Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGIN.IA 23261 March 14, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attention:
Mr. Albert Schwencer, Chief Operating Reactors Branch No.I Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Denton:
Serial No. 354I/061478 PO/SWB:smv Docket Nos:
50-280 50-281 License Nos:
DPR-32 DPR-37 SURRY POWER STATION FIRE PROTECTION MODIFICATIONS Ammendment Nos. 54 and 53 to the Surry Power Station Operating License require facility modifications for fire protection.
Attached for your information is the Project Status Summary.
Specific information regarding the status of the projects with target due dates of February 29, 1980 are given below:
(a)
The fire extinguisher mounting brackets required by item 3.1.13 are installed.
Item 3.1.13 will be complete upon receipt and installa-tion of six fire extinguishers.
All fire extinguishers will be in place by March 31, 1980.
(b)
The oil retaining dikes (item 3.1.15A) are complete and 75 percent of the floor drain covers are installed.
This item will be complete by March 31, 1980.
(c)
The air flow detectors (item 3.1.2) are being installed.
The modifi-cation will be complete March 31, 1980.
We will continue to inform you of our progress in implementing the requirements and will be glad to answer any questions you may have.
SWB/ smv: 3Rl cc:
Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II Attachment Very truly yours, C. M. Stallings Vice President - Power Supply And Production Operations
~~I~
o 00:31 l D 'fj /.
3
ltcm No, J.1.1
- J, 1,2 A
3,1,3
- 3.1,4
), I. 5
), 1.6 3.1. 7 3.1.8
- 3.1.9 3.1.10 J. 1.11 3.1.12 J,1.13 3.1.14 J. l.15A 3.1.158
- 3.1.16 3.1.17
- J. l.18 3.1.19 J, I. 20 3.1. 21 3, l. 22
- J, I. 23 3.1.2',
- 3. l. 25
- 3.1.26
- ),1.27 3.1. 28 A
J.l.29 J, I,JO J. l. l J.2.2
- i.2.)
J. 2.4
).2.5 SURRY POWER ST/\\TION FIRE PROTECTION MODIFICATIONS PROJECT STATUS SUMM/\\RY Hod1 f icationo HODIFICATIONS SCIIEDULE AND STATUS I
[)escriptiono (I 7'I tn/7?
II 79 12179 01180 02/AO n1 sn n!. an n<'en nr,*en n7 sn 08 RO 9/m J n an J J,nn 0
Admlnletratlve Controls IIIIIIlllM!ll Air Fluw Detectore 11111111 1111111
~
Bredthing Apparetuo Cable Tray Covers UlllllJllRTTTT Ill "'""'"
Ill Safe Shutdoi,n Circuitry Comhuetiblee Ch,,rcool F 11 tera IDlIIIIIIIIlIJ 1111111 111111 Emergency Lighting llfillllllilIIll mmnmmm
"""1111 Fire Detection Syeteme Fire Barriers Hre Dnors llllIIllIIIIIIII llllll!lIIIlIDlil I
Fire Dampc<e llIIIIIII llll!IllllllllII 1IlIIIIIlllIIll Fire Extlngulohero lllllDlilillllffl *UilllllliillllllllIIIII lllllI!IlilUllll llilllllllllDllU Fl re Ladder llfflil.llllllDIT IJlillllllffilffi
.-!nor IJrnlno, Ulkee InnIDllllIDllllill.lITlllllllilllllffilll llllITillllilllllll ll,illllllll!IllTI IIIJIIIIIlll[
011 Col I cctlon Syetemo Dll1IIImlllllIIDD IDJIJJ-,llIIlBmnu UilllllillllDillnII nmrrn1 11 c:on Sup11renulon System*
DIIUDIIIUIII llllllllllll --- ---* ---- --- ------
llose Nozzlee lillIIlllmum llliIIIIIIII-llose Stations
!UilllllllITlllllllll,llll!llllllllllll[ Dl11111Ill1Il1lll Jn11 l>
llydrogcn Lines Hose Foam Carta lllllll:JllJlllll[ *mumni IIIlillilllIIIJ lllllllllDllll llydrante Valve Supcrvlelon 1111111111 II..
Monltorlng Panels Penetrations TI!lllJIIIlill lllll!lllilll llilllIIIIlilill llfilll[I]IJfl Safe Shutdown rmmmm*[ IIIlll[Il!lll IIIIIIIllilIIl1l fi111""'"11 Yater Supprcoolon Syo~eme Vcntllntion System
!IIlIIIIIlJlllillllll UIIIlillillllllilll llllll!Jlllllllll UllllIIlllllllll Fire Detection System Power Wat~r Spray Shlelde mmmnmm mmnnun --- ---
Technical Spcclflc11tlon9 Dlllll!D!ll.lll]ll Aux I 11ary lloller Room Fire Dampcro Safe Shutdown llllirn"""'
Charcoal Hlter llnzard In-Situ Tc,ntlng I.
Bcnlnnln~ of bar represents project start d~te,
- 2.
F.:id of har rcpre*,,nto projer.t tar&ct cornplction clato.
J.
Sluul<*d purlton rl!prcncnlu flC!rccnt cornplctc.
- 5.
Aoteriek " lndlcateo the dote of completP submittal of required inform:ition, Ii, Deltn II indlcatce the dote of partial eubmltt~l of required lnformotlon,
- 4.
Ab"enc* of hlnck indicatco project ha* not b~cn atnrtecl.
JI*
~
I I
I ISSUE DA1'E: 3- °7"- :JO lbiQ --