Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207M804 + (01:19:50, 7 December 2024)
- ML20207M805 + (01:19:50, 7 December 2024)
- ML20207M803 + (01:19:51, 7 December 2024)
- 05000260/LER-1986-015-02, :on 861209,Trains a & C of Standby Gas Treatment Sys & Train a of Control Room Emergency Ventilation Actuated.Caused by Failed Coil in Relay.Coil Replaced & Safety Sys Reset + (01:19:53, 7 December 2024)
- PY-CEI-NRR-2367, Forwards Rev 26 to Perry Nuclear Power Plant Security Plan, Per 10CFR50.54(p)(2).Util Determined That Changes Do Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 + (01:19:54, 7 December 2024)
- ML20207M795 + (01:19:55, 7 December 2024)
- ML20207M794 + (01:19:55, 7 December 2024)
- ML20207M793 + (01:19:56, 7 December 2024)
- ST-HL-AE-1867, Forwards Justification for Proposed Tech Specs Identified for Further Comment or Resolution During 861117-21 Site Visit.Pending NRC Agreement,Revs Will Be Included in Future FSAR or Fire Hazards Analysis Rept Amend + (01:19:57, 7 December 2024)
- ML20207M783 + (01:19:59, 7 December 2024)
- ML20207M788 + (01:19:59, 7 December 2024)
- ML20207M780 + (01:20:00, 7 December 2024)
- ML20207M777 + (01:20:01, 7 December 2024)
- ML20207M775 + (01:20:02, 7 December 2024)
- ML20207M773 + (01:20:07, 7 December 2024)
- 05000374/LER-1986-018-07, :on 861209,RCIC Steam Line High Flow Isolation Switch PDS-2E31-N013BB Found Nonfunctional.Caused by Torn Diaphragm Inside Switch.New Static O-Ring Differential Pressure Switch Certified & Installed + (01:20:09, 7 December 2024)
- ML20207M769 + (01:20:10, 7 December 2024)
- ML20207M770 + (01:20:10, 7 December 2024)
- ST-HL-AE-1868, Forwards Updated Status of Items That Will Not Be Completed at Fuel Load.Remaining Const Will Be Limited to Planned Retrofits Which Will Be Controlled to Avoid Interfering W/ Safe Operation + (01:20:11, 7 December 2024)
- 05000324/LER-1986-026-01, :on 861211,fire Watches Performed 15 Minutes Late.Caused by Restricted Access to Affected Fire Watch Areas Due to Radiological Spill Onto 50-ft Elevation Floor. Fire Watches Conducted & Personnel Disciplined + (01:20:13, 7 December 2024)
- ML20207M764 + (01:20:14, 7 December 2024)
- ML20207M761 + (01:20:15, 7 December 2024)
- ML20207M762 + (01:20:15, 7 December 2024)
- ML20207M759 + (01:20:16, 7 December 2024)
- ML20207M760 + (01:20:16, 7 December 2024)
- ML20207M756 + (01:20:17, 7 December 2024)
- ML20207M754 + (01:20:19, 7 December 2024)
- ML20207M753 + (01:20:19, 7 December 2024)
- ML20207M750 + (01:20:20, 7 December 2024)
- 2CAN029912, Requests Enforcement Discretion from Requirements of TS Table 3.3-1,Action 2 to Allow Startup & Operation of Unit While Exigent TS Is Processed Re Channel D Detector.Encl Documents Util Position Discussed with NRC on 990223 + (01:20:24, 7 December 2024)
- ML20207M743 + (01:20:27, 7 December 2024)
- ML20207M733 + (01:20:31, 7 December 2024)
- ML20207M731 + (01:20:32, 7 December 2024)
- ML20207M729 + (01:20:32, 7 December 2024)
- 3F0187-08, Monthly Operating Rept for Dec 1986 + (01:20:33, 7 December 2024)
- ML20207M726 + (01:20:33, 7 December 2024)
- ML20207M725 + (01:20:34, 7 December 2024)
- ML20207M720 + (01:20:35, 7 December 2024)
- PNO-IV-87-001, Correcting PNO-IV-86-001:on 870108,reactor Tripped Automatically on Safety Injection Actuation.Caused When Technician Calibr Main Steam Pressure Transmitters & Isolated Wrong Transmitter + (01:20:35, 7 December 2024)
- IR 05000327/1998302 + (01:21:27, 7 December 2024)
- ML20207M713 + (01:21:28, 7 December 2024)
- ML20207M711 + (01:21:29, 7 December 2024)
- ML20207M708 + (01:21:33, 7 December 2024)
- ML20207M706 + (01:21:34, 7 December 2024)
- 05000245/LER-1986-028-01, :on 861203,routine Surveillance Revealed Three Out of Four Pressure Switches Failed to Meet Tech Spec Setpoint Requirements.Caused by Problems W/Bourdon Tube Pressure Switches.Switches Reset & Tested + (01:21:35, 7 December 2024)
- ML20207M704 + (01:21:36, 7 December 2024)
- 05000282/LER-1986-010-01, :on 861212,two Source Range Channels Failed While Troubleshooting Turbine E-H Control Sys.Caused by Mgt Deficiency in Control of Test Equipment.Custom Cables for Use W/Recorder Ordered + (01:21:38, 7 December 2024)
- ML20207M695 + (01:21:39, 7 December 2024)
- ML20207M692 + (01:21:40, 7 December 2024)
- ML20207M694 + (01:21:40, 7 December 2024)
- ML20207M689 + (01:21:41, 7 December 2024)
- ML20207M674 + (01:21:42, 7 December 2024)