ML20212A686
| ML20212A686 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/10/1986 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 0611C, 611C, SL-945, NUDOCS 8607290101 | |
| Download: ML20212A686 (1) | |
Text
Georgia Fbwer Company 333 Piedmont Avanue Atlanta, Georgia 30308 Telephone 404 5264526 Mailing Address:
Fbst Office Box 4545 Atlanta, Georgia 30302 I eg CreorgiaPower L T. Gucwa P'e U W IF*
Manager Nuclear Safety and Licensing SL-945 0611C July 10,1986 U. S. Nuclear Regulatory Comission
REFERENCE:
Office of Inspection and Enforcement RII: JNG Region II - Suite 2900 50-321/50-366 101 Marietta Street, NW Inspection Atlanta, Georgia 30323 Report 86-08 ATTENTION: Dr. J. Nelson Grace Gentlemen:
Pursuant to telephone conversation with Mr. George Schnebli of your staff regarding the status of corrective action related to the subject Inspection Report, GPC provides the following information:
Unique MPL numbers have been assigned to each of the thermal relief valves on the RHR heat exchangers on both Units 1 and 2.
As Built Notices have been issued to update applicable drawings.
An update of the Equipment Location Index with the new MPL numbers has been initiated.
In addition, the RHR heat exchanger thermal relief valves have been labeled with their respective MPL numbers.
As part of the work control process, a procedure requirement for positive identification of components is being processed. Before work is to be done on a component, it will be positively identified, either by MPL number or physical description.
We expect this procedural requirement to be in place by August 4, 1986 Sincerely, WY %
L. T. Gucwa RDB/lc c: Georria Power Company Nuclear Regulatory Commission Mr.t. P. O'Reilly Senior Resident Inspector Mr. J. T. Beckham, Jr.
Mr. H. C. Nix, Jr.
GO-NORMS 8607290101 860710 PDR ADOCK 05000321 0611C p
PDR g
. -