Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211H016 + (04:14:43, 6 December 2024)
- 05000247/LER-1987-001, :on 870121,while Unit at 98% Power,Plant Shutdown Initiated When Emergency Diesel Generator Svc Water Subsystem Declared Inoperable.Caused by Misalignment of Linkage Between Valves.Linkage Adjusted + (04:14:45, 6 December 2024)
- ML20211H011 + (04:14:46, 6 December 2024)
- ML20211H008 + (04:14:47, 6 December 2024)
- ML20211H009 + (04:14:47, 6 December 2024)
- ML20211H007 + (04:14:48, 6 December 2024)
- ML20211H006 + (04:14:48, 6 December 2024)
- ML20211H005 + (04:14:49, 6 December 2024)
- ML20211H003 + (04:14:50, 6 December 2024)
- ML20211H002 + (04:14:51, 6 December 2024)
- ML20211H001 + (04:14:52, 6 December 2024)
- ML20211G997 + (04:14:53, 6 December 2024)
- ML20211G996 + (04:14:54, 6 December 2024)
- ML20211G995 + (04:14:56, 6 December 2024)
- W3P87-0537, Application for Amends to License NPF-38,raising Emergency Feedwater Initiation Low Level Setpoint from 30% Wide Range Level to 36.3% & Increasing Calibr Frequency for Control Room Chlorine Detection Sys.Fee Paid + (04:14:57, 6 December 2024)
- ML20211G993 + (04:14:58, 6 December 2024)
- ML20211G992 + (04:14:58, 6 December 2024)
- TXX-6284, Forwards Addl Response to NRC Re Violations Noted in Insp Repts 50-445/85-07 & 50-446/85-05.Corrective Actions:Output Voltage Spec Changed & Documented in Halmar Test Procedure TP-001 + (04:14:59, 6 December 2024)
- ML20211G985 + (04:15:00, 6 December 2024)
- ML20211G981 + (04:15:01, 6 December 2024)
- ML20211G980 + (04:15:02, 6 December 2024)
- ML20211G978 + (04:15:03, 6 December 2024)
- ML20211G976 + (04:15:05, 6 December 2024)
- ML20211G977 + (04:15:05, 6 December 2024)
- ML20211G971 + (04:15:06, 6 December 2024)
- ML20211G970 + (04:15:07, 6 December 2024)
- ML20211G966 + (04:15:10, 6 December 2024)
- ML20211G964 + (04:15:11, 6 December 2024)
- ML20211G963 + (04:15:12, 6 December 2024)
- ML20211G962 + (04:15:12, 6 December 2024)
- 1CAN028703, Steam Generator Tubing Inservice Insp Rept for Seventh Refueling Outage + (04:15:13, 6 December 2024)
- ML20211G958 + (04:15:13, 6 December 2024)
- ML20211G957 + (04:15:14, 6 December 2024)
- ML20211G956 + (04:15:14, 6 December 2024)
- ML20211G954 + (04:15:15, 6 December 2024)
- ML20211G953 + (04:15:16, 6 December 2024)
- 05000373/LER-1987-007, :on 870120,while in Operational Condition 1 at 88% Power,Esf Alarm & half-scram on Reactor Protection Sys B Occurred When Power Lost to Scram Discharge Vol Redundant Level Sensors.Caused by Contractor Error + (04:15:17, 6 December 2024)
- ML20211G948 + (04:15:18, 6 December 2024)
- ML20211G947 + (04:15:19, 6 December 2024)
- ML20211G945 + (04:15:20, 6 December 2024)
- ML20211G944 + (04:15:20, 6 December 2024)
- ML20211G942 + (04:15:21, 6 December 2024)
- ML20211G943 + (04:15:21, 6 December 2024)
- ML20211G941 + (04:15:22, 6 December 2024)
- ML20211G939 + (04:15:23, 6 December 2024)
- ML20211G940 + (04:15:23, 6 December 2024)
- ML20211G937 + (04:15:24, 6 December 2024)
- ML20211G935 + (04:15:25, 6 December 2024)
- ML20211G936 + (04:15:25, 6 December 2024)
- ML20211G934 + (04:15:26, 6 December 2024)
- ML20211G933 + (04:15:27, 6 December 2024)