ML20211H009

From kanterella
Jump to navigation Jump to search
Forwards Quarterly Update to Startup Rept for Cycle 1.Some Tests Not Yet Complete,As Indicated in Author to Jn Grace.Addl Updates to Startup Rept Will Be Submitted as Required by Tech Specs
ML20211H009
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 02/16/1987
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8702260037
Download: ML20211H009 (2)


Text

_

e s-DUKE POWER GOMPAFf P.O. DOX 33180 GIIARLOTTE, N.C. 28242 HALB. TUCKER MLEPHONE ya,,,...,,,

(704) 373-4SGI Ett,Lg43 PRODE'CTIOff February 16, 1987 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D. C. 20555

Subject:

Catawba Nuclear Station, Unit 2 Docket No. 50-414 Supplement to Startup Report l

Gentlemen:

In accordance with Section 6.9.1.3 of the Catawba Nuclear Station Technical Specifications, please find attached the first quarterly update to the Unit 2 Startup Report. As indicated on my November 17, 1986 letter to Dr. J. Nelson Grace, NRC/ Region II, some tests are not yet complete. Additional quarterly updates to the Startup Report will be submitted as required by Technical Specifications.

Very truly yours,

/6/

7

.At Hal B. Tucker JGT/09/sbn Attachment xc:

Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station h(p 8702260037 870216 PDR ADOCK 05000414 b

/y

\\

R PDR

\\

IL

o STARTUP REPORT QUARTEPLY UPDATE CATAWBA UNIT 2 CYCLE 1 FEBRUARY 16, 1937

}

TESTING COMPLETED DURING QUARTER

l. UNIT LOAD STEADY STATE - PT/2/B/4150/16 This test was described in Sections 7.2 and 10.4 in the Startup Report. The test was completed following the replacement of a 7300 Process Control System circuit card associated with loop B T-Hot indication. This solved a problem discovered while making delta-T measurements. The test was completed on November 26,1986. The measured full 1

power delta-T's (in Deg. F) for each loop were: 56.2 (A),

56.8 (B), 57.1 (C) and 57.1 (D).

STATUS OF TESTING NOT COMPLETE

1. UNIT LOSS OF ELECTRICAL LOAD TEST - TP/2/A/2650/06 1

i Thi.s test was described in Sections 7.6 and 10.1 in the Startup Report. It has not yet been performed. It will be performed when Unit conditions permit.

2. SECONDARY SYSTEMS FUNCTIONAL TEST - TP/2/B/2650/09 This test was described in Sections 10.2 and 11.2 in the Startup Report. It is complete except for measurements to be made during the Unit Loss of Electrical Load Test.
3. POST TRANSIENT PIPING SURVEY - TP/2/A/1200/26 This test was described in Sections 10.3 and 11.6 in the Startup Report. It is complete except for inspections to be made following the Unit Loss of Electrical Load Test.
4. STEADY STATE PIPING SYSTEMS OPERATIONAL VIBRATION

[

MEASUREMENT - TP/2/A/1200/21 l

This test was described in Sections 10.5 and 11.5 in the Startup Report. It is complete except for retesting of piping associated with the Diesel Generator Fuel Oil and i

Lube Oil systems. Additional restraints are to be installed.

5. WASTE GAS EFFLUENT RADIATION MONITORING TEST -

TP/0/B/2600/15A This test was described in Sections 9.3 and 10.6 in the Startup Report. This test has not been performed. It requires completion of modifications to the Waste Gas I

(

system. This is to be done during the summer of 1987.