ML18138A085

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Written Response Required
ML18138A085
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 02/08/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
GL-80-12, NUDOCS 8003180089
Download: ML18138A085 (7)


Text

I -

~ ' -,..

i' I,-"

  • 1 i

e e

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II In Reply Refer To:

RIL:JPO 50-338, 50-339 c.J0-280, 50-2~

101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 FEB 8 1980 Virginia Electric and Power Company Attn:

J. H. Ferguson Executive Vice President-Power P. O. Box 26666 Richmond, VA 23261 Gentlemen:

The enclosed IE Bulletin No. 80-04, is forwarded for action.

A written response is required. If you desire additional information regarding this matter, please contact this office.

Enclosures:

1.

IE Bulletin No. 80-04

2.

Most Recently Issued IE Bulletins Sincerely, p.r-James P. O'Reilly Director f

  • 1

_L_ __

\\_

8_0 03 JS do 8 9

\\

\\

--1

Virginia Electric and Power Company cc w/encl:

W.R. Cartwright, Station Manager

,* ~

~;:

'i

i. -~- ~ '"=*-

-\\

1.,-

~

1 1-

.t

i
1. f l'

Post Office Box 402 Mineral, Virginia 23117 P. G. Perry Senior Resident Engineer Post Office Box 38 Mineral, Virginia 23117 W. L. Stewart, Manager Post Office Box 315 Surry, Virginia 23883 j

t

.s,
  • -1 -------- - --- - ----
--! __, ; __ :_.:_~_-: -'..: ~ -

j 1

~ *-*

\\l?-; ~~_\\: ; _:- -:-. -.

  • '):***,:,.***
    • .a*

~-.;.. :_t~*': ~~-: :*-:.. ~ *- __ * ~. -*

I ~--~ --**---*-*-* *. *.*--- *** ***-* **

':).-~~:c'.:':;y~_:-~?-<.

..,, c~ -- --

, J

.. e

--~-. *..... -*... * *....:~.:.:.:-. *: -*.....

..... ~-

--~

.. *-.** *.. -**--*;_.;;<~-.. * *'-*"

. - --~ _,.;. - --** -

FEB 8 1S88

i\\
;~<::::: t::.<: *j
,.i_~, ~~--.:.~... ~:-.-.. ~:~;*-*.*:._;.~*:.......... '~-.¥***..... **r:...' _ ~-.-- ---*.*_ rie... -~-_ ** _---- ---~-------~

__ -:::-:--**..,..~---~------........,._-,......,.,.,...~---~~~~~~---,-:r-:"~--------~;-r,

--**~-

..... **,-. ______,. _____,.. -.*:~-*---**---............ -* --*-.. *-**-... --~- ~-. -.......,.

~*..

e UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 February 8, 1980 e

SSINS No.:

6820 Accessions No.:

7910250504 IE Bulletin No. 80-04 ANALYSIS OF A PWR MAIN STEAM LINE BREAK WITH CONTINUED FEEDWATER ADDITION Description of Circumstances:

,:irginia Electric and Power Co. submitted a report to the Nuclear Regulatory

=:ommission dated September 7, 1979 that identified a deficiency in the original

  • ,,a,lysis of containment pressurization as a result of reanalysis of steam line ak for North Anna Power Station, Units 3 and 4.
  • ;:_one and Webster Engineering Corporation performed a reanalysis of containment

~essure following a main steam line break and determined that, if the auxiliary

..:eedwat.er system continued to supply feedwater at runout conditions to the steam generator that had experienced the steam line break, containment design pressure would be exceeded in approximately 10 minutes.

The long term blowdown of the water supplied under runout conditions by the auxiliary feedwater system had not been considered in the earlier analysis.

On October 1, 1979, the foregoing information was provided to all holders of operating licenses and construction permits in IE Information Notice No. 79-24.

The Palisades facility did an accident analysis review pursuant to the information in the notice and discovered that with offsite power available, the condensate pumps would feed the affected generator at an excessive rate.

This excessive feed was not considered in the analysis for the steam line

  • break accident.

On January 30, 1980, Maine Yankee Atomic Power Company informed the NRC of an error in the main steam line break analysis for the Maine Yankee plant.

During a review of the main steam line break analysis, for zero or low power at the end of core life, the licensee identified an incorrect postulation that the startup feedwater control valves would remain positioned "as is" during the transient.

In reality, the startup feedwater control valves will ramp to 80% full open.du~ to an override signal resulting from the low steam generator pressure reacto:,:- trip signal.

Reanalysis of the event shows the opening of the startup valve and associated high feedwater addition to the affected steam generator would cause a rapid reactor cooldown and resultant return-to-power, a condition outside the plant design basis.

Actions to be Taken by the Licensee:

For all pressurized water power reactors with an operating license and those reactors listed in Enclosure 1:

1.

Review the containment pressure response analysis to determine if the potential for containment overpressure for a main steam line break

IE Bulletin No. 80-04 February 8, 1980 Page 2 of 3 inside containment included the impact of runout flow from the auxiliary feedwater system and the impact of other energy sources, such as continuation of feedwater or condensate flow.

In your review, consider your ability to detect and isolate the damaged steam generator from these sources and the ability of the pumps to remain operable after extended operation at runout flow.

2.

Review your analysis of the reactivity increase which results from a main steam line break inside or outside containment.

This review should consider the reactor cooldown rate and the potential for the reactor to return to power with the most reactive control rod in the fully withdrawn position.

If your previous analysis did not consider all potential water sources (such as those listed in 1 above) and if*

the reactivity increase is greater than previous analysis indicated the report of this review should include:

a.

The boundary conditions for the analysis, e.g., the end of life shutdown margin, the moderator temperature coefficient, power level and the net effect of the associated steam generator water inventory on the reactor system cooling, etc.,

b.

The most restrictive ~ingle active failure in the safety injection system and the effect of that failure on delaying the delivery of high concentration boric acid solution to the reactor coolant system,

c.

The effect of extended water supply to the affected steam generator on the core criticality and return to power,

d.

The hot channel factors corresponding to the most reactive rod in the fully withdrawn position at the end of life, and the Minimum Departure from Nucleate Boiling Ratio (MDNBR) values for the analyzed transient.

3.

If the potential for containment overpressure exists or the reactor-return-to-power response worsens, provide a proposed corrective action and a schedule for cornpletion of the corrective action.

If the unit is operating, provide a description of any interim action that will be taken until the proposed corrective action is completed.

4.

Within 90 days of the date of this Bulletin, complete the review and evaluation required by this Bulletin and provide a written response describing your reviews and actions taken in response to each item.

Reports should be submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D.C. 20555.

IE Bulletin No. 80-04 February 8, 1980 Page 3 of 3 For boiling water reactors with an operating license or a construction permit and all pressurized water reactors with a construction permit, not listed in, this Bulletin is for information purposes only and no written response is required.

Approved by GAO, Bl80225 (R0072); clearance expires 7/31/80.

Approval was given under a blanket clearance specifically for identified generic problems.

Enclosure:

List of CP Plants Indicated For Action

~- ~-

,-....,----.--,:.*:r---

e e

ENCLOSURE Plants with construction permits that are required to respond to the bulletin:

Diablo Canyon McGuire North Anna 2 Salem 2 Sequoyah If the permit holders have responded to earlier requests of the items presented in the bulletin, they may respond reference to the response to. the earlier request.

from the NRC on some to the bulletin by

. t

\\ I e

IE Bulletin No. 80-04 February 8, 1980 Bulletin No.

80-04 80-03 80-02 80-01 79-0lB 79-28 79-27 79-26 79-25 79-17 (Rev. 1) 79-24 RECENTLY ISSUED IE BULLETINS Subject Date Issued Analysis of a PWR Main 2/8/80 Loss of Charcoal From 2/6/80 Standard Type II, 2 Inch, Tray Adsorber Cells Inadequate Quality 1/21/80 Assurance for Nuclear Operability of ADS Valve 1/11/80 Pneumatic Supply Environmental Qualification 1/14/80 of Class IE Equipment Possible Malfunction of 12/7/79 Namco Model EA 180 Limit Switches at Elevated Temperatures Loss Of Non-Class-1-E Instrumentation and Control Power System Bus During Operation Boron Loss From BWR Control Blades 11/30/79 11/20/79 Failures of Westinghouse 11/2/79 BFD Relays In Safety-Related Systems Pipe Cracks In Stagnant 10/29/79 Borated Water System At PWR Plants Frozen Lines 9/27/79 e

Enclosure Issued To All PWR power reactor facilities holding operating licenses and to those nearing licensing.

All holders of Power Reactor OLs and CPs All BWR licenses with a CP or OL All BWR power reactor facilities with and OL All power reactor facilities with an OL All power reactor facilities with an OL or a CP All power reactor facilities holding OLs and to those nearing licensing All BWR power reactor facilities with an OL All power reactor facilities with an OL or CP All PWR's with an OL and for information to other power reactors All power reactor facilities which have either OLs or CPs and are in the late stage pf con~t.:ruc:t:f.cm

.:.:.