Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102B616 + (05:31:19, 6 January 2025)
- ML18102B614 + (05:31:22, 6 January 2025)
- IR 05000272/1997009 + (05:31:23, 6 January 2025)
- ML18102B611 + (05:31:25, 6 January 2025)
- ML18102B610 + (05:31:26, 6 January 2025)
- 05000311/LER-1997-012-03, :on 970907,declared Reactor Coolant Loop 24 Overtemperature Differential Temp Inoperable Due to Differential Temp Being Lower than Acceptable.Returned Loop 23 Pressure Instrumentation to Service + (05:31:29, 6 January 2025)
- ML18102B608 + (05:31:31, 6 January 2025)
- LR-N970627, Application for Amend to License DPR-70,changing TS for LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys + (05:31:32, 6 January 2025)
- LR-N970645, Provides Current Status of Actions Implemented in Response to NRC Readiness Assessment Team Insp Rept,Conducted 970609- 23 & 0709-11.Commitment Matrix Re Closure of Insp,Encl + (05:31:35, 6 January 2025)
- 05000311/LER-1997-013-01, :on 970902,unplanned Entry Into TS 3.0.3 Was Noted Due to Two Inoperable Pressurizer Level Channels. Caused by Error in RCS P&ID Drawing.Pressurizer Channel I Was Restored within Six Minutes of Event + (05:31:38, 6 January 2025)
- IR 05000272/1997014 + (05:31:40, 6 January 2025)
- 05000311/LER-1997-011-01, :on 970902,improper Scheduling of Staggered Surveillance Testing Was Noted.Caused by Personnel Error. Personnel Involved Have Been Held Accountable IAW Disciplinary Policies & Addl Training Provided + (05:31:42, 6 January 2025)
- LR-N970649, Special Rept 97-02:on 970909,isolation of Fire Protection Water to Plant Auxiliary Bldgs & Containments Occurred Due to Closure of Valves 1PF186 & 1PF187.Valves Opened on 970916 & Locally Verified Open by Loss Prevention Personnel + (05:31:43, 6 January 2025)
- ML18102B599 + (05:31:46, 6 January 2025)
- LR-N970644, Submits Response to Violations Noted in Insp Repts 50-272/97-12 & 50-311/97-12.Corrective Actions:Util Revising Commitment to Implement Rev & Training on Procedure Changes from 970930 to 971114 + (05:31:48, 6 January 2025)
- ML18102B597 + (05:31:48, 6 January 2025)
- LR-N970625, Submits Startup Repts for Salem Unit 1 Cycles 9 & 10 & Salem Unit 2 Cycles 6 & 7.Summary Rept of Plant Startup & Power Escalation Testing for Cycles Generated & Provided as Attachment 1 to Ltr + (05:31:51, 6 January 2025)
- ML18102B592 + (05:31:54, 6 January 2025)
- ML18102B591 + (05:31:55, 6 January 2025)
- IR 05000272/1997015 + (05:31:59, 6 January 2025)
- ML18102B588 + (05:32:01, 6 January 2025)
- ML18102B587 + (05:32:02, 6 January 2025)
- ML18102B586 + (05:32:03, 6 January 2025)
- 05000272/LER-1997-010-01, :on 970819,position Indication Sys Were Shutdown as Required by Ts.Caused by Deficiencies in Design, Mfg Const/Installation.Successfully Recalibrated Rod Position Indication Sys + (05:32:05, 6 January 2025)
- LR-N970620, Monthly Operating Rept for Aug 1997 for Salem Unit 1.W/ + (05:32:07, 6 January 2025)
- LR-N970621, Monthly Operating Rept for Aug 1997 for Salem,Unit 2 + (05:32:09, 6 January 2025)
- IR 05000272/1997005 + (05:32:14, 6 January 2025)
- IR 05000272/1997016 + (05:32:39, 6 January 2025)
- ML18102B578 + (05:32:41, 6 January 2025)
- ML18102B576 + (05:32:42, 6 January 2025)
- IR 05000272/1997002 + (05:32:43, 6 January 2025)
- LR-N970542, Forwards Response to NRC Re Violations Noted in Insp Repts 50-272/97-14 & 50-311/97-14 on 970622-0726. Corrective Actions:On 970702 Follow Up Test Was Performed Satisfactorily + (05:32:45, 6 January 2025)
- ML18102B573 + (05:32:48, 6 January 2025)
- LR-N970566, Requests That 13 Listed Candidates Take PWR Gfes of Operator Licensing Exam to Be Administered 971008.All Candidates Are Enrolled in Sngs SRO & RO Initial License Training Program + (05:32:49, 6 January 2025)
- 05000272/LER-1995-012, :on 761211,adequacy of Turbine Driven Auxiliary FW Pump Encls Occurred.Caused by Inadequate Verification of Assumptions in Calculations Performed to Evaluate Previously Identified.Calculation Assumptions Reviewed + (05:32:54, 6 January 2025)
- ML18102B567 + (05:32:56, 6 January 2025)
- IR 05000311/1997008 + (05:32:58, 6 January 2025)
- IR 05000311/1997080 + (05:33:00, 6 January 2025)
- IR 05000272/1997012 + (05:33:02, 6 January 2025)
- LR-N970540, Forwards Response to 970610 RAI Re Utils Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. Validated Results Re Valve Susceptability to Pressure Locking Thermal Binding,Provided + (05:33:03, 6 January 2025)
- ML18102B557 + (05:33:05, 6 January 2025)
- LR-N970522, Application for Amends to Licenses DPR-70 & DPR-75,providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, to State That CCW Pumps Required to Be Operable to Meet LCO + (05:33:06, 6 January 2025)
- ML18102B554 + (05:33:09, 6 January 2025)
- LR-N970539, Forwards Salem Generating Station Semi-Annual Radioactive Effluent Release Rept RERR-42. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Plant for Period Jan-June 1997 + (05:34:13, 6 January 2025)
- LR-N970550, Forwards Proprietary TR WCAP-14672, Conditional Extension of Rod Misalignment TS for Salem Units 1 & 2, in Support of Technical Evaluation of Request for Change to TS Re Movable Control Assemblies & Position Indication Sys.W/O TR + (05:34:15, 6 January 2025)
- ML18102B550 + (05:34:19, 6 January 2025)
- ML18102B549 + (05:34:20, 6 January 2025)
- ML18102B547 + (05:34:21, 6 January 2025)
- ML18102B546 + (05:34:22, 6 January 2025)
- LR-N970561, Forwards non-proprietary TR WCAP-14963, Conditional Extension of Rod Misalignment TS for Salem Units 1 & 2, Re Exigent Request for Change to TS Concerning Movable Control Assemblies & Position Indication Sys + (05:34:23, 6 January 2025)
- LR-N970509, Forwards Summary of CR Drop Testing for Salem Unit 2 Which Includes BOC & EOC Average Assembly Burn Up Distributions & Supplementary Info as Supplemental Response to Bulletin 96-001.Unit 2 CRs Continue to Maintain Operability + (05:34:25, 6 January 2025)