Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19207B902 + (05:10:52, 5 January 2025)
- ML19207B901 + (05:10:53, 5 January 2025)
- ML19207B899 + (05:10:54, 5 January 2025)
- ML19207B900 + (05:10:54, 5 January 2025)
- ML19207B898 + (05:10:56, 5 January 2025)
- ML19207B897 + (05:10:56, 5 January 2025)
- ML19207B896 + (05:10:57, 5 January 2025)
- ML19207B894 + (05:10:59, 5 January 2025)
- ML19207B893 + (05:10:59, 5 January 2025)
- ML19207B892 + (05:11:00, 5 January 2025)
- ML19207B890 + (05:11:01, 5 January 2025)
- ML19207B889 + (05:11:02, 5 January 2025)
- ML19207B888 + (05:11:03, 5 January 2025)
- ML19207B887 + (05:11:03, 5 January 2025)
- ML19207B886 + (05:11:04, 5 January 2025)
- 05000313/LER-1979-013-03, /03L-0:on 790808,decay Heat Boron Concentration Was Not Monitored During Prescribed Interval & Inservice Decay Heat Loop Was Switched W/O Switching Sample Lineup. Caused by Communications Breakdown Between Depts + (05:11:06, 5 January 2025)
- 05000368/LER-1979-059-03, /03L-0:on 790730,during Mode 1 Operation,Power Supply Failed Causing Isolation of Control Room Ventilation. Caused by Circuitry Failure.Power Supply Was Repaired, Operationally Checked & Radiation Monitor Returned to Svc + (05:11:14, 5 January 2025)
- ML19207B883 + (05:11:15, 5 January 2025)
- 05000368/LER-1979-059, Forwards LER 79-059/03L-0 + (05:11:16, 5 January 2025)
- ML19207B879 + (05:11:17, 5 January 2025)
- ML19207B878 + (05:11:19, 5 January 2025)
- ML19207B875 + (05:11:20, 5 January 2025)
- ML19207B873 + (05:11:21, 5 January 2025)
- ML19207B872 + (05:11:22, 5 January 2025)
- ML19207B871 + (05:11:23, 5 January 2025)
- 05000313/LER-1979-013, Forwards LER 79-013/03L-0 + (05:11:24, 5 January 2025)
- ML19207B868 + (05:11:32, 5 January 2025)
- ML19207B867 + (05:11:33, 5 January 2025)
- ML19207B866 + (05:11:34, 5 January 2025)
- 05000278/LER-1979-024-01, /01T-0:on 790815,during Response Tests for IE Bulletin 79-02,three or Four Failed Anchor Bolts Were Found on Support to 3D RHR Pump Section Piping.Caused by Improper Installation.Bolts Replaced & Passed Insp + (05:11:35, 5 January 2025)
- ML19207B864 + (05:11:36, 5 January 2025)
- ML19207B863 + (05:11:37, 5 January 2025)
- ML19207B862 + (05:11:38, 5 January 2025)
- ML19207B861 + (05:11:39, 5 January 2025)
- ML19207B860 + (05:11:41, 5 January 2025)
- 05000278/LER-1979-024, Forwards LER 79-024/01T-0 + (05:11:42, 5 January 2025)
- ML19207B856 + (05:11:44, 5 January 2025)
- ML19207B855 + (05:11:44, 5 January 2025)
- ML19207B854 + (05:11:45, 5 January 2025)
- RAIO-0719-66435, LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application + (05:11:47, 5 January 2025)
- ML19207B853 + (05:11:47, 5 January 2025)
- ML19207B851 + (05:11:50, 5 January 2025)
- ML19207B848 + (05:11:51, 5 January 2025)
- ML19207B844 + (05:11:52, 5 January 2025)
- ML19207B842 + (05:11:53, 5 January 2025)
- ML19207B841 + (05:11:54, 5 January 2025)
- ML19207B840 + (05:11:55, 5 January 2025)
- ML19207B838 + (05:11:56, 5 January 2025)
- ML19207B837 + (05:11:57, 5 January 2025)
- ML19207B835 + (05:11:57, 5 January 2025)
- ML19207B834 + (05:11:58, 5 January 2025)