Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000334/LER-1997-026, :on 970814,CR Ventilation Isolation Dampers & Containment Isolation Valves Did Not Meet TS ESF Response Time Srs.Caused by Inadequate Surveillance Test Procedures. Reviewed Surveillance Test Data + (05:51:23, 6 December 2024)
- ML20210U793 + (05:51:24, 6 December 2024)
- ML20210U791 + (05:51:24, 6 December 2024)
- ML20210U789 + (05:51:25, 6 December 2024)
- ML20210U790 + (05:51:25, 6 December 2024)
- ML20210U787 + (05:51:26, 6 December 2024)
- 05000346/LER-1987-004, :on 870112,auxiliary Feedwater Train 1 Declared Inoperable.Caused by Failure to Evaluate Effects of Main Steam Sys Chemistry on Installed Diaphragms.Three Layer Pressure Switch Diaphragm Matl Replaced + (05:51:28, 6 December 2024)
- ML20210U784 + (05:51:29, 6 December 2024)
- ML20210U785 + (05:51:29, 6 December 2024)
- ML20210U783 + (05:51:30, 6 December 2024)
- ML20210U781 + (05:51:31, 6 December 2024)
- IR 05000295/1986025 + (05:52:04, 6 December 2024)
- ML20210U775 + (05:52:04, 6 December 2024)
- ML20210U773 + (05:52:06, 6 December 2024)
- ML20210U772 + (05:52:06, 6 December 2024)
- ML20210U771 + (05:52:07, 6 December 2024)
- ML20210U764 + (05:52:10, 6 December 2024)
- ML20210U769 + (05:52:10, 6 December 2024)
- ML20210U762 + (05:52:11, 6 December 2024)
- ML20210U761 + (05:52:12, 6 December 2024)
- ML20210U758 + (05:52:13, 6 December 2024)
- ML20210U760 + (05:52:13, 6 December 2024)
- ML20210U757 + (05:52:14, 6 December 2024)
- ML20210U756 + (05:52:14, 6 December 2024)
- ML20210U755 + (05:52:15, 6 December 2024)
- ML20210U754 + (05:52:16, 6 December 2024)
- ML20210U750 + (05:52:17, 6 December 2024)
- ML20210U752 + (05:52:17, 6 December 2024)
- ML20210U747 + (05:52:18, 6 December 2024)
- ML20210U748 + (05:52:18, 6 December 2024)
- ML20210U746 + (05:52:19, 6 December 2024)
- 05000324/LER-1986-025, :on 861119,determined That Surveillance Testing for Reactor Jet Pump Not Performed.Caused by Personnel Error.Personnel Involved discplined.Real-time Training Completed + (05:52:20, 6 December 2024)
- ML20210U744 + (05:52:21, 6 December 2024)
- IR 05000443/1986024 + (05:52:22, 6 December 2024)
- ML20210U740 + (05:52:25, 6 December 2024)
- ML20210U738 + (05:52:25, 6 December 2024)
- BSEP-97-0415, Forwards Rev 0 to GE-NE-523-48-0494, Structural Assessment of Brunswick 1 RPV for Scram Event, Which Provides Addl Info on License Amend Request Re pressure-temp Limits Curves + (05:52:26, 6 December 2024)
- ML20210U737 + (05:52:26, 6 December 2024)
- ML20210U733 + (05:52:28, 6 December 2024)
- ML20210U734 + (05:52:28, 6 December 2024)
- ML20210U732 + (05:52:29, 6 December 2024)
- ML20210U731 + (05:52:29, 6 December 2024)
- ML20210U728 + (05:52:30, 6 December 2024)
- ML20210U726 + (05:52:31, 6 December 2024)
- ML20210U725 + (05:52:31, 6 December 2024)
- ML20210U724 + (05:52:32, 6 December 2024)
- ML20210U720 + (05:52:33, 6 December 2024)
- 05000412/LER-1999-006-01, :on 990716,loss of Plant 4kV Train B Emergency Bus Occurred.Caused by Detected Ground Overcurrent Condition.Three Associated Control Relays in EDG 2-2 Voltage Regulator Were Replaced.With + (05:52:35, 6 December 2024)
- 05000293/LER-1999-007-02, :on 990716,discovered That Bus B6 Voltage Restoration Was Not Consistent with Safety Analysis Assumptions.Caused by Personnel Error During Development of Design Change.Will Evaluate Need for Mod.With + (05:52:37, 6 December 2024)
- ML20210U714 + (05:52:38, 6 December 2024)
- ML20210U716 + (05:52:38, 6 December 2024)
- ML20210U713 + (05:52:43, 6 December 2024)