Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19209B262 + (03:54:55, 5 January 2025)
- ML19209B259 + (03:54:56, 5 January 2025)
- ML19209B256 + (03:54:58, 5 January 2025)
- 05000325/LER-1979-064-03, /03L-0:on 790908,while Performing Control Rod Operability Check,Rod 02-35 Had No Position Indication at Notch 46 When Driven In.Cause Not Found.All Rods Will Be Monitored During Operation & Rod Moving Penetrant Tests + (03:54:59, 5 January 2025)
- ML19209B254 + (03:55:00, 5 January 2025)
- ML19209B253 + (03:55:01, 5 January 2025)
- ML19209B250 + (03:55:03, 5 January 2025)
- 05000325/LER-1979-064, Forwards LER 79-064/03L-0 + (03:55:04, 5 January 2025)
- ML19209B246 + (03:55:05, 5 January 2025)
- ML19209B245 + (03:55:06, 5 January 2025)
- ML19209B244 + (03:55:07, 5 January 2025)
- 05000325/LER-1979-050-03, /03L-0:on 790904,during Normal Operation,Drywell Oxygen/Hydrogen Monitor CAC-1263 Was Observed Making Step Increase.Cause Unknown.Instrument Recalibr & Returned to Svc Satisfactorily + (03:55:08, 5 January 2025)
- ML19209B242 + (03:55:09, 5 January 2025)
- ML19209B241 + (03:55:10, 5 January 2025)
- ML19209B240 + (03:55:11, 5 January 2025)
- ML19209B239 + (03:55:12, 5 January 2025)
- ML19209B238 + (03:55:13, 5 January 2025)
- 05000325/LER-1979-050, Forwards LER 79-050/03L-0 + (03:55:14, 5 January 2025)
- 05000306/LER-1979-026-01, /01T-0:on 790919,during Power Reduction Below 90% Power,Axial Flux Difference Left Target Band While Power Was Still Above 90% Power.Caused by Operator Error.Power Reduced to Below 90% & Event Discussed W/Personnel + (03:55:16, 5 January 2025)
- ML19209B233 + (03:55:18, 5 January 2025)
- 05000306/LER-1979-026, Forwards LER 79-026/01T-0 + (03:55:19, 5 January 2025)
- ML19209B230 + (03:55:20, 5 January 2025)
- 05000338/LER-1979-106-03, /03L-0:on 790904,during Normal Operation,Steam Generator C Support Temp Dropped Below Tech Specs.Cause Unknown.Temp Returned to Normal within 4-h Time Limit. Heaters & Control Circuits Checked,But No Faults Found + (03:55:21, 5 January 2025)
- ML19209B228 + (03:55:23, 5 January 2025)
- 05000338/LER-1979-106, Forwards LER 79-106/03L-0 + (03:55:24, 5 January 2025)
- 05000333/LER-1979-061-03, /03L-0:on 790905,during HPCI Subsys Logic Functional Test,Switch 3 Associated W/Level Instrument 02-3-LIS-72D Did Not Properly Pick Up Follower Relay.Caused by Wiring Error During Installation of New Switch + (03:55:29, 5 January 2025)
- 05000333/LER-1979-061, Forwards LER 79-061/03L-0 + (03:55:30, 5 January 2025)
- 05000333/LER-1979-059-03, /03L-0:on 790904,during Normal Startup,Leaking Cell Was Noted in Station Battery B.No Cause Stated.Cell Was Jumpered & Battery Was Verified to Be Operable.When Replacement Is Available,Cell Will Be Replaced + (03:55:32, 5 January 2025)
- 05000333/LER-1979-059, Forwards LER 79-059/03L-0 + (03:55:34, 5 January 2025)
- ML19209B219 + (03:55:35, 5 January 2025)
- ML19209B217 + (03:55:35, 5 January 2025)
- ML19209B216 + (03:55:36, 5 January 2025)
- ML19209B215 + (03:55:36, 5 January 2025)
- ML19209B214 + (03:55:37, 5 January 2025)
- ML19209B213 + (03:55:38, 5 January 2025)
- ML19209B212 + (03:55:39, 5 January 2025)
- ML19209B211 + (03:55:40, 5 January 2025)
- ML19209B209 + (03:55:41, 5 January 2025)
- ML19209B208 + (03:55:42, 5 January 2025)
- ML19209B207 + (03:55:42, 5 January 2025)
- ML19209B205 + (03:55:43, 5 January 2025)
- ML19209B206 + (03:55:43, 5 January 2025)
- ML19209B203 + (03:55:44, 5 January 2025)
- ML19209B204 + (03:55:44, 5 January 2025)
- ML19209B202 + (03:55:45, 5 January 2025)
- ML19209B200 + (03:55:46, 5 January 2025)
- ML19209B201 + (03:55:46, 5 January 2025)
- ML19209B197 + (03:55:47, 5 January 2025)
- ML19209B199 + (03:55:47, 5 January 2025)
- IR 05000358/1979003 + (03:55:48, 5 January 2025)
- ML19209B194 + (03:55:49, 5 January 2025)