Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000280/LER-1979-012, Forwards Updated LER 79-012/03X-1 + (02:18:15, 6 January 2025)
- ML18139A778 + (02:18:16, 6 January 2025)
- ML18139A777 + (02:18:17, 6 January 2025)
- ML18139A776 + (02:18:18, 6 January 2025)
- ML18139A773 + (02:18:21, 6 January 2025)
- 05000280/LER-1980-018-03, /03L-0:on 800924,charging Pump Svc Water Pump 2-SW-P-10A Would Not Develop Proper Discharge Head.Caused by Buildup of Matl That Had Been Entrained in Suction Side of Pump.Pump Inspected,Cleaned & Tested + (02:18:22, 6 January 2025)
- ML18139A771 + (02:18:24, 6 January 2025)
- 05000280/LER-1980-068-03, /03L-0:on 800923,radiation Monitoring Sampling Pumps 1-SW-P-5C & D Were Found to Be Inoperable.Caused by Corroded Pump Impeller & Seals.Pumps Will Be Removed,Tested & Inspected Prior to Startup + (02:18:25, 6 January 2025)
- ML18139A768 + (02:18:26, 6 January 2025)
- 05000281/LER-1980-028-03, /03L-0:on 800926,w/unit at 100% Power,Reduction in Svc Water Pressure to Charging Pumps Experienced.Caused by Missing Valve Disk for Check Valve 2-SW-112.Valve Replaced + (02:18:28, 6 January 2025)
- 05000281/LER-1980-028, Forwards LER 80-028/03L-0 + (02:18:30, 6 January 2025)
- ML18139A764 + (02:18:31, 6 January 2025)
- ML18139A763 + (02:18:32, 6 January 2025)
- ML18139A762 + (02:18:33, 6 January 2025)
- ML18139A761 + (02:18:34, 6 January 2025)
- ML18139A760 + (02:18:35, 6 January 2025)
- ML18139A759 + (02:18:36, 6 January 2025)
- ML18139A758 + (02:18:37, 6 January 2025)
- ML18139A757 + (02:18:39, 6 January 2025)
- 05000280/LER-1980-025-03, /03L-0:on 801003,w/Unit 2 at 100% Power,Periodic Test 27D Revealed That Amperage for Circuit 2A Panel 10 Was Below Acceptance Criteria.Caused by Damaged Heat Tracing Tape.Verified That Redundant Circuit Was Operable + (02:18:40, 6 January 2025)
- 05000280/LER-1980-065-03, /03L-0:on 800917,w/unit at Refueling Shutdown, MOV-SW-103B Did Not Operate Electrically During Flush of Recirculation Spray Heat Exchangers.Cause Undetermined,But Marine Growth Suspected.Valve Manually Cycled + (02:18:42, 6 January 2025)
- ML18139A752 + (02:18:43, 6 January 2025)
- IR 05000280/1980021 + (02:18:45, 6 January 2025)
- ML18139A750 + (02:18:47, 6 January 2025)
- ML18139A748 + (02:18:47, 6 January 2025)
- ML18139A747 + (02:18:48, 6 January 2025)
- 05000280/LER-1980-046-03, /03L-0:on 800809,during Startup Operations, Containment Vacuum Sys Steam Ejector Was Placed in Svc W/O Obtaining Containment Gaseous Release Form.Caused by Personnel Error + (02:18:50, 6 January 2025)
- 05000280/LER-1980-046, Forwards LER 80-046/03L-0 + (02:18:52, 6 January 2025)
- ML18139A742 + (02:18:53, 6 January 2025)
- ML18139A741 + (02:18:54, 6 January 2025)
- ML18139A740 + (02:18:55, 6 January 2025)
- ML18139A737 + (02:18:56, 6 January 2025)
- 05000280/LER-1980-042-03, /03L-0:on 800805,pump for Drawing Radiation Samples from Process Vent Sys Froze & Triggered Low Flow Alarm.Caused by Moisture Condensation in Pump Area.Pump Pulled & Replaced + (02:18:57, 6 January 2025)
- 05000280/LER-1980-042, Forwards LER 80-042/03L-0 + (02:18:59, 6 January 2025)
- ML18139A732 + (02:19:01, 6 January 2025)
- ML18139A731 + (02:19:03, 6 January 2025)
- ML18139A729 + (02:19:04, 6 January 2025)
- ML18139A728 + (02:19:04, 6 January 2025)
- ML18139A727 + (02:19:05, 6 January 2025)
- ML18139A726 + (02:19:06, 6 January 2025)
- ML18139A725 + (02:19:07, 6 January 2025)
- 05000281/LER-1980-011-01, /01T-0:on 800819,at 12% Power,Steam Flow Transmitters (FI-474,475,484,485,494 & 495) Isolated Contrary to Tech Spec-3.7.B.Caused by Transmitters Being Isolated Following Containment Integrated Leak Rate Test + (02:19:08, 6 January 2025)
- 05000281/LER-1980-011, Forwards LER 80-011/01T-0 + (02:19:10, 6 January 2025)
- IR 05000280/1980010 + (02:19:47, 6 January 2025)
- ML18139A719 + (02:19:49, 6 January 2025)
- ML18139A717 + (02:19:50, 6 January 2025)
- ML18139A715 + (02:19:51, 6 January 2025)
- 05000280/LER-1980-040-03, /03L-0:on 800731,in Steady State Operation, Found That Primary to Secondary Leakage Through 1C Steam Generator Was 0.33 Gpm.Caused by Primary to Secondary Leakage Through Four Steam Generator Tubes + (02:19:53, 6 January 2025)
- 05000280/LER-1980-040, Forwards LER 80-040/03L-0 + (02:19:55, 6 January 2025)
- ML18139A705 + (02:19:57, 6 January 2025)
- ML18139A704 + (02:19:57, 6 January 2025)