Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000311/LER-1998-015-01, :on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With + (05:07:00, 6 January 2025)
- IR 05000272/1998012 + (05:07:09, 6 January 2025)
- ML18106B067 + (05:07:10, 6 January 2025)
- ML18106B065 + (05:07:11, 6 January 2025)
- ML18106B064 + (05:07:12, 6 January 2025)
- LR-N990069, Application for Amends to Licenses DPR-70 & DPR-75, Respectively.Proposed Amend Modifies ECCS Subsystems Surveillance Requirement 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing + (05:07:13, 6 January 2025)
- LR-N980155, Forwards Addl Rev to SR 4.8.1.1.2.f & Change to Definition of Standby Conditions Proposed in 960925 Submittal Re EDG Testing + (05:07:15, 6 January 2025)
- ML18106B061 + (05:07:15, 6 January 2025)
- LR-N990055, Revises 981019 Request to Change QA Program for Hope Creek & Salem Generating Stations,In Response to NRC 981218 Rrai. Details Re Revised Proposal & Responses to NRC Questions, Including Proposed UFSAR Changes for Plants Encl + (05:07:22, 6 January 2025)
- LR-N99-0080, Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With + (05:07:24, 6 January 2025)
- LR-N99-0081, Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With + (05:07:26, 6 January 2025)
- ML18106B055 + (05:07:27, 6 January 2025)
- ML18106B054 + (05:07:28, 6 January 2025)
- ML18106B053 + (05:07:29, 6 January 2025)
- NL-18-0506, Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test + (05:07:30, 6 January 2025)
- LR-N990056, Application for Amends to Licenses DPR-70 & DPR-75,revising Max Permissible Enrichment of Stored New Fuel Described in TS Section 5.6.1.1.Rept Entitled, Criticality Analysis of Salem Units 1 & 2 Fresh Fuel Racks, Encl + (05:07:31, 6 January 2025)
- 05000311/LER-1998-007, :on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With + (05:07:37, 6 January 2025)
- ML18106B047 + (05:07:38, 6 January 2025)
- PNO-I-99-008, on 990203,determined That Computer Sys Supporting Overhead Annunciators in CR Had Malfunctioned. Mishap Occurred During Preventive Maint on Annunciator Computer Sys,Which Involves Two Computer Processors + (05:07:40, 6 January 2025)
- ML18106B044 + (05:07:41, 6 January 2025)
- LR-N990049, Provides Revised TS Bases Pages for Units 1 & 2 Tech Specs. Bases Section Affected 3/4.1.2,boration Sys.Revised Bases Pages Reviewed Through 10CFR50.59 Process + (05:07:42, 6 January 2025)
- ML18106B043 + (05:07:42, 6 January 2025)
- 05000311/LER-1998-016, :on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With + (05:07:49, 6 January 2025)
- LR-N990022, Discusses Evaluation of part-length CRDM Housing Weld Crack of Prairie Island,Unit 2.Conclusions in WCAP-15126 Support Return to Normal Plant Operation & Normal RCS Leakage Monitoring + (05:07:50, 6 January 2025)
- ML18106B031 + (05:07:52, 6 January 2025)
- ML18106B029 + (05:07:53, 6 January 2025)
- ML18106B028 + (05:07:54, 6 January 2025)
- LR-N99-0007, Monthly Operating Rept for Dec 1998 for Salem Unit 1.With + (05:07:55, 6 January 2025)
- LR-N99-0008, Monthly Operating Rept for Dec 1998 for Salem Unit 2.With + (05:08:00, 6 January 2025)
- ML18106B024 + (05:08:05, 6 January 2025)
- LR-N990005, Application for Amend to License DPR-70,proposing one-time Changes to Certain Unit 1 TS Surveillance Requirements for Fuel Cycle 13,currently Scheduled to Begin on 990918 + (05:08:06, 6 January 2025)
- LR-N990006, Documents Changes Agreed to Between Util & NRC Re 971024 Request for License Amend to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Revs to Inserts as Originally Submitted in Encl + (05:08:11, 6 January 2025)
- LR-N980601, Submits List of Fourteen Changes to Be Incorporated Into Salem,Unit 1 Inservice Insp Program as Rev 1B.Rev Deletes Requirement That Program Be Revised at End of Each Insp Period as Stated + (05:08:13, 6 January 2025)
- LR-N980577, Informs That 10CFR50.59 SE Is Being Performed to Incorporate Verification of Seismic Adequacy of Sfpcs Using SQUG GIP Methodology Into Salem Ufsar,Per 980616 Meeting with NRC Re Status of Sfpcs Upgrade + (05:08:15, 6 January 2025)
- ML18106B018 + (05:08:17, 6 January 2025)
- ML18106B017 + (05:08:19, 6 January 2025)
- PNO-I-98-006, on 980218,util Commenced Heat Up & Mode 4 Entered.Nrc Inspectors Onsight for Readiness Assessment Team Insp Observed Heat Up Activities + (05:08:22, 6 January 2025)
- PNO-I-98-012, on 980407,reactor Went Critical.Nrc Inspectors Observed Approach to Criticality.Util Issued Press Release + (05:08:24, 6 January 2025)
- LR-N980600, Forwards Rev 1 to Form NIS-1 Owners Data Rept for ISI as Required by Provisions of ASME Code Rules, Incorporating Listed Changes + (05:08:25, 6 January 2025)
- ML18106B013 + (05:08:25, 6 January 2025)
- 05000272/LER-1997-001, :on 970215,failure to Perform TS Surveillance of Component Cooling Water Sys Check Valves Occurred.Caused by Inadequate Communication Between EOP Group & IST Reviewers.Procedure Revised.With + (05:08:28, 6 January 2025)
- IR 05000272/1998011 + (05:08:34, 6 January 2025)
- ML18106B006 + (05:08:35, 6 January 2025)
- ML18106B004 + (05:08:36, 6 January 2025)
- LR-N980581, Responds to NRC 981102 & 24 Telcons Re Util Proposed Amend to Modify TS 3/4.7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Licensee Will Revise Proposed License Amend with Agreed Changes,Following Resolution of RAI + (05:08:38, 6 January 2025)
- LR-N980566, Withdraws 970501 Request for Change to Ts,Adding New TS 3/4.7.11, Switchgear & Penetration Area Ventilation Sys + (05:08:40, 6 January 2025)
- ML18106A999 + (05:08:45, 6 January 2025)
- TAC:M98625 + (05:08:46, 6 January 2025)
- ML18106A997 + (05:08:47, 6 January 2025)
- ML18106A995 + (05:08:48, 6 January 2025)
- ML18106A994 + (05:08:49, 6 January 2025)