Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210B914 + (21:56:26, 6 December 2024)
- ML20210B915 + (21:56:26, 6 December 2024)
- ML20210B911 + (21:56:27, 6 December 2024)
- ML20210B913 + (21:56:27, 6 December 2024)
- ML20210B909 + (21:56:28, 6 December 2024)
- ML20210B908 + (21:56:28, 6 December 2024)
- ML20210B907 + (21:56:29, 6 December 2024)
- TAC:54728 + (21:56:30, 6 December 2024)
- ML20210B906 + (21:56:31, 6 December 2024)
- 05000259/LER-1985-051-01, :on 850925,cable Connecting Reactor Protection Sys Panel 9-17 Supply Breaker to Terminal Block Dried & Insulation Cracked.Caused by Loose Breaker Connection. Defective Cable Replaced W/Larger Gauge Cables + (21:56:33, 6 December 2024)
- ML20210B902 + (21:56:34, 6 December 2024)
- ML20210B901 + (21:56:34, 6 December 2024)
- ML20210B899 + (21:56:35, 6 December 2024)
- ML20210B898 + (21:56:36, 6 December 2024)
- ML20210B897 + (21:56:37, 6 December 2024)
- ML20210B895 + (21:56:37, 6 December 2024)
- ML20210B894 + (21:56:38, 6 December 2024)
- L-99-111, Forwards Revised Final Typed Pages for LARs 109 & 115, Previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115.With Summary of Editorial Changes + (21:56:41, 6 December 2024)
- ML20210B889 + (21:56:42, 6 December 2024)
- ML20210B884 + (21:56:44, 6 December 2024)
- ML20210B882 + (21:56:44, 6 December 2024)
- ML20210B878 + (21:56:45, 6 December 2024)
- ML20210B880 + (21:56:45, 6 December 2024)
- ML20210B877 + (21:56:46, 6 December 2024)
- ML20210B876 + (21:56:47, 6 December 2024)
- ML20210B875 + (21:56:47, 6 December 2024)
- ML20210B871 + (21:56:48, 6 December 2024)
- ML20210B873 + (21:56:48, 6 December 2024)
- ML20210B870 + (21:56:49, 6 December 2024)
- RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld + (21:56:50, 6 December 2024)
- ML20210B865 + (21:56:51, 6 December 2024)
- ML20210B864 + (21:56:52, 6 December 2024)
- ML20210B862 + (21:56:53, 6 December 2024)
- ML20210B861 + (21:56:53, 6 December 2024)
- ML20210B860 + (21:56:54, 6 December 2024)
- ML20210B858 + (21:56:55, 6 December 2024)
- ML20210B857 + (21:56:56, 6 December 2024)
- ML20210B856 + (21:56:56, 6 December 2024)
- ML20210B855 + (21:56:57, 6 December 2024)
- ML20210B853 + (21:56:58, 6 December 2024)
- ML20210B852 + (21:56:58, 6 December 2024)
- ML20210B850 + (21:56:59, 6 December 2024)
- PNO-V-86-004, on 860124,Troxler Model 3401B Moisture/Density Gauge Found Missing.Missing Gauge Erroneously Ordered Under License 04-07316-05.Investigation to Locate Gauge Continuing + (21:56:59, 6 December 2024)
- ML20210B849 + (21:57:00, 6 December 2024)
- ML20210B848 + (21:57:01, 6 December 2024)
- PY-CEI-NRR-0632, Responds to Violations Noted in Insp Rept 50-440/87-03. Corrective Actions:Plant Administrative Procedure PAP-0606 Will Be Revised to Clearly Define RCIC & HPCS as Single Train Safety Sys + (21:57:01, 6 December 2024)
- PNO-III-86-006A, on 860126-30,inspectors Onsite to Continue Special Insp of Dec 1984 U Hexafluoride Cylinder Overfill Incident.Inspectors Plan to Return on 860210 for Further Review.Plant Manager Relieved of Duties Pending Insp + (21:57:02, 6 December 2024)
- ML20210B843 + (21:57:03, 6 December 2024)
- ML20210B841 + (21:57:03, 6 December 2024)
- ML20210B840 + (21:57:04, 6 December 2024)
- ML20210B838 + (21:57:04, 6 December 2024)
- ML20210B836 + (21:57:05, 6 December 2024)