Forwards IE Insp Repts 50-317/79-10 & 50-318/79-08 on 790621-22.No Noncompliance Noted
ML19209B259
Person / Time
Site: Calvert Cliffs  
Issue date: 08/14/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19209B260 List:
References
NUDOCS 7910090388
Download: ML19209B259 (2)


See also: IR 05000317/1979010

Text

,

"tb

'

UNITED STATES

Sn nrog

o

NUCLEAR REGULATORY COMMisslON

g

o

R EGION l

$

$

$31 PARK AVENUE

f

KING OF PRUSSI A, PENNSYLVANIA 19406

\\...../

Docket Nos. 50-317

AUG 141979

50-318

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland

21203

Gentlemen:

Subject: Combined Inspection 50-317/79-10 and 50-318/79-08

This refers to the inspection conducted by Mr. D. Johnson of this office on June

21 and 22,1979 at Calvert Cliffs 1 and 2 of activities authorized by NRC License

Nos. DPR-53 and DPR-69 and to the discussions of our findings held by Mr. Johnson

with Messrs. R. Ash and S. Rittenhouse of your staff at the conclusion of the

inspection, and to a subsequent telephcne discussion between Mr. Johnson and Mr.

R. Ash on June 27, 1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specifi~ city the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

1114

128

7910090Nb

Q

.

.

Baltimore Gas and Electric Company

2

AUG 141979

No reply to this letter is required; however, if you should have any questions

cencerning this inspection, we will be pleased to discuss them with you.

Sincerely,

-

-

o _-

E1

. Brunner, Chief

Rea tor Operations and Nuclear

S pport Branch

Enclosure: Office of Inspection and Enforcement Combined Inspection

Report Numbers 50-317/79-10 and 50-318/79-08

cc w/ encl:

R. M. Douglass, Manager, Q';ality Assurance

L. B. Russell, Chief Engineer

W. Gibson, General Surervisce, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer

.

1114