Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6427, Final Deficiency Rept CP-86-46 Re Design Change to Vendor Supplied Equipment Made W/O Formal Evaluation by Vendor. Initially Reported on 861021.Bolt Connection Voided & Original Design Requirements Reestablished + (22:08:21, 6 December 2024)
- ML20210A972 + (22:08:30, 6 December 2024)
- ML20210A969 + (22:08:43, 6 December 2024)
- ML20210A968 + (22:08:44, 6 December 2024)
- IR 05000029/1986011 + (22:08:52, 6 December 2024)
- ML20210A960 + (22:08:53, 6 December 2024)
- ML20210A961 + (22:08:53, 6 December 2024)
- ML20210A959 + (22:08:54, 6 December 2024)
- ML20210A957 + (22:09:01, 6 December 2024)
- ML20210A956 + (22:09:01, 6 December 2024)
- U-600817, Application for Amend to License NPF-55,providing Addl Changes to Clarify & Enhance Tech Specs Which Will Accompany Full Power OL for Plant.No Amend of Present Low Power License Requested.Changes Consistent W/Fsar as Amended + (22:09:09, 6 December 2024)
- IR 05000243/1987001 + (22:09:11, 6 December 2024)
- ML20210A949 + (22:09:11, 6 December 2024)
- ML20210A944 + (22:09:12, 6 December 2024)
- ML20210A947 + (22:09:12, 6 December 2024)
- ML20210A943 + (22:09:13, 6 December 2024)
- ML20210A942 + (22:09:13, 6 December 2024)
- ML20210A939 + (22:09:14, 6 December 2024)
- ML20210A937 + (22:09:15, 6 December 2024)
- ML20210A936 + (22:09:15, 6 December 2024)
- ML20210A935 + (22:09:16, 6 December 2024)
- ML20210A934 + (22:09:16, 6 December 2024)
- TAC:59756 + (22:09:17, 6 December 2024)
- ML20210A932 + (22:09:24, 6 December 2024)
- ML20210A931 + (22:09:24, 6 December 2024)
- ML20210A930 + (22:09:25, 6 December 2024)
- ML20210A928 + (22:09:26, 6 December 2024)
- ML20210A929 + (22:09:26, 6 December 2024)
- PY-CEI-NRR-0641, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-05.Corrective Actions:Planning & Control Functions for Plant Emergency Instructions Validation Performed Utilizing Other Documentation Methods + (22:09:37, 6 December 2024)
- ML20210A924 + (22:09:39, 6 December 2024)
- TXX-6414, Interim Deficiency Rept Re Seismic Design of Conduit. Initially Reported on 861021.Corrective Action Dependent on Results of Fiberglass Cloth/Resin Matl Testing for Loading Conditions.Next Rept Will Be Submitted by 870921 + (22:09:40, 6 December 2024)
- ML20210A923 + (22:09:40, 6 December 2024)
- ML20210A919 + (22:09:41, 6 December 2024)
- ML20210A921 + (22:09:41, 6 December 2024)
- ML20210A911 + (22:10:03, 6 December 2024)
- ML20210A910 + (22:10:03, 6 December 2024)
- ML20210A908 + (22:10:04, 6 December 2024)
- ML20210A904 + (22:10:05, 6 December 2024)
- ST-HL-AE-2132, Submits Interim Rept on Activities Undertaken in Order to Evaluate Use of Welded Attachments on ASME III Class 2 & 3 Piping at Plant,Per .Evaluation of Pipe Supports Continuing.Final Rept Will Be Forwarded by 870710 + (22:10:08, 6 December 2024)
- ML20210A900 + (22:10:17, 6 December 2024)
- ML20210A896 + (22:10:23, 6 December 2024)
- ML20210A895 + (22:10:24, 6 December 2024)
- ML20210A894 + (22:10:24, 6 December 2024)
- ML20210A893 + (22:10:25, 6 December 2024)
- ML20210A890 + (22:10:34, 6 December 2024)
- ML20210A889 + (22:10:34, 6 December 2024)
- ML20210A886 + (22:10:35, 6 December 2024)
- IR 05000344/1987007 + (22:10:37, 6 December 2024)
- BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 + (22:10:38, 6 December 2024)
- ML20210A881 + (22:10:45, 6 December 2024)
- ML20210A880 + (22:10:46, 6 December 2024)
- BSEP-99-0111, Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR + (22:10:47, 6 December 2024)