Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212A695 + (01:49:07, 6 December 2024)
- ML20212A694 + (01:49:09, 6 December 2024)
- ML20212A693 + (01:49:09, 6 December 2024)
- ML20212A692 + (01:49:11, 6 December 2024)
- ST-HL-AE-1711, Forwards Proprietary & Nonproprietary Supplemental Info Re Momentary Fuel Assembly Liftoff Specific Data on Tgx Fuel Assembly Forces,Per SER Confirmatory Item 8.Affidavit for Withholding Proprietary Info Per 10CFR2.790 Encl + (01:49:11, 6 December 2024)
- 05000302/LER-1997-030, :on 970923,installation Error Resulted in Containment Isolation Check Valve Disc Sticking in Open Position.Caused by Personnel error.FWV-46 Will Be Repaired & Returned to Service + (01:49:13, 6 December 2024)
- ML20212A688 + (01:49:14, 6 December 2024)
- ML20212A686 + (01:49:15, 6 December 2024)
- ML20212A684 + (01:49:15, 6 December 2024)
- ML20212A681 + (01:49:16, 6 December 2024)
- ML20212A676 + (01:49:18, 6 December 2024)
- ML20212A680 + (01:49:18, 6 December 2024)
- BSEP-97-0450, Revises Commitment to Provide Min of Sixteen Hours of Simulator Training Per Quarter Per Licensed Operator.Util Will Provide Simulator Training for Each Licensed Operator, as Part of Evaluation Element of SAT Process + (01:49:19, 6 December 2024)
- ML20212A675 + (01:49:19, 6 December 2024)
- ML20212A673 + (01:49:21, 6 December 2024)
- ML20212A670 + (01:49:22, 6 December 2024)
- ML20212A671 + (01:49:22, 6 December 2024)
- IR 05000302/1986018 + (01:49:25, 6 December 2024)
- ML20212A668 + (01:49:26, 6 December 2024)
- ML20212A667 + (01:49:26, 6 December 2024)
- ML20212A664 + (01:49:27, 6 December 2024)
- ML20212A662 + (01:49:43, 6 December 2024)
- CY-97-094, Provides NRC W/Results of Util Investigation Pertaining to Supplemental Response to CAL Issue,As Documented in Unrestricted Release Confirmatory Survey Program + (01:49:44, 6 December 2024)
- ML20212A659 + (01:49:44, 6 December 2024)
- ML20212A658 + (01:49:45, 6 December 2024)
- ML20212A655 + (01:49:46, 6 December 2024)
- IR 05000259/1986023 + (01:49:47, 6 December 2024)
- ML20212A651 + (01:49:47, 6 December 2024)
- 05000263/LER-1997-011, :on 970908,failure to Transfer HPCI & RCIC Suctions to Suppression Pool After Making Condensate Storage Tank Level Instrument Inoperable Occurred.Caused by Cognitive Personnel Errors.Procedures Reviewed + (01:49:49, 6 December 2024)
- ML20212A641 + (01:49:52, 6 December 2024)
- ML20212A638 + (01:49:55, 6 December 2024)
- PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph + (01:49:55, 6 December 2024)
- ML20212A635 + (01:49:56, 6 December 2024)
- ML20212A632 + (01:49:57, 6 December 2024)
- 05000263/LER-1997-010-01, :on 970916,failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10 Year Interval Occurred.Caused by Original Plant Drawings Incomplete.Controlled Drawings Will Be Revised + (01:49:58, 6 December 2024)
- ML20212A629 + (01:49:59, 6 December 2024)
- ML20212A627 + (01:50:10, 6 December 2024)
- PY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations + (01:50:18, 6 December 2024)
- ML20212A622 + (01:50:19, 6 December 2024)
- ML20212A621 + (01:50:20, 6 December 2024)
- PNO-III-86-072, on 860722,reactor Tripped While Operating at 90% Power.Caused by Workman Error While Attempting to Calibr Stator Cooling Water Pressure Switches.Util Will Proceed to Cold Shutdown for Repairs & Perform Snubber Surveillances + (01:50:21, 6 December 2024)
- ML20212A619 + (01:50:21, 6 December 2024)
- IR 05000298/1999008 + (01:50:22, 6 December 2024)
- 05000263/LER-1997-010, Forwards LER 97-010-00 Re Failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10-Yr Interval.Rept Contains Two New NRC Commitments + (01:50:23, 6 December 2024)
- ML20212A614 + (01:50:23, 6 December 2024)
- ML20212A608 + (01:50:25, 6 December 2024)
- ML20212A606 + (01:50:26, 6 December 2024)
- ML20212A607 + (01:50:26, 6 December 2024)
- PNO-II-86-048, on 860710,two Glaziers Employed by Util Contractor Fell 40 Ft After One End of Scaffolding Gave Way. Accident Occurred in New Simulator Training Bldg Outside Plant Security Fence.Men Taken to Hosp + (01:50:27, 6 December 2024)
- ML20212A605 + (01:50:27, 6 December 2024)
- ML20212A603 + (01:50:28, 6 December 2024)
- ML20212A602 + (01:50:30, 6 December 2024)