 Verify the emergency classification as determined in EP-101, Classification of Emergencies unless determination has just been made.

l 2.1.2 , Fill out Appendix EP-105-1, Form 1, General Emergency Notification Message, sign it and give it to the communicator.

.1.3 Direct communicator to complete notification of the a opriate parties as specified in Appendix

[

I Form 3, General Emergency Phone List g5I i dP9 ' cation) or Appendix EP-105-1, Form 4, D' dig [q'cy Phone List (Escalation or e os $dli g p ithin 15 minutes.

.MUNICATOR SHALL MAN THE NRC RED TELEPHONE ON t

ON INUOUS BASIS UNTIL THE NRC DISCONNECTS. ,

Fl, ' EP L EMERGENCY IS DECLARED WITHOUT PRIOR E. Y GIFICATIONS PROTECTIVE ACTION, RECO sdD NS MUST BE GIVEN WITH INITIAL NOTIFICATION AS INDICATED ON APPENDIX EP-105-1, FORM 1.

  • I l . .

\

l EP-105, Rev. 13 l

Page 2 of 8 MJR:kml I( 2.1.4 Contact the Plant Manager and the Shift Technical '\

Advisor, inform them of the situation, if not T already~done. ,,

2.1.5 Direct the Info Center Staff to implement EP-306, Evacuation of' e ormation Center, if not already done. Inform the staff of k the wind direction, if there is an airborne release.

2.1.6 If there is an actual or potential radiological release, implement EP-305, Site Evacuation.

2.1.7 If there has not been a radiological release, A. Evacuate all construction nnel by Direct them I t p nnel form I l l THIS WILL CALL FOR THE ASSEMBLY OF UNIT 2 PERSONNEL AT THE UPPER PARKING LOT. IF IT IS DESIRED THAT THEY LEAVE THE SITE, INFORM BECHTEL SAFETY. .

I B. Contact Operations Securit' n3 tell them of the construction evacuation or information purposes only, no action required.

C. Select the type of accountability desired for personnel in the protected area and implement the required actions below:

1. Emergency Assembly Without Accountability

- Make the following announcement J

l "THIS (IS/IS NOT) A DRILL. DESIGNATED EMERGENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITY OR ASSEMBLY AREA. ALL OTHER PERSONNEL STAND BY FOR l FURTHER ANNOUNCEMENT. THIS (IS/IS NOT) A DRILL."

I . .  !

l .

l EP-105, Rev. 13 Page 3 of 8 MJR:kml f  % l

2. Emergency Assembly With Accountability

'a. Contact the Security Team Leader.

Inform him of the selected exit point (s), that emergency assembly with accountability is going to be implemented, and to activate the Security Team (EP-208) and to perform personnel accountability in accordance with EP-110, Personnel Assembly and l Accountability. I

b. ContactsYoh Construction Security OFF-hours % and inform them tha '

personnel leaving Unit 1 will be reassembling at the Personnel Processing

/

S( N S/IS A DRILL. A GENERAL EMERGENCY RAS BEEN DECLARED. PLEASE PREPARE FOR ASSEMBLY WITH ACCOUNTABILITY.

DESIGNATED EMEF3ENCY PERSONNEL REPORT TO ASSIGNED EMERGENCY RESPONSE FACILITY OR ,

ASSEMBLY AREA. ALL OTHER UNIT ONE PERSONNEL LEAVE THE PROTECTED AREA ,

IMMEDIATELY AND REASSEMBLE AT THE PERSONNEL PROCESSING CENTER. THIS l

  • ~(IS/IS NOT) A DRILL. THIS (IS/IS NOT) A

. DRILL."

2.1.8 For OFF-hours, if not already accomplished during an -;

Alert or Site Emergency Response procedure, direct the Shift Clerk to activate the recall list using EP-291, Staffing Augmentation. If Shift Clerk is not available, this function may be assigned to any available individual.

2.1.9 Direct the activation of the Technical Support Center in accordance with EP-201, Technical Support Center (TSC) Activation, if not already activated.

2.1.10 If the EOF has not been activated earlier, during an Alert or Site Emergency Response procedure, direct a communicator to call EOF personnel (directing them to report to the ECF) using EP-279, EOF Group Phone List.

2.1.11 Assign an Operation 3 Support Center Coordinator (PO), if not already done, to direct available personnel to report to the Operations Support Center and to activate it in accordance with EP-202, Operations Support Center (OSC) Activation.

. . ._ _ __ __ ._ _ v - _ _ _ _ _ _

f EP-105, Rav'. 13

! Page 4 of 8 l MJR:kal 4

2.1.12 For samples, direct the Shift Chemistry Technician or Chemistry Sampling And Analysis Team Leader to i implement EP-230 Chemistry Sampling And Analysis
Team.

2.1.13 For in-plant surveys, direct.a Shift EP Technician or Personnel Safety Team Leader to implement EP-250, Personnel Safety Team .  ;

I 2.1.14 For field surveys when a release of gaseous i 4 radioactive material has occurred or is suspected, 7

direct Dose Assessment Team Leader.to implement EP-210, Dose Assessment Team .

i j 2.1.15 For a release at or greater than the Alert level in EP-101, Classification of Emergencies, or at the discretion of the Emergency Director, direct the

! Dose Assessment Team Leader to implement EP-210, Dose Assessment Team.

j 2.1.16 On an interim bases, direct the Shift Technical l Advisor to perform dose projections using EP-316,

! Cumulative Population Dose Calculations for Airborne

! Releases-Manual Method or EP-315 Calculation of l Offsite Doses during a Radiological Emergency using ,

RMMS in the Manual Mcde and to suggest Protective i Action Recommendations per EP-317.

l 2.1.17 For fire / damage repair direct the Maintenance Shift

, Assistant Foreman or Fire and Damage Team Leader to implement EP-260, Fire and Damage Team and/or EP-261 Damage Repair Group.

l 2.1.18 For a liquid release, implement EP-312 , Radioactive Liquid Release, if required.

! 2.1.19 For Security matters, contact Security Shift Supervision and direct implementation of EP-208,

. Security Team, unless previously done.

3.0 ACTIONS - FOLLOW-UP 3.1 Emergency Director shall:

3.1.1 Verify that the Technical Support Center, Emergency Operations Facility and the Operations Support Center have been activated.

3.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of Emergencies. If the conditions change, deescalate

- to an appropriate classification.

9

-- em . . sp* ====apenee- w-- g- ass - ~ e-- -e=++

t4 n- ~ w n- v v -*m g %vwt- t

  • w $ -

v - < - n - - v s - ~- w rr w-e m--- m-

l EP-105, Rev. 13 Page 5 of 8

MJR
kml 3.1.3 If classification is de-escalated, fill out Appendix l EP-105-1, Form 2, General Emergency De-escalation Notification Message, sign it and give it to the communicator and direct the communicator to perform notification of the appropriate parties listed in l Appendix EP-105-1, Form 4, General Emergency Phone List (Escalation or De-escalation).

er -

3.1.4 Obtain the-following information as necessary to formulate further actions:

A. Security Status from Security Team Leader

! B. Sample analysis fr'om Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader C. In plant surveys from Shift EP Technician or Personnel Safety Team Leader D. Field surveys from Shift HP Technician or Dose Assessment Team Leader

E. Dose projections and protective action recommendations from Shift Technical Advisor or l Dose Assessment Team Leader F. Fire / Damage Repair status from the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader

- G. Notification results from Communicator' 3.1.5 Discuss protective action recommendations with the Site Emergency Coordinator. ,

i

~

3.1.6 If not already performed, determine which additional I

support' personnel are necessary for emergency functions and direct the Shift Clerk or other assigned person to contact those personnel.

3.1.7 Provide site personnel with public address (PA)

speaker announcements for any major changes in plant.

emergency status, such as changing emergency action i levels. l i

,ar- tui p p m'rw a y yM - e- e- + m * -w ee

  • W- D y - .%-g _-,.*.,y y,.. y 4, --94w-, -y-.mi -,..,- 9 -

-,g, .-_, , ,.,-3,m.- - -n- - . , . , , - - , ,,.-n g9+,--

l

. .. 4 l

l EP-105, Rsv. 13 -

Page 6 of 8 MJR:kml 3.1.8 Evaluate the need and order evacuation of effceted areas as necessary.

Refer to the following procedures:

EP-303 Local Evacuation EP-305 Site Evacuation

' ~ '

EP 306 Evacuation of the'Informa' tion Center 3.1.9 Perform the following until relieved by the Site Emergency Coordinator:

A. Discuss protective action recommendations with the Dose Assessment Team Leader.

B. Provide protective action recommendations to the Pennsylvania Bureau of Radiation Protection.

C. Inform the various emergency response groups if the recovery phase organization is to be implemented.

3.2 Communicator shall:

3.2.1 Inform the Emergency Director when appropriate notifications have been made and submit completed I copy of Appendix EP-105-1, Form 4, General Emergency

~

Phone List (Initial Notification) or Appendix l EP-105-1, Form 5, (Escalation or De-escalation) for Emergency Director's signature.

l 4.0 APPENDICES (Issued as a separate document) l 4.1 EP-105-1, General Emergency Notification Forms l 4.1.1 Form 1, General Emergency Notification Message 4.1.2 Form 2, General Emergency De-escalation Notification Message 4.1.3 Form 3, General Emergency Phone List (Initial Notification) '

4.1.4 Form 4, General Emergency Phone List (Escalation or De-escalation) e + .a.+- -og; s > M m , - -- - - - - , , -

l EP-105, Rev. 13 Page 7 of 8 MJR:kml 5.0 SUPPORTING INFORMATION 5.1 The purpose of this procedure is to provide guidelines for the site response to a General Emergency.

5.2 Criteria for Use i

5.2.1 This procedure shall be implemented when an event has been classified as a General Emergency per EP-101, Classification of Emergencies, and EP-101 has been completed.

5.3 Special Equipment None 5.4 References 5.4.1 Limerick Generating Station Emergency Plan 2

5.4.2 NUREG 0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans in Support

. of Nuclear Power Plants 5.4.3 EP-101 Classification of Emerger.cies 5.4.4 EP-201 Technical Support Center (TSC) Activation 5.4.5 EP-202 Operations Support Center (OSC) Activation 5.4.6 EP-291 Staffing Augmentation 5.4.7 EP-303 Local Evacuation 5.4.8 EP-304 Partial Plant Evacuation 5.4.9 EP-305 Site Evacuation d

,.- 5.4.10 EP-306 Evacuation of the Information Center 5.4.11 EP-317 Determination of Protective Action Recommendations 5.4.12 EP-316 Cumulative Population Dose Calculations For i Airborne Releases - Manual Method '

5.4.13 EP-110 Personnel Assembly and Accountability 1

0

. .. . - .. ~ . , . . --.

- , - - mg .-w - ~ > ,_ wg- - - g-- --u -  % -

  • -& - -m

~

i

)1 EP-105, Riv. 13 Page 8 of 8

. MJR:kml EP-208 Security Team 5.4.14 5.4~.15 EP-210 Dose Assessment Team 5.4.16 EP-230 Chemistry Sampling and Analysis Team 5.4.17 EP-250 Personnel Safety Team 5.4.18 EP-260 Fire and Damage Team 5.4.19 EP-261 Damage Repair Group 5.4.20 EF-312 Radioactive Liquid Release 5.4.21 EP-279 Emergency Operations Facility (EOF) Group Phone List 5.4.22 EP-315 Calculatio'ns of Offsite Doses during a Radiological Emergency using RMMS in the Manual Mode.

O O

e 9

i

. 3862093520 s-EP-105, Appendix 1 Rev. O Page 1 of 11 1 MJR:hfz APPENDIX EP-105-1 / ,,g g GENERAL EMERGENCY NOTIFICATION FORMS g

< l FORM 1: GENERAL EMERGENCY NOTIFICATION MESSAGE l

MESSAGE: THIS (IS/IS NOT) A DRILL. THIS (IS/IS NOT) A DRILL.

This is (name), telephone number at Limerick Generating Station calling to report a General Emergency at Unit No. .

Time and date of General Emergency classification are:

, / / .

(24 Er. Clock Time) (Date)

The basic pr .

l There (HAS/HA N (A R U ti h release from e . p i

( (STABLE / IMPROVING / DEGRADING).

The protective action recommended is:

The affected area is: .

THIS (IS/IS NOT) A DRILL. THIS (IS/IS NOT) A DRILL.

  • IF A GENERAL EMERGENCY HAS BEEN DECLAdED WITHOUT PRIOR EMERGENCY CLASSIFICATION, g IDE THE RECOMMENDATION TO SHELTER WITHIN THE 2 MILE RADIUS A' IEN f3'!juMWW ND OF THE PLANT. IF PEMA & BRP ARE NOT AVAILAB c,Ui;Y Mkr! N N TO SHELTER 10 MILES FULL CIRCLE (36' EjSj r* COUNTIES.

COPY I . Emergency Director

EP-105, Appandix 1 Rev. O Page 2 of 11 MJR:hfz' APPENDIX EP-105-1 GENERAL EMERGENCY NOTIFICATION FORMS FORM 2: GENERAL EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE I

. . _- e MESSAGE: THIS"(IS/IS NOT) A DRILL. THIS (IS/IS NOT) A DRILL.

This is (name), Limerick Generating Station calling to report a change in emergency action ,.

level. The General Emergency has been (DE-ESCALATED

TO/AN UNUSUAL EVENT / ALERT / TERMINATED).

Time and date are:

, / / .

(24 Er. Clock Time) (Date) r The Plant conditions are (STABLE / IMPROVING).

THIS (IS/IS NOT) A DRILL. THIS (IS/IS NOT) A DRILL. l b

Emergency Director ,

4 1

L e s.- -

9 - -- -- a--e ,-n---

l '

1O1 z Illllllill1lIIIIllll1ll llll 1f

n. h w i vf : G deoR N

. R J NI

3. M OD

, SN p e RO A g EP

_ a PS P E 5 R 0

1

- Ill llillIl1llII l ll ll lIll P

E -

i E

_ M

_ I

_ T S T M S Ill ll

_ R I

_ O L F

_ E )

N N d

_ O O) e

_ I iN s

1 T POI U

- A 5 C YT r 0 I CA Re 1 F NC Eb

- I EI Bm P T GF Mu E O RI UN N ET N X MO e I Y EN En D C No N N LL Oh E E AA HP P G RI P P R ET e

_ A E NI l M EN c

_ E GI r

( i L  : C A 3 (

_ R E M N R Ill E O G F D E

_ I) es Fs I e ce y

_ Tt i n f

_ Ou fd c o, Nn f e n n i Or e uo EM y a g ai B r et 5 t e e rc

_ O1 r nr mn ue T e uP E BtA

. h o oP Yx c C aA ar Co t c i i P ,

n

Nr yn nt g d Ep r an anr

_ e Gp s e v vou t Aa i m l y

lib a / D oe yt s i Ln gg gm s sai

_ t Ei n! d tE na nir n

l i Nh a $

a nn ndr

_ n Nt l o of ea eaa I Oi P L Mo PM PRH SW -

e R(

m E . . . . . -

- i P a b c d e T -

- IIllllIlIll1IIIIlllIlIl Ill1

EP-105, Ap . dix 1 Rev. O Page 4 of 11 ,

APPENDIX EP-105-1 GENERAL EMERGENCY NOTIFICATION FORMS FORM 3: GENERAL EMERGENCY Pif0NE LIST (INITIAL NOTIFICATION) d Time Initiated:

1 I I I l l PERSONNEL / AGENCY TO DE NOTIFIED l Pi!ONE NUMBER l TIME I PERSON l l (Within approx. 15 Minutes) l (Circle Phone Number Used)

' l l RESPONDING l l I I I I l f. NRC Operations Center l l

' l l Bethesda, MD l l l

1 1 I Make this call last and I remain on telephone unti '

1 l )

l l l NRC disconnects l l l l l l l (Person. contacting NRC l l l

[ must be Licensed Operator) l l l l N

1 0y ________________________

X = 4 g -->w

.. g W O% Z E C': 9 Z-E a

OI I OQ r i U) 2 '

? <

O. 0 D

' %O M C.

m C C/)

F

' 1 M

e. LD x m O

-4  :

[1 j ___

_____________________ g g -

M r

I,.

M I

r -

I b

9 s

U: E y

g x

CC in a- O J A

l

, 3 ^

g 5 5-

=Z

?

m

..- -4 E C. O D b i < ~

Ef C U >F L

= O

~l U< ct c ZU

- 1 M .C E

I - M- cc E 1 F 0N 1p M C CC - DZ e- 2 C0 F Z Y M IO @

g - > MZ Mc Q U ZO

Z Z JJ OI

- 23 M << Z C.

s

$  %~ 1 b.

- - M. w

. < 53 Z- -

$- I - h3 Z U

. 23 0- L K J .. y S < m -

b =

t? M T

- Z 2 _______

h M O _

{., O A Q O y M -

~~ @ u AD .Q C to Z - 0 0 E

- Hw O v L r O= a o .Q O

, ~C > w -

n " A OD C ,,

a

~ . . , -.

MI c4> - .

2 D Oem # ' .. ' 'p :,1,, , h. 3 .y;..

u x .- I c',. , tp:

Qm a y ., .

s

,(-(gp[bf.- '

.-- p qrg ~ - --

  • yae 4 '; e ,, . *

( >x 3 x ,N! f; +pA.-

11 UO Zu w L U

.- o C 0.

.'.[.. .,'.$ ,. %,Ei!'$

k V MC ua v i

.h,JE8;(Sg; ,,5 {u.

~

- 3 OC o% & .i-
3s.f o +f,7 P u < re cme L .m e x s 4py

. -y - w L -

3

- Jc >, t -e .. v .. ".T.

F7 , - .

o

^

7 w M- L 00t M ,.t h.. -" ; . -' 'Q c

- - Zr Cu C @ C . ..y#

9-

[ C Zu tQC- m I*6'y'7.,'..4- -; ' 3, . . ?6

. e

- O -- C -a ou . W .. ' - -( #- m i U3 3 O C. 4 - ". --

%~

i O

E M U EL u O OD 0 - - [' c'I .'-

4...

f- ,

=

F -

C. C/1 U C. C Q

l F

i

. _ _ _ _ _ . . _i

-- - ~~ _ _ _ _

i

- c, a

w\, /___________________________ /

.-e .e

  • > hb 4 C 9 0 0 CC Z

@ h Q dC 0

01

$5 M C.

r0 C. W

= 1 DJ D Cf O

m j ___ _ _ _ ______ _ _ ____ _ _ _ _ __ __ _

9 M

I E-Cn E-~

g g ___

E M _

Z Z C.

O C^ w

- =2 M

- E-* 1O D I < ~

L '. U >b L C - U< CC 0

- 1 %U 33 Q

. - DJ - C3 E S. 82 85 W r-as Z

< IO c

- > MZ Cr] C Q U ZO Z . Z JJ O4 L3 G3 44 Z Q.

1 C CC - C.

C. CC MS 0

< 33 .Z- -

I WZ U Q.3 0- L w .e J .. U

< m -

G z ---

5l 86 C C G3 N

s*

OC E

N U

E v

ZC C N C 01

- C U 0 L >

Q3 I C C 01 0 J C:3 - t L E -

C C. Ci 00 W L O- L EC D E N O M@ N U

- U E C1 a 0

> x C MM. .>< C tn UO U L M a C l ** Z L 01 C M I O Ca O M t 33 L a t C D C U C v a^ va a un Ov M O

= a < C EC C O@ UE L $ -

, o N DJ - Ca L o v Ul a r

- JC t L U d W 7 a -l 4 I a 32 ~ D L D D x@ M > L

- 24 aC a L U *~ C U L 0 l C 2a -e ~ -

  • L D D D Z t O- c1 < O C. 23 I U (n O

\

A ?-

5- . .

t e  ;

=l = .- .- xi l

y

(

r .

  • . } _

1O1 z lll 1f x . h ivf G J eor N p

p R

7H e

J NI OD SN RO c

A g EP a PS P E 5 R 0

1

- lll P

E E e M t I a T D

/

e m

i S T T M S 1ll

=

R I

- O L F

E )

N N d O O) e I l i N s

- 1 T PO U

- - A I 5 C YT r

- 0 I CA Re 1 F NC Eb

- I EI Dm P T GF Mu E O RI UN N ET N X MO e I Y EN En D C No N N LL Oh -

E E AA I I P P G RI P P R ET e A E NI l M

E

$N c GI r

( i L  :

C A 3 (

R r E M o N R lll t

E O c G F D e E r I) i Fs D I e Tt y Ou c Nn n i

e EM g D r 5 e O1 m T E Yx Co

Nr .

d e

Ep Gp t Aa  :  :

a / y y i

Ln B B t Ei i Nh d d n Nt e e

- I Oi t i SW e f e R( l i m E p r --

i P m e T o V lll C

I

_ - j _

U!1 M m e AW!EEFa# TMNN

=c 0

7 EP-105, Ap, din 1 DE Rev. 0

[ Page 8 of 11 ,

'h MJR:hfz 15 APPENDIX EP-105-1 a

M GENERAL EMERGENCY NOTIFICATION FORMS 00 3 FORM 4: GENERAL EMERGENCY Pi!ONE LIST jq (ESCALATION OR DE-ESCALATION)

  1. Time Initiated: ' - ' f

!I I I I I I i l PERSONNEL / AGENCY TO BE NOTIFIED l PIIONE NUMBER l TIME l PERSON l J l (Within approx. 15 Minutes) l (Circle Phone Number Used) l l RESPONDING l t

~ ~ -

i Plant Manager l l

' ~

l a. l l c I I I i l l l 2 I l l 5 I I I

{ l i I 4 I I l lSE I I l f I I I

-7 I I I u I I l

  • b. Load Dis tcher I l l E I .I
} l c. Pennsylvania Bureau of l l

,Q l Radiation Protection, I I y l  !!arrisburg, PA l l 2 I I I Z j l i I

-? f I d. NRC Operations Center l l e- l Bethesda, MD l l

,[ l l l l Make this call last and l l j S l remain on telephone until l l I 7 i NRC disconnects l _. l l 2 I I i l t

- _- l (Person contacting NRC l l 1 l l must be Licensed Operator) l l l l

?

=

ll i  ;'

J J

101 z lllIlIllIiIIIIlIlIIIlII 1f n . h i vf  : G eor N R J NI s

p 9H OD SN p e RO A g EP a PS P E 5 R 0

1

- IIl IlllllIlIIIiIlIIIl1i P

E E

M I

T S T M E IllIlll -

R I O L)

F N EO )

N NI d ,

O OT e I l i A s 1 T PL U

- A A

  • 5 C YC r 0 I CS Re 1 P NE Eb

- I E - Bm P T GE Mu E O RD UN N E N X MR e I Y EO En D C No N N LN Oh E E AO  !

l P P G RI P P R ET e A B iA 1

l M EL c E GA r C i L :S C A 4E (

R (

E M

N R Ill Illil i E O ~ n G F D o E r i -

I) e t Fs t s a I e f e m Tt ai r Ou c o Nn dn f i ee n EM t g I D ca -

5 a/ c O1 tl : i T ned l

. one b Yx cni u Co of P

Nr esi

_ d Ep brt -

_ e Gp eo s

_ t Aa opn r r

_ a / t e u i Ln en g o sve a

_ t Ei h i Nh eoe n n Nt ibb a 4 I Oi ca M 2 SW n e e R( eev m E gh a .

i P Ath e

_ T 1ll1llJllIlII IiIIIl1l l

f EP-105, Apt Jix 1 .*

Rev. 0 ..

Page 10 of 11 ,

MJR:hfz APPENDIX EP-105-1 GENERAL EMERGENCY NOTIFICATION FORMS FORM 4: G$NERAL EMERGENCY PIIONE LIST (ESCALATION OR DE-ESCA' ATION) M Time Initiated:

I I I I l l PERSONNEL / AGENCY TO DE NOTIFIED l PHONE NUMBER I TIME l ' PERSON I l (Within approx. 15 Minutes) l (Circle Phone Number Used) l l RESPONDING I l l l l l f. Site Emergency Planning i I l Coordinator l l l

l l l

1 l l Alternates l l l Director - Emergency l l l Preparedness l l l Roberta Kankus l l I

I I I -

1 I I l I

I l l l l

l l i I I I i

l' l l I I

l g. Montgomery County Office l l y

l Mana ment nc l l '

I l i. Chester County Emergency Services I

l Il l  ;

I l l ,

s

e '

i 1 J

1O1 z \

1i

. h

_ .f  :

, G

_ sOR N rR J NI e 1H OD p 1 SN p RO A e EP g PS

, a E 5 P R 0

1 l

P E

E e M t I a T D

/

e i

m e

T S T M S l R I O L)

F N EO )

i l NI d O 0T e I iA f

s 1 T PL U

- A A 5 C YC r 0 I CS Re 1 F NE Eb

- I E- Bm P T GE Mu E O RD UN N E N X MR e

  • I Y EO En D C l l o N N LN Oh E E AO  !

l P P G RI P P i l ET e A E h l

A

  • l M EL d E GA kr C i L :S C A 4E (

R (

r, E M o

_ N R l1

~ t d O F D E

c e

I) r .

.i .

, Fs D I e _

_ Tt y Ou c

Nn n .

,i EM e g

B r 5 e O1 m _

T .

E Yx Co Nr d Ep e Gp t Aa  :  :

a / y y i

Ln B B t

i E n

t i d d I

l e e t i e G e f l i m E p r i P m e T l C

o V

~ .

e r

, l1lllll