Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-III-80-160, on 800827,licensee Notified Region 3 That Unit Will Be Taken to Cold Shutdown for Replacement of Leaking Control Rod Drive Seals.Shutdown Is Expected to Last Approx Five Days + (15:25:00, 6 January 2025)
- PNO-III-80-159, on 800826,while Operating at 88% Power,Plant Was Manually Tripped Because of Loss of Condensate & Feedwater Pumps.Recovery Took 2.5-h to Regain Onscale Readings of Steam Generator Levels + (15:25:02, 6 January 2025)
- ML18045A767 + (15:25:03, 6 January 2025)
- ML18045A761 + (15:25:04, 6 January 2025)
- PNO-III-80-175, on 800912,wildcat Strike Was Initiated. Pickets at Main Gate Are Being Honored by Operations, Maint & Const Personnel.Plant Will Continue to Operate Staffed by Mgt Personnel + (15:25:06, 6 January 2025)
- ML18045A758 + (15:25:07, 6 January 2025)
- ML18045A756 + (15:25:08, 6 January 2025)
- ML18045A755 + (15:25:09, 6 January 2025)
- PNO-III-80-144, on 800901,licensee Reported Unplanned Release of Radioactive Gas.Source of Release Was Failed Rupture Disc on Waste Gas Compressor.Amount Released Is Small Fraction of Tech Spec Limits + (15:25:11, 6 January 2025)
- PNO-III-80-140A, licensee Analysis Indicates That All ECCS Pumps on Affected Line Would Have Been Subj to Air Binding Because Containment Sump Valve Cv 3030 Had Been Improperly Positioned to Open Position + (15:25:13, 6 January 2025)
- ML18045A744 + (15:25:14, 6 January 2025)
- ML18045A746 + (15:25:14, 6 January 2025)
- 05000255/LER-1980-035-03, /03L-0:on 800830,during Return to Svc After Shutdown,Leakage Discovered Through Pressure Relief Valve. Caused by Loose Spring Guide within Solenoid Assembly Valve Due to Failed Brazed Joint.Guide Brazed Back Onto Plate + (15:25:16, 6 January 2025)
- 05000255/LER-1980-035, Forwards LER 80-035/03L-0 + (15:25:18, 6 January 2025)
- ML18045A740 + (15:25:19, 6 January 2025)
- ML18045A739 + (15:25:20, 6 January 2025)
- ML18045A716 + (15:25:20, 6 January 2025)
- PMNS20180162, Notice of Meeting with GE Hitachi Nuclear Energy (GEH) Regarding Open Items Associated with the GEH Advanced Boiling Water Reactor (ABWR) Design Certification Renewal Application + (15:25:28, 6 January 2025)
- ML18045A706 + (15:25:29, 6 January 2025)
- ML18045A705 + (15:25:30, 6 January 2025)
- ML18045A683 + (15:25:30, 6 January 2025)
- ML18045A677 + (15:25:34, 6 January 2025)
- ML18045A675 + (15:25:36, 6 January 2025)
- 05000255/LER-1980-034-03, /03L-0:on 800826,during Pretest Review of Check Valve:Inservice Insp Surveillance,Procedures Required Closing & Reopening of Sirw Tank Outlet Valves.Caused by Inadequate Procedures.Procedures Revised + (15:25:37, 6 January 2025)
- 05000255/LER-1980-034, Forwards LER 80-034/03L-0 + (15:25:39, 6 January 2025)
- 05000255/LER-1980-033-01, /01T-0:on 800911 During Control Rod Exercising,Rod 31 Was Misaligned.Caused by Rod Insertion Length.Procedures Revised to Lessen Insertion & Remain within Tech Spec Requirements + (15:25:41, 6 January 2025)
- IR 05000255/1980013 + (15:25:44, 6 January 2025)
- ML18045A662 + (15:25:45, 6 January 2025)
- ML18045A659 + (15:25:46, 6 January 2025)
- ML18045A657 + (15:25:46, 6 January 2025)
- ML18045A656 + (15:25:47, 6 January 2025)
- ML18045A655 + (15:25:48, 6 January 2025)
- ML18045A654 + (15:25:49, 6 January 2025)
- ML18045A653 + (15:25:50, 6 January 2025)
- ML18045A652 + (15:25:51, 6 January 2025)
- ML18045A649 + (15:25:52, 6 January 2025)
- HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 1 + (15:25:53, 6 January 2025)
- IR 05000255/1980011 + (15:25:54, 6 January 2025)
- ML18045A645 + (15:25:56, 6 January 2025)
- 05000255/LER-1980-032-03, /03L-0:on 800826,primary Data Logger Ceased Performing Control Rod Scans & Secondary Data Logger Typer Became Stuck.Cause Unknown.Failure Corrected by Resetting + (15:25:57, 6 January 2025)
- 05000255/LER-1980-031-01, /01T-0:on 800826,group 1 Control Rods Withdrew 121 Inches Which Resulted in Unplanned Reactivity Insertion. Caused by Loss of Both Primary & Secondary Data Loggers. Loggers Restored & Control Rods Reinserted + (15:25:59, 6 January 2025)
- ML18045A640 + (15:26:00, 6 January 2025)
- ML18045A639 + (15:26:02, 6 January 2025)
- ML18045A638 + (15:26:03, 6 January 2025)
- 05000255/LER-1980-027-01, During Venting of Quench Tank to Waste Gas Surge Tank,Gaseous Release Occurred W/O 15 Day Min Holdup.Caused by Leaking Isolation Valve & Valve Pin Disassembly.Pin Replaced + (15:26:05, 6 January 2025)
- 05000255/LER-1980-027, Forwards Updated LER 80-027/01X-1 + (15:26:06, 6 January 2025)
- ML18045A633 + (15:26:08, 6 January 2025)
- ML18045A634 + (15:26:08, 6 January 2025)
- ML18045A632 + (15:26:09, 6 January 2025)
- ML18045A631 + (15:26:09, 6 January 2025)
- ML18045A630 + (15:26:10, 6 January 2025)