Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18138A264 + (02:33:35, 6 January 2025)
- ML18138A263 + (02:33:36, 6 January 2025)
- ML18138A262 + (02:33:36, 6 January 2025)
- ML18138A261 + (02:33:37, 6 January 2025)
- ML18138A259 + (02:33:38, 6 January 2025)
- ML18138A260 + (02:33:38, 6 January 2025)
- ML18138A256 + (02:33:39, 6 January 2025)
- ML18138A253 + (02:33:41, 6 January 2025)
- ML18138A249 + (02:33:42, 6 January 2025)
- PMNS20180630, Pre-Submittal Meeting for License Amendment Request Related to Leading Edge Flowmeter Operational Status + (02:33:43, 6 January 2025)
- ML18138A236 + (02:33:44, 6 January 2025)
- ML18138A239 + (02:33:44, 6 January 2025)
- CNL-18-003, Application to Revise Watts Bar Nuclear Plant Unit 2 Technical Specifications for Use of voltage-based Alternate Repair Criteria in Accordance with Generic Letter 95-05 (391-WBN2-TS-17-30) + (02:33:46, 6 January 2025)
- ML18138A230 + (02:33:47, 6 January 2025)
- 05000265/LER-2018-001, Two Main Steam Isolation Valves (Msivs) Closure Times Exceeded + (02:33:48, 6 January 2025)
- NRC-18-0032, Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control + (02:33:49, 6 January 2025)
- RBG-47867, Response to License Renewal Application NRC Request for Additional Information RAI 3.2.2.2-1a Supplement + (02:33:50, 6 January 2025)
- ML18138A143 + (02:33:51, 6 January 2025)
- ML18138A141 + (02:33:51, 6 January 2025)
- ML18138A140 + (02:33:52, 6 January 2025)
- ML18138A139 + (02:33:53, 6 January 2025)
- ML18138A138 + (02:33:54, 6 January 2025)
- ML18138A137 + (02:33:55, 6 January 2025)
- ML18138A136 + (02:33:56, 6 January 2025)
- ML18138A135 + (02:33:56, 6 January 2025)
- ML18138A134 + (02:33:57, 6 January 2025)
- ML18138A128 + (02:33:58, 6 January 2025)
- ML18138A111 + (02:33:58, 6 January 2025)
- ML18138A110 + (02:33:59, 6 January 2025)
- ML18138A094 + (02:34:00, 6 January 2025)
- ML18138A093 + (02:34:02, 6 January 2025)
- ML18138A091 + (02:34:02, 6 January 2025)
- ML18138A089 + (02:34:04, 6 January 2025)
- ML18138A090 + (02:34:04, 6 January 2025)
- ML18138A088 + (02:34:06, 6 January 2025)
- ML18138A087 + (02:34:08, 6 January 2025)
- ML18138A086 + (02:34:09, 6 January 2025)
- ML18138A085 + (02:34:10, 6 January 2025)
- ML18138A084 + (02:34:11, 6 January 2025)
- 05000280/LER-1980-017-03, /03L-0:on 800218,at 100% Power,Vacuum Pump for Process Monitors RH-GW-101 & RM-GW-102 Found Tagged Out of Svc Leading to Release of Unmonitored Gases.Caused by Failure to Perform Procedure Before Taking Pump Out of Svc + (02:34:12, 6 January 2025)
- ML18138A079 + (02:34:14, 6 January 2025)
- PNO-II-80-029, on 800219,Unit 1 Shut Down Because of Two Pipes Calculated to Be Overstressed Inside Containment in Event of Earthquake.Failure of Overstressed Pipes Would Constitute Loss of Containment Integrity + (02:34:16, 6 January 2025)
- ML18138A077 + (02:34:17, 6 January 2025)
- ML18138A076 + (02:34:18, 6 January 2025)
- ML18138A075 + (02:34:19, 6 January 2025)
- ML18138A074 + (02:34:20, 6 January 2025)
- ML18138A073 + (02:34:21, 6 January 2025)
- ML18138A072 + (02:34:23, 6 January 2025)
- ML18138A071 + (02:34:24, 6 January 2025)
- ML18138A070 + (02:34:25, 6 January 2025)
- ML18138A069 + (02:34:26, 6 January 2025)
- 05000280/LER-1980-012-03, /03L-0:on 800202,while Performing PT-27D,amperage Readings for Circuit 25A,panels 1 & 2,were Below Acceptance Criteria.Repairs to Tape Not Completed within 2-h Limit.Unit Rampdown Intiated.Caused by Water Penetration + (02:34:27, 6 January 2025)