OPERATING D ATA REPORT DOCKET NO.
50-302 DATE 1/2/87 COMPLETED 8Y D. CrahAm TELEPHONE _(904) 795-3802 OPERATING STATUS f
- 1. Unit Name:
Crystal River Unit 3 Notes
- 2. Reporting Period:
12/1/86-12/31/86
- 3. Licensed Thermal Power (MWt):
2544
- 4. Nameplate Rating (Gross MWe):
890
- 5. Design Electrical Rating (Net MWe): 825 ti. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maximum Dependable Capacity (Net MWe):
821 j
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since I.ast Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any: N/A This Month Yr.-to-Date Cumulative 4
- 11. Hours In Reporting Period 744 8760 85944
- 12. Number Of Hours Reactor Was Critical 169.3 3691.4 53992.4 g
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3 i
- 14. Hours Generator On-Line 163.6 3661.3 52752.1 I
- 15. Unit Reserve Shutdown Hours 0
0 0.
- 16. Gross Thermal Energy Generated (MWH) 153141 8135072 118603937 i
- 17. Gross Electrical Energy Generated (MWH) 48567 2798909 40555211
- 18. Net Electrical Energy Generated (MWH) 42622 2653212 38512798
- 19. Unit Service Factor 22.07.
41.87.
61.47.
- 20. Unit Availability Factor 22.07.
41.87.
61.47.
- 21. Unit Capacity Factor (Using MDC Net) 7.07.
36.9%
56.17.
- 22. Unit Capacity Factor (Using DER Net) 6.97.
36.77.
54.37.
- 23. Unit Forced Outage Rate 78.07.
57.17.
24.07.
(
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 O
COMMERCIAL OPERATION 3/13/77 s
8701130265 861231 PDR ADOCK 050003O L.
(9/77)
\\
R PDR
AVERAGE DAILY UNIT POWER LEVEL
{
DOCKET NO.
50-302 s
UNIT FLCRP-3 D/.TE 1/2/87 COMPLETED By D. Graham TELEPHONE (904)795-3802 MONTH 12/86 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 lg 3
19 4
20 5
21 6
22 e
(
)
I 23 8
9 25 165 442 10 26 11 27 361 109 12 28 13 29 14 30 189 15 31 242 16 v
INSTRUCTIONS On this format, list the average daily unit power lesel in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(W771
f))
s L
%)
DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 1/2/87 COMPLETED BY D-Crnham REPORT MONTig 12/86 TELEPHONE ( And 7os tan?
[s5 Ek Licensee P,
Cause & Corrective 3?
3 No.
Date g
3g 4
.3 Event g3 3
Action to H
f E
j 53 g Report #
mO U
Prevent Recurrence g
6 86-31 861122 F
580.4 A
4 NA CJ HTEXCH Primary coolant leak into the Nuclear Services Cooling System via a failure in the "A" letdown cooler.
Replacing the letdown cooler 86-32 861225 F
0.0 B
5 NA HH MECFUN Reduced power to 25% to troubleshoot feedwater pump control problems.
86-33 861225 y
0.0 B
5 NA HH MECFUN Operated at 40% to test feedwater Pump 86-34 861227 F
0.0 B
5 NA HH MECFUN Reduced power to 30% to troubleshoot feedwater pump control problems.
1 I
86-35 861231 F
0.0 B
5 NA HH MECFUN Operated at 40% to test feedwater Pump l
l 2
3 4
F: Forced Reason:
Plet hod Exhibit G. instructions S: Scheduled A Equiprnent Failure (Explain) for Preparation of Data B Maintenance of Test N*,Zfscr.,
Entry Sheets for Licensee C-Refueling 3-Auto scram Event Report (LER) File (NURI.G-D Regulatory Restriction 4-Continued 0161)
E-Operator Training & License Examination 5-Reduced Load F-Adrninist rat'ive 9-Other 5
l G Operational Error (Explain)
Exhibit 1 - Same Source N/77)
II Other (Explain)
MONTHLY OPERATIONAL
SUMMARY
STATEMENT
-O DOCKET NO. 50-302 UNIT FLCRP-3 l
DATE 1/2/87 COMPLETED BY S.
Stewart TELEPHONE (904) 795-3802 MONTH 12/86
SUMMARY
STATEMENT:
Crystal River Unit 3 was off-line for 25 days to replace a letdown cooler.
For the remainder of the month, the plant operated at reduced load to troubleshoot main feedwater pump control problems.
O
+
P I
O l
l 1
-=.. -_,._.--
- *
- i',
o og g
O o.
S:
s Florida Power COOPORATION January 9,1987 3F0187-08 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 December 1986 Monthly Operating Report.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely,
[
' %IAyOD'\\
E. C. Simpson Di r ectt. Nuclear Operations Enginee ig and Licensing AEF/feb Attachn.
xc: Dr. J. Nelson Grace Regional Administrator, Region II Mr. T. F. Stetka Resident Inspector S