IE Insp Repts 50-317/79-10 & 50-318/79-08 on 790621-22.No Noncompliance Noted.Major Areas Inspected:Response to IE Bulletins 79-01 & 79-01A & Environ Qualification of Class IE Equipment
ML19209B262
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/13/1979
From: Dante Johnson, Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19209B260 List:
References
50-317-79-10, 50-318-79-08, 50-318-79-8, NUDOCS 7910090393
Download: ML19209B262 (4)


See also: IR 05000317/1979010

Text

-

.

U.S. NUCLEAR REGULATORY COMMISSION '

0FFICE OF INSPECTION AND ENFORCEMENT

Region I

79-10

Report No.

79-08

50-317

Docket No.

50-318

DPR-53

C

-

License No.

DPR-69

Priority

Category

C

--

Licensee:

Baltimore Gas and Elect 'ic Comoany

'

P. O. Box 1475

Baltimore Maryland 21203

Facility Name:

Calvert Cliffs Units 1 and 2

Inspection at:

Baltimore, Maryland (BG&E Corporate Office)

'

Inspection conducted- June 21, 22,1979

7/V

79

Inspectors:

/e

D. F. Jdinson Reactor Inspector

9"

-

date signed

~

d+

igned

-

,

Approved by:

[

N

'

. R. Keimig,

ef Reac

Projects

[^***9""U

Section No. 1

R0 & NS

anch

Inspection Summary:

Inspection on June 21-22,1979 (Combined Report Nos. 50-317/79-10; 50-318/79-08)

Areas Inspected:

Routine announced inspection at the corporate office by a regional

based inspector of licensee actions in response to IE Bulletins 79-01 and 79-01A. The

inspection involved 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> at the BG&E Co. Corporate Office.

_Resul ts:

No items of noncompliance were identified.

.

1114

130

Region I Form 12

7910000 h

(Rev. April 77)

.

-

DETAILS

1.

Persons Contacted

  • R. Ash, Chief Nuclear Engineer
  • A. Marion, Senior Engineering Technician
  • S. Rittenhouse, Chief Electrical Engineer
  • denotes those present at the exit interview

2.

Environmental Qualification of Class IE Equipment

a.

Purpose of Inspection

An announced inspection was held at the Baltimore Gas and Electric

Company corporate office to review actions taken by the licensee

in response to IE Bulletins (IEB's) 79-01 and 79-01A.

b.

Scope of Inspection

The areas reviewed during this inspection encompassed those

matters addressed by IEB's 79-01 and 79-01A and the licensee's

actions with respect to the above.

The follow

1 items were inspected:

(1) Review of the licensee's response to IEB's 79-01 and 79-01A

dated Jur,e 13, 1979, to determine the following:

(a) Written response was within the time period stated in

the Bulletin.

(b) Written response includes the information required to

be reported.

(c) Written response includes adequate corrective action

commitments based on the information presented in the

Bulletin and licensee's response.

(d) Corrective action taken by the licensee was as described

in the written response.

(e)

Information discussed in the licensee's response was

accurate.

(2) Review of documentation and test results in support of the

environmental qualification of electrical components.

1114

131

.

-

3

c.

hspectionFindings

(i) The licensee has not completed the actions requested by IEB-

79-01 and 79-01A within the time frame specified and has

requested an extension.

The above item is being evaluated by the Division of Reactor

Operations Inspection, Office of Inspection and Enforcement.

This item is unresolved pending completion of the above

evsluation.

(317/79-10-01 and 318/79-08-01)

(2) The licensee's response does not address all the information

required to be reported by the subject IEB's.

The inspector discussed with licensee representative those

specific areas not addressed and stated that a revised

,

response should be prepared to include these items.

The licensee concurred with the inspector's comments and

agreed to submit a revised response.

This item is unresolved pending the licensee's action.

(317/79-10-03 and 317/79-08-03)

(3) The inspector stated that the licensee's response to actions

required by items 1 and 2 of Enclosure 1 to IEB-79-01A is

inadequate in that only one type of ASCO solenoid valve was

addressed.

The inspector further stated that the IEB required the

licensee to identify all types utilized in safety related

systems and determine if they are environmentally qualified.

The licensee concurred with the inspectofs comments and

agreed to' review applicable documentation and make physical

observations to determine whether ASCO solenoid valves are

used or. planned for use in safety-related systems and if so,

would provide an evaluation as to their environmental

qualification.

In addition, any solenoid valves identified

as not qualified would be repalied or replaced.

This item is unresolved pending the licensee's action.

(317/79-10-03 and 317/79-08-03)

(4) The inspector stated that review of the submitted data in

support of environmental qualification of electrical equipment

appears to be lacking in specific areas addressed in IE

Circular 78-08, such as, terminal blocks, connectors,

penetrations, limit switches and cable splices.

1114

132

..

4

The licensee stated that the above electrical equipment had

been evaluated but not included in the data submitted.

This

information was readily available and would be included in a

re-submittal, as requested by the inspector.

This is an unresolved item pending action by the licensee

(317/79-10-04 and 318/79-08-04)

Unresolved Items

Unresolved items are matters about which more information is required

in order to ascertain whether they are acceptable items, or items of

noncompliance.

The items discussed in paragraph 2 remain unresolved.

4.

Exit Interview

The inspector met with licensee representatives (denoted in Paragraph

1) at the conclusion of the inspection and summarized the purpose,

scope and findings of the inspection.

Mr. V. Thomas, Senior Instrumenta-

ti_on and Controls Engineer, IE:P1 was present during a portion of the

1.nspection.