Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211A320 + (05:38:25, 6 December 2024)
- 05000458/LER-1986-056, :on 860902,reactor Scrammed on RCIC Initiation. Caused by Entrapped Air in Instrument Sensing Line Following Maint.Air Vented from Instrumentation & Loose Transmitter Connection Reworked & Corrected + (05:38:27, 6 December 2024)
- ML20211A316 + (05:38:28, 6 December 2024)
- ML20211A315 + (05:38:28, 6 December 2024)
- TXX-5049, Forwards Addl Info on 860912 Proposed FSAR Amend, Incorporating Changes Re S&W Piping & Piping Support Requalification Effort.Changes Consistent W/Current Staff Guidance,Including NUREG-0800 + (05:38:29, 6 December 2024)
- ML20211A312 + (05:38:30, 6 December 2024)
- ML20211A311 + (05:38:30, 6 December 2024)
- ML20211A310 + (05:38:31, 6 December 2024)
- ML20211A309 + (05:38:31, 6 December 2024)
- ML20211A307 + (05:38:32, 6 December 2024)
- 05000423/LER-1987-003, :on 870114 & 0205,Train B Emergency Diesel Generator Did Not Start within Required 10 During Surveillance Testing.Caused by Inadequate Purge of Air from Fuel Injectors & Low Oil Temp.Maint Performed + (05:38:34, 6 December 2024)
- ML20211A305 + (05:38:35, 6 December 2024)
- ML20211A304 + (05:38:36, 6 December 2024)
- ML20211A302 + (05:38:37, 6 December 2024)
- ML20211A303 + (05:38:37, 6 December 2024)
- ML20211A301 + (05:38:38, 6 December 2024)
- ML20211A299 + (05:38:39, 6 December 2024)
- ML20211A298 + (05:38:39, 6 December 2024)
- ML20211A296 + (05:38:40, 6 December 2024)
- SVP-97-195, Documents Assessment Methods by Which Plant Conforms to 10CFR70.24 Re Criticality Monitoring Requirements for NRC Insp Repts 50-254/96-11 & 50-265/96-11 + (05:38:40, 6 December 2024)
- ML20211A293 + (05:38:41, 6 December 2024)
- AECM-86-0299, Suppls 860714 Application for Proposed Amend to License NPF-29,consisting of Proposed Change 86-15,changing Tech Specs to Support Cycle 2 Operation,Per NRC Concerns. Justification for Changes & Proposed Tech Specs Encl + (05:38:44, 6 December 2024)
- ML20211A291 + (05:38:44, 6 December 2024)
- ML20211A289 + (05:38:45, 6 December 2024)
- ML20211A288 + (05:38:46, 6 December 2024)
- ML20211A285 + (05:38:47, 6 December 2024)
- IR 05000454/1986032 + (05:38:52, 6 December 2024)
- PLA-2798, Monthly Operating Repts for Jan 1987 + (05:38:58, 6 December 2024)
- ML20211A281 + (05:38:59, 6 December 2024)
- ML20211A278 + (05:39:00, 6 December 2024)
- ML20211A277 + (05:39:01, 6 December 2024)
- ML20211A275 + (05:39:03, 6 December 2024)
- ML20211A274 + (05:39:04, 6 December 2024)
- ML20211A272 + (05:39:05, 6 December 2024)
- ML20211A270 + (05:39:05, 6 December 2024)
- ML20211A268 + (05:39:09, 6 December 2024)
- ML20211A265 + (05:39:11, 6 December 2024)
- IR 05000277/1986026 + (05:39:14, 6 December 2024)
- ML20211A262 + (05:39:15, 6 December 2024)
- ML20211A260 + (05:39:16, 6 December 2024)
- ML20211A259 + (05:39:16, 6 December 2024)
- ML20211A258 + (05:39:17, 6 December 2024)
- ML20211A256 + (05:39:18, 6 December 2024)
- ML20211A257 + (05:39:18, 6 December 2024)
- ML20211A253 + (05:39:20, 6 December 2024)
- ML20211A250 + (05:39:21, 6 December 2024)
- ML20211A251 + (05:39:21, 6 December 2024)
- 05000344/LER-1986-009, :on 860906,reactor Trip Breakers Opened.Caused by source-range Neutron Detector Spike Following Preparation for Reactor Startup.Reactor Trip Breakers Shut & Reactor Started.Investigation Continuing + (05:39:23, 6 December 2024)
- ML20211A248 + (05:39:24, 6 December 2024)
- ML20211A247 + (05:39:24, 6 December 2024)
- 05000250/LER-1987-004, :on 870112,discovered That One Train of Auxiliary Feedwater Out of Svc When Both Units Above Hot Shutdown.Caused by Erroneous Flow Indication of Indicator FI-1457A.Flow Transmitter Replaced + (05:39:26, 6 December 2024)