Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210R119 + (06:33:44, 6 December 2024)
- ML20210R120 + (06:33:44, 6 December 2024)
- ML20210R118 + (06:33:45, 6 December 2024)
- IR 05000275/1986032 + (06:33:57, 6 December 2024)
- ML20210R114 + (06:33:57, 6 December 2024)
- ML20210R113 + (06:33:58, 6 December 2024)
- BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl + (06:33:59, 6 December 2024)
- ML20210R109 + (06:34:00, 6 December 2024)
- ML20210R110 + (06:34:00, 6 December 2024)
- ML20210R105 + (06:34:02, 6 December 2024)
- ML20210R099 + (06:34:06, 6 December 2024)
- ML20210R097 + (06:34:07, 6 December 2024)
- ML20210R093 + (06:34:08, 6 December 2024)
- ML20210R088 + (06:34:11, 6 December 2024)
- ML20210R087 + (06:34:12, 6 December 2024)
- ML20210R085 + (06:34:12, 6 December 2024)
- ML20210R082 + (06:34:13, 6 December 2024)
- ML20210R080 + (06:34:14, 6 December 2024)
- ML20210R081 + (06:34:14, 6 December 2024)
- ML20210R079 + (06:34:15, 6 December 2024)
- ML20210R077 + (06:34:16, 6 December 2024)
- ML20210R074 + (06:34:17, 6 December 2024)
- ML20210R075 + (06:34:17, 6 December 2024)
- ML20210R073 + (06:34:18, 6 December 2024)
- ML20210R072 + (06:34:18, 6 December 2024)
- ML20210R070 + (06:34:19, 6 December 2024)
- ML20210R067 + (06:34:20, 6 December 2024)
- ML20210R066 + (06:34:20, 6 December 2024)
- ML20210R065 + (06:34:21, 6 December 2024)
- ML20210R061 + (06:34:22, 6 December 2024)
- ML20210R060 + (06:34:23, 6 December 2024)
- ML20210R059 + (06:34:24, 6 December 2024)
- ML20210R053 + (06:34:25, 6 December 2024)
- ML20210R055 + (06:34:25, 6 December 2024)
- 05000370/LER-1999-004-03, :on 990715,RT During Ssps Testing Was Noted. Caused by Switch Lever Arm Being mis-aligned During Insp or Refurbished Breaker.Made Procedure Enhancements + (06:34:28, 6 December 2024)
- ML20210R050 + (06:34:29, 6 December 2024)
- 05000302/LER-1997-023, :on 970730,design Engineering Process Allowed Installation of Vital Bus Inverters Containing Unanalyzed Trip Circuit.Caused by Weakness in Engineering Process. Modified Inverters + (06:34:31, 6 December 2024)
- ML20210R045 + (06:34:32, 6 December 2024)
- ML20210R043 + (06:34:33, 6 December 2024)
- ML20210R044 + (06:34:33, 6 December 2024)
- ML20210R040 + (06:34:34, 6 December 2024)
- ML20210R041 + (06:34:34, 6 December 2024)
- IR 05000424/1986067 + (06:34:36, 6 December 2024)
- ML20210R038 + (06:34:36, 6 December 2024)
- ML20210R036 + (06:34:38, 6 December 2024)
- 05000289/LER-1997-009-01, :on 970725,engineering Analysis of Loss of a Train DC Power W/Loss of Offsite Power & LOCA Was Determined.Caused by Plant Designers Error.Trained Operators on Methodology to Regain Control of Es Equipment + (06:34:40, 6 December 2024)
- ML20210R030 + (06:34:41, 6 December 2024)
- ML20210R028 + (06:34:41, 6 December 2024)
- ML20210R024 + (06:34:42, 6 December 2024)
- 05000289/LER-1997-009, Forwards LER 97-009-00,re Condition Which Was Evaluated & Determined to Be Reportable on 970725.Condition Was Identified as Result of Review of Crystal River 3 LER for Applicability at TMI-1 + (06:34:43, 6 December 2024)
- ML20210R021 + (06:34:43, 6 December 2024)